Loading...
Initiating a county road construction project and assigning a County Road Project Number BEFORE THE BOARD OF COUNTY COMMISSIONERS OF LEWIS COUNTY, WASHINGTON IN THE MATTER OF: Initiating a county road construction project and } assigning a County Road Project (CRP) number } RESOLUTION NO. 18- G147 IT IS HEREBY RESOLVED THAT the project listed below be constructed as shown. This project is hereby declared to be public necessity and made a part of the officially adopted annual road program in accordance with RCW 36.81.130. The county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, & 36.80.070) IT IS HEREBY RESOLVED THAT expenditures from the officially adopted road fund budget and based on the county road engineer's estimates are hereby made in the amounts and for the purposes shown: 1 2 3 4 5 6 7 8 9 Type of a Cost Estimate Annual Road Name Road Work v o (Thousands) Constr CRP and/or Bridge Log (see code) c - Prog. No. Number No. o No. M.P. to M.P. v o Eng. & R/W Construction 0 Grant Local Grant Local Townsend Bridge No. 65605 0.22 - I X 187 29 1,275 199 2186 223 Replacement (4)Type of Work Code (5)The construction is to be accomplished by contract in A. Preliminary Engineering accordance with RCW 36.77.020 et. seq. B. Right of Way C. Grading, Draining, Surfacing (6) The construction is to be accomplished by county forces D. Light Bit. Surf.Treatment in accordance with RCW 36.77.065 and WAC 136-18. E. A.C. or P.C.C. Pavement F. Curbs and Gutters G. Sidewalks H. Traffic Facilities I. Bridge Construction J. Paths&Trails(RCW 47.30) Page 1 of 2 ADOPTED in regular session this 29th day of January, 2018. APPROVED AS s FORM: BOARD OF COUNTY COMMISSIONERS Jona .A. r L. i-y=I Prosecuting Attorney LEWIS COUNTY, WASHINGTON/ "Th &,("6/ ,.. ,,, By: De j °rosecuting Attorney Edna J Fund, C r 41(-__ 07,iV(e -) ie 4—-----— ATTEST: Robert C. Jackson, Vice Chair --1_,/-e---yeti_e4r-e-02--) A-i S(Ad / Rieva Lester, Clerk of the Lewis County Gary Stamper, Commissioner Board of County Commissioners •• •6• S• jS co uiv- 0, • k / • • ./ -• • i SINCE ` �• •� o• • *�\ - 1845 Q rQ •4 \), �.c-/ "• �a{ ���0'vrt,i Sb � \- Page 2 of 2 BOCC AGENDA ITEM SUMMARY Resolution: BOCC Meeting Date: Jan 29, 2018 Suggested Wording for Agenda Item: Agenda Type: Consent Initiating a county road construction project and assigning a County Road Project (CRP) number. Contact Erik Martin Phone: 2697 Department: Public Works Action Needed: Approve Resolution Description Pursuant to RCW 36.75.050,the Board of County Commissioners shall by resolution, and not otherwise, order the survey,establishment, construction, alteration, or improvement of county roads and bridges; the county road engineer shall prepare all necessary maps, plans, and specifications; therefore, showing the right of way widths, the alignments, gradients, and standards of construction. The Townsend Bridge No. 223 Replacement Project was awarded Federal Highway Bridge Program grant funding ($1,462,120) on December 6, 2017. The signing of the attached resolution will establish an official CRP number and authorize the preliminary engineering, right of way, and construction improvements for the Townsend Bridge No. 223 Replacement Project. The CRP number will follow the project through completion. The format of the resolution to formally establish CRP numbers follows the recommended format of the County Road Administration Board (CRAB). Approvals: • User Group Status Martin, Erik ; Pending BOCC Pending Prosecutor Pending Budget Pending !, /94" Additional Copies Mike Kroll-PW Kim Amrine-PW Tim Fife-PW