Loading...
NOH: Proposed vaction of a portion of unmaintained Newaukum Station to Newaukum Prairie Rd. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF LEWIS COUNTY, WASHINGTON IN THE MATTER OF: } RESOLUTION NO. 15,cD The proposed vacation of a portion of } unmaintained Newaukum Station to } Newaukum Prairie Road, Chehalis } WHEREAS, RCW 36.87 allows for the vacation of a county road that is found useless to the needs of the County pending a Report of the County Engineer; and WHEREAS, Resolution 15-209, passed by the Board of County Commissioners (BOCC) on July 13, 2015, directed the County Engineer to examine a portion of unmaintained Newaukum Station to Newaukum Prairie Road, Chehalis, and report his opinion to the BOCC; and WHEREAS, as required by RCW 36.87, on the 30th day of September, 2015, the Report of the County Engineer on the matter of the proposed vacation of the following described portion of unmaintained Newaukum Station to Newaukum Prairie Road, Chehalis was filed in the office of the BOCC, to wit: All that part of Newaukum Station to Newaukum Prairie Road beginning at a point where the South line of Section 24, Township 13 North, Range 2 West, W.M., intersects the West line of the Julian Bernier Donation Land Claim, thence Southeasterly along the West line of said Donation Land Claim to the Northerly right of way line of the Forest Napavine Road. WHEREAS, the report and all related materials having been reviewed by the BOCC and found appropriate for further proceedings, NOW, THEREFORE, BE IT RESOLVED that the 2nd day of November, 2015 at or after the hour of 10:00 a.m., in the BOCC Hearing Room on the 2nd floor of the Historic Courthouse in Chehalis, Washington, has been fixed by the BOCC as the time and place for the hearing on the Engineer's Report, when and where all persons may appear and be heard upon the report and upon the matter of the vacation of the roads. BE IT FURTHER RESOLVED that the Clerk of the Board is hereby instructed to proceed with all necessary notifications, posting and publication. DONE IN OPEN gE£ ►1 TI th day of October, 2015. o4, / • BOARD OF COUNTY COMMISSIONERS • SINCE ; •"�i. �Ty LEA,COUNTY, WA HING TON B0 145 41 * • ` ATTE T: ,* •//•///4 A ∎ eo'" Edna ., Ch-• '' /Aka . i _ �?v}. Est�•� Karri Muir, CMC, Clerk o the 5•• `. ��_ County Board of County Commissioners P. hult', i e Chair Nov APPROVED A - ' FORM: Gary S/amper, Co issioner Jonath e , Prosecuting Attorney By: ' i ►" Y: � Ci'll7puty NOTICE OF HEARING NOTICE IS HEREBY GIVEN that on the 30th day of September, 2015, the Engineer's Report on the matter of the proposed vacation of a portion of unmaintained Newaukum Station to Newaukum Prairie Road, Chehalis was filed in the office of the County Commissioners of Lewis County, Washington, said road described as follows, to wit: All that p art of Newaukum Station to Newaukum Prairie Road beginning at a point where the South line of Section 24, Township 13 North, Range 2 West,W.M., intersects the West line of the Julian Bernier Donation Land Claim, thence Southeasterly along the West line of said Donation Land Claim to the Northerly right of way line of the Forest Napavine Road. Said report and all related materials having been reviewed by the Board and found appropriate for further proceedings and that the 2nd day of November, 2015 at or after the hour of 10:00 a.m., in the Commissioners Hearing Room on the 2nd floor of the Historic Courthouse in Chehalis, Washington, has been fixed by said Board as the time and place for the hearing on said Engineer's Report, when and where all persons may appear and be heard upon said report and upon the matter of the vacation of said road. DATED this 5th day of October, 2015. hJc� `1"Y11 1 ._ Karri Muir, CMC, Clerk of the Lewis County Board of County Commissioners Publish: The East County Journal October 7th and October 14th, 2015 a \--, AO.viik \ i oppriv Z 0 iii,cGliki sti— I I \ Ilk lk I 11 IW ! 1 k li k # % s s% , V II i cC OA* 0, . s_a co g ° E Y liji'i f0 3 z ,400 c 0 c \ I1ii E i ilk K z a, sn 0 1 I 10 0. 2 \ . 1. eN s \1k g Allo) 1 1 IN THE MATTER OF: } The Order of the Lewis County Board of } Commissioners for the proposed vacation of a portion of } Newaukum Station to Newaukum Prairie Road,Chehalis } ENGINEERS REPORT TO THE BOARD OF COUNTY COMMISSIONERS: I,the undersigned County Engineer of Lewis County, Washington,to whom was referred on the 13th day of July, 2015 by Resolution 15-209, ordering me to examine all that part of Newaukum Station to Newaukum Prairie Road beginning at a point where the South line of Section 24,Township 13 North, Range 2 West, W.M., intersects the West line of the Julian Bernier Donation Land Claim,thence Southeasterly along the West line of said Donation Land Claim to the Northerly right of way line of the Forest Napavine Road,stating that the Board of County Commissioners(BOCC) intends to proceed to determine whether said road should be vacated and abandoned for the reason that it is useless as a part of the County road system and that the public will be benefited by its vacation and abandonment,herewith submit my report thereon: FIRST:Newaukum Station to Newaukum Prairie No.108 Road was petitioned for by residents of the area on April 20, 1876,viewed on August 8, 1876 by three persons appointed by the BOCC to view and locate the county road petitioned for,and was surveyed June 19, 1876. Although the road does not appear to have been formally established, it was established through its use by the public in territorial times prior to the petition being filed. SECOND: A 1912 vacation of a portion of Newaukum Station to Newaukum Prairie Road adjoins this proposed vacation on its north side and also reduced the right of way width of this proposed vacation area from 60 feet to 40 feet. THIRD: The right of way is adjoined by three property owners,Teitzel Family LLC, Teitzel-Selchert LLC and Druckman Family LLC all who have requested the vacation. FOURTH: Utility companies known to service the general area have been contacted and have acquired all necessary easements for their utilities. FIFTH: The portion of right of way does not abut a body of water,nor is the right of way necessary as part of the county road system. SIXTH: The $700.00 Administration fee for the vacation has been paid by the applicant. The applicant has also deposited$200.00 for legal publication fees.No compensation is required for that portion of right of way per LCC 12.15.040. In my opinion,this portion of right of way is considered useless and should be vacated for the reason that the public will be benefited by its vacation,returning the property to the tax rolls. I include with this report a map showing the roa pr posed to be vacated. Respec lly sub ';•d this / day of a® 2015. • .11 Tim Else, P.E., Director/ ounty Engineer Executive Summary BOCC Meeting Date: 2015-10-05 Contact: Tim Elsea Department: Public Works Wording The proposed vacation of a portion of unmaintained Newaukum Station to Newaukum Prairie Road, Chehalis Description Resolution 15-209, passed by the Board of County Commissioners on July 13, 2015, declared its intent to vacate a portion of unmaintained Newaukum Station to Newaukum Prairie Road, Chehalis, and instructed the County Engineer to examine the road and report his opinion on the vacation, as required by RCW 36.87.010. The three property owners adjoining that portion of unmaintained Newaukum Station to Newaukum Prairie Road have requested the vacation. Utility companies known to service the general area have been notified and have acquired all the necessary easements for their utilities lying within the area to be vacated. The County Engineer has prepared his report on the matter, which is hereby submitted. Recommendation Acceptance of the report and passing the attached resolution would set a November 2, 2015 hearing date for consideration of the matter. RCW 36.87.050 requires publication at least once a week for two consecutive weeks preceding the date fixed for the hearing in the county official newspaper and that a copy of the notice be posted for at least twenty days preceding the date fixed for hearing at each termini of the county road or portion thereof proposed to be vacated. Other BCC AGENDA ITEM summARy Resolution #: 15- 283 BOCC Meeting Date: Oct 05, 2015 Suggested Wording for Agenda Item: Agenda Type: Notice The proposed vacation of a portion of unmaintained Newaukum Station to Newaukum Prairie Road, Chehalis Brief Reason for BOCC Action: This Resolution acknowledges receipt of an Engineer's Report on the proposed vacation of a portion of unmaintained Newaukum Station to Newaukum Prairie Road, Chehalis, sets a hearing date, and calls for necessary notifications,postings and publications. Submitted By: Snelson, Greg Phone: 740-2697 RECEIVED Date Submitted: Sep 21, 2015 Contact Person Who Will Attend BOCC Meeting: Tim ElseaE 2 2015 Action Needed: Notice for Public Hearing LEWIS CO. PROS. ATTY. Publication Requirements: Hearing Date: Nov 02, 2015 Publications: The East County Journal Publication Dates: Oct 07, 2015 , Oct 14, 2015 Approvals: User Group Status i E Elsea, Tim , Pending "-U Additional Copies Kim Amrine-Admin Larry Unzelman-Real Estate Services Manager Greg Snelson-Property Management Division Tech III Mike Barr-Traffic Control Supervisor NOTICE OF HEARING NOTICE IS HEREBY GIVEN AFFIDAVIT OF PUBLICATION that on September 30,2015,the Engineer's Report on the matter of the.ro..sed vacation of a.'Ohm of STATE OF WASHINGTON COUNTY OF LEWIS 1 SS w , in the Office of of datin.qCommissioners(BOCC) oklaawit qty,Was slid The undersigned,on oath state that he/she is an authorized representative rgad4140t 0dis folio iI: of The East County Journal,a weekly newspaper,which newspaper is a legal newspaper of general circulation and it is now and has been for more N Line of than six month prior to the date of publication hereinafter referred to, t S published in the English language continuously as a weekly newspaper Stir t. `�shi� 13 , .WI `intersects in Morton, Lewis County,Washington, and it is now and during all of ,„ 7uliae said time was printed in an office maintained at the aforesaid place of Donat on" snit`Claim, ence publication of this newspaper. The notice in the exact form annexed, was published in regular issues N M of The East County Journal which was regularly distributed to its i:eutr $' t ' subscribers during the below stated period. ., the C The annexed notice,a a� `"` ;,<< Od 4 , f/.�- % • ,ga� ail Z � ` qtr of f f n /� 1 „� it-,mr. 0.! , ,oor of /7 iL lJ,� C�.�d t 5,4 j"`1/' ¢ :tithe 1CC as the place for the s published on hstetgoei saitt 's Report, s , an Pe may D� .�- f W A S aPPear Atot be heard upon said report and upein the matter of the vacation of said toad. The amount of the fee charged for the foregoing publication is the sum DATED this 5d41,14 of October,' �r 2015..;,,- - of$ lr• K � Muir,CMC, Clerk o f e a IQ�� n V.S ��J Cou n .�,, �'e of County C � 4 i� Published in The East C��Subscribed and sworn to before me this / day of � �.J ) `° be 14, `"�,. tt'' Notary Public in and for the ,� , > ', State of Washington r ,' �' Residing in ka t:c c> .AN., . T