Loading...
Bid award for the Lewis County Animal Shelter Septic Project BEFORE THE BOARD OF COUNTY COMMISSIONERS OF LEWIS COUNTY, WASHINGTON CONTRACT AWARD FOR INSTALLATION OF ) SEPTIC TREATMENT SYSTEMS AT THE ) RESOLUTION NO. 15- 2 7y LEWIS COUNTY ANIMAL SHELTER ) WHEREAS, the on-site sewage treatment system is not adequate to serve the needs of the facility and is in need of replacement; and WHEREAS, Lewis County has issued a Call for Bids for provision of such equipment, and labor, to provide and install two on site systems, one for domestic waste and one for animal waste, as per engineers drawings and specifications; and WHEREAS, Lewis County received 3 responses to said Bid Call and the results are as follows: Brumfield Construction, Inc., Westport, WA$61,879.00 DJ's Plumbing, LLC, Centralia, WA$69,620.00 Northwest Cascade, Inc. Puyallup, WA$84.250.00; WHEREAS, Brumfield Construction of Westport, WA submitted the lowest responsible bid of $61,879.00; NOW THEREFORE, BE IT RESOLVED, by the Board of County Commissioners (BOCC), that the County awards the contract for the Installation of Septic Systems at the Lewis County Animal Shelter to Brumfield Construction, Inc.; and BE IT FURTHER RESOLVED, that the Director of Central Services is hereby authorized to prepare said contract and to sign on behalf of the BOCC. PASSED IN REGULAR SESSION THIS 2.8 DAY OF SQ.0-ernbcr , 2015. APPROVED AS TQ FORM: BOARD OF COUNTY COMMISSIONERS Jonathan Mey , cuting Attorney LEWIS COUNTY, WASHINGTON ^ •®•®®•• • scouN'rx�•• / 7 / * nPRD 6,'Ise•• By: ..•- - - -: - - Deputy o'sc�cuting c,• Edna J. Fund, Chair V Attorney •g( SINCE 1-8• • 1845 ��1 • , / f ATTES ,.4, v)), sd,\CV: ft rri Muir, CMC, Clerk of the Board.•:®• P., . Schulte, Vice Char y Gary Stamper, Commissi ner Executive Summary BOCC Meeting Date: 2015-09-28 Contact: Doug Carey Department: Central Services Wording Contract Award for the Animal Shelter Septic Project Description Lewis County Central Services, Facilities Division solicited bids for the installation of two septic systems to replace one failing treatment system located at the Lewis County Animal Shelter. The current system utilizes a drip emitter drain field to distribute treated effluent. This system was professionally designed but does not work well for the treatment of animal waste, due to large volumes of hair and other solids in the effluent stream. The two new systems will separate domestic waste from animal waste and distribute effluent into two separate drain fields, each designed to properly handle each type of waste. Lewis County received 3 responsive bids for this project: Brumfield Contruction, Inc., Westport, WA $61,879.00 DJ's Plumbing, LLC, Centralia, WA $69,620.00 Northwest Cascade, Inc. Puyallup, WA $84.250.00 Brumfield Construction submitted the lowest responsible bid of$61,879.00. Recommendation Staff recommends that the BOCC award the contract for the Animal Shelter Septic Project to Brumfield Construction, Inc. Other BOCC AGENDA ITEM SUMMARY Resolution #: 1 S- 2 i7 LI BOCC Meeting Date: Sep 28, 2015 Suggested Wording for Agenda Item: Agenda Type: Consent Contract Award for the Animal Shelter Septic Project RECEIVED Brief Reason for BOCC Action: SEP 21 2015 Listing of bids and award of contract for the Animal Shelter Septic Project. LEWIS CO. PROS. ATTY. Submitted By: Carey, Doug Phone: x1192 Date Submitted: Sep 17, 2015 Contact Person Who Will Attend BOCC Meeting: Doug Carey Action Needed: Approve Resolution Publication Requirements: Hearing Date: Publications: Publication Dates: Approvals: User Group Status Strozyk, Michael Central Services Pending -C r-ter, G— enn Prosecutor j Pending