Initiating a county road construction project and assigning a County Road Project Number BEFORE THE BOARD OF COUNTY COMMISSIONERS
OF LEWIS COUNTY, WASHINGTON
IN THE MATTER OF:
Initiating a county road construction project and }
assigning a County Road Project (CRP) number } RESOLUTION NO. 18- G147
IT IS HEREBY RESOLVED THAT the project listed below be constructed as shown. This project is
hereby declared to be public necessity and made a part of the officially adopted annual road program in
accordance with RCW 36.81.130. The county road engineer is hereby ordered and authorized to report and
proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, & 36.80.070)
IT IS HEREBY RESOLVED THAT expenditures from the officially adopted road fund budget and based
on the county road engineer's estimates are hereby made in the amounts and for the purposes shown:
1 2 3 4 5 6 7 8 9
Type of a Cost Estimate Annual
Road Name Road Work v o (Thousands) Constr CRP
and/or Bridge Log (see code) c - Prog. No.
Number No. o No.
M.P. to M.P. v o Eng. & R/W Construction
0 Grant Local Grant Local
Townsend Bridge No. 65605 0.22 - I X 187 29 1,275 199 2186
223 Replacement
(4)Type of Work Code (5)The construction is to be accomplished by contract in
A. Preliminary Engineering accordance with RCW 36.77.020 et. seq.
B. Right of Way
C. Grading, Draining, Surfacing (6) The construction is to be accomplished by county forces
D. Light Bit. Surf.Treatment in accordance with RCW 36.77.065 and WAC 136-18.
E. A.C. or P.C.C. Pavement
F. Curbs and Gutters
G. Sidewalks
H. Traffic Facilities
I. Bridge Construction
J. Paths&Trails(RCW 47.30)
Page 1 of 2
ADOPTED in regular session this 29th day of January, 2018.
APPROVED AS s FORM: BOARD OF COUNTY COMMISSIONERS
Jona .A. r L. i-y=I
Prosecuting Attorney LEWIS COUNTY, WASHINGTON/ "Th &,("6/ ,..
,,,
By: De j °rosecuting Attorney Edna J Fund, C r
41(-__ 07,iV(e -) ie 4—-----—
ATTEST: Robert C. Jackson, Vice Chair
--1_,/-e---yeti_e4r-e-02--) A-i S(Ad /
Rieva Lester, Clerk of the Lewis County Gary Stamper, Commissioner
Board of County Commissioners
•• •6•
S• jS co uiv- 0,
• k / •
• ./ -•
• i SINCE ` �•
•� o•
• *�\ - 1845 Q rQ
•4 \), �.c-/ "•
�a{ ���0'vrt,i Sb � \-
Page 2 of 2
BOCC AGENDA ITEM SUMMARY
Resolution: BOCC Meeting Date: Jan 29, 2018
Suggested Wording for Agenda Item: Agenda Type: Consent
Initiating a county road construction project and assigning a County Road Project (CRP) number.
Contact Erik Martin Phone: 2697
Department: Public Works
Action Needed: Approve Resolution
Description
Pursuant to RCW 36.75.050,the Board of County Commissioners shall by resolution, and not otherwise, order
the survey,establishment, construction, alteration, or improvement of county roads and bridges; the county road
engineer shall prepare all necessary maps, plans, and specifications; therefore, showing the right of way widths,
the alignments, gradients, and standards of construction.
The Townsend Bridge No. 223 Replacement Project was awarded Federal Highway Bridge Program grant
funding ($1,462,120) on December 6, 2017.
The signing of the attached resolution will establish an official CRP number and authorize the preliminary
engineering, right of way, and construction improvements for the Townsend Bridge No. 223 Replacement
Project. The CRP number will follow the project through completion.
The format of the resolution to formally establish CRP numbers follows the recommended format of the County
Road Administration Board (CRAB).
Approvals:
•
User Group Status
Martin, Erik ; Pending
BOCC Pending
Prosecutor Pending
Budget Pending !,
/94"
Additional Copies
Mike Kroll-PW
Kim Amrine-PW
Tim Fife-PW