Loading...
Notice of Hearing: Proposed Vacation of a portion of Workman Road Extension BEFORE THE BOARD OF COUNTY COMMISSIONERS OF LEWIS COUNTY, WASHINGTON IN THE MATTER OF: } RESOLUTION NO. l -D 7 The proposed vacation of a portion of } Workman Road Extension } WHEREAS, RCW 36.87 allows for the vacation of a county road that is found useless to the needs of the County pending a Report of the County Road Engineer; and WHEREAS, Resolution 17-202, passed by the Board of County Commissioners (BOCC) on July 10, 2017, directed the County Road Engineer to examine a portion of the Workman Road Extension right of way, and report his opinion to the BOCC; and WHEREAS, as required by RCW 36.87, on February 15, 2018, the report of the County Road Engineer on the matter of the proposed vacation of the following described portion of Workman Road Extension right of way, was filed in the office of the BOCC, to wit: All that part of Workman Road Extension in the Northeast Quarter of Northwest Quarter (NE1/4 NW1/4) of Section 21, Township 12 North, Range 3 East, W.M., and in the Southeast Quarter of the Southwest Quarter (SE1/4 SW1/4) of Section 16, Township 12 North, Range 3 East, W.M., beginning at a point 115 feet West of the Quarter Corner between said Sections 16 and 21, thence West to the terminus of the Workman Road Extension. WHEREAS, the report and all related materials having been reviewed by the BOCC and found appropriate for further proceedings. NOW, THEREFORE, BE IT RESOLVED that March 26, 2018, at or after the hour of 10:00 am., in the BOCC Hearing Room on the 2nd floor of the Historic Courthouse in Chehalis, Washington, has been fixed by the BOCC as the time and place for the hearing on the County Road Engineer's Report, when and where all persons may appear and be heard upon the report and upon the matter of the vacation of that road described above. BE IT FURTHER RESOLVED that the Clerk of the Board is hereby instructed to proceed with all necessary notifications, posting and publication. DONE IN OPEN SESSION this February 26, 2018. APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS Jonath- ''- • - Prosecuting Attorney L COUNTY, ' -HIN TON iwor eAditi fL_ By :tom seputy ! Es•� J. Fund, 0' -117 / •••GOUNTy ••• . 4400 ILif , L W ATTEST: ••14� 0 D o,�s� 'o rt C. J-ckson, Vice Chair o• � / 5 � / SINCE Rieva Lester, Clerk of the Lewcuntyl Fiord w� *nary Stamper, Commissioner of County Commissioners t� L1 r colvn• �<< •''•f�3Gir, ;TS �e IN THE MATTER OF: } The Order of the Lewis County Board of Commissioners for } ENGINEERS REPORT the proposed vacation of a portion of Workman Road Extension } TO THE BOARD OF COUNTY COMMISSIONERS: I,the undersigned County Engineer of Lewis County, Washington, to whom was referred on the 10th day of July, 2017 by Resolution 17-202, ordering me to examine all that portion of Workman Road Extension in the Northeast Quarter of the Northwest Quarter(NE1/4NW1/4) of Section 21, Township 12 North, Range 3 East, W.M., and in the Southeast Quarter of the Southwest Quarter (SE1/4SW1/4) of Section 16, Township 12 North, Range 3 East, W.M., stating that said Board intends to proceed to determine whether said road should be vacated and abandoned for the reason that it is useless as a part of the County road system and that the public will be benefited by its vacation and abandonment, herewith submit my report thereon: FIRST: This portion of road right of way was declared by the Lewis County Board of County Commissioners to be a county road on March 1, 1990 by Resolution 90-07. SECOND: Three property owners abut said right of way and all have requested this vacation. THIRD: This portion of right of way does not abut a body of water, nor is the right of way necessary as part of the county road system. FOURTH: Current county road standards require a turnaround at the end of the road. The Property Owner has conveyed the right of way necessary for such turnaround to the County. The deed for said conveyance will be held unrecorded by the County until this road vacation is complete. FIFTH: Property Owner's conveyance of the right of way for turnaround is in lieu of payment of vacation administrative fees and publication costs associated with this vacation. The value of the turnaround right of way is equal to or greater than those costs. SIXTH: Easements have been granted amongst the adjoining property owners to provide for access after the right of way is vacated. SEVENTH: Utility companies known to service the general area have been contacted and are not opposed to the vacation. In my opinion, this portion of right of way should be vacated for the reason that the public will be benefited by its vacation,returning the property to the tax rolls. I include with this report a map showing the road proposed to be vacated. Respectfully bmitted this .ay of J ,2018. Tim Fife, P.E., County Engineer NOTICE RCW 36.87 allows for the vacation of a county road that is found useless to the needs of the County pending a Report of the County Road Engineer. Resolution 17-202, passed by the Board of County Commissioners (BOCC) on July 10, 2017, directed the County Road Engineer to examine a portion of the Workman Road Extension right of way, and report his opinion to the BOCC. On February 15, 2018, the Engineer's Report on the matter of the proposed vacation of the below described portion of Workman Road Extension right of way, was filed with the BOCC. The report and all related materials having been reviewed by the BOCC and found appropriate for further proceedings. This resolution sets March 26, 2018, at or after the hour of 10:00 a.m., in the BOCC Hearing Room on the 2nd floor of the Historic Courthouse in Chehalis, Washington, as the time and place for the hearing on the County Road Engineer's Report. The resolution also calls for the Clerk of the Board to proceed with all necessary notifications, posting and publication. All that part of Workman Road Extension in the Northeast Quarter of Northwest Quarter (NE1/4 NW1/4) of Section 21, Township 12 North, Range 3 East, W.M., and in the Southeast Quarter of the Southwest Quarter (SE1/4 SW1/4) of Section 16, Township 12 North, Range 3 East, W.M., beginning at a point 115 feet West of the Quarter Corner between said Sections 16 and 21, thence West to the terminus of the Workman Road Extension. Dated: February 26, 2018 Rieva Lester Clerk of the Lewis County Board of County Commissioners Publish: Chronicle February 27, 2018 March 6, 2018 Ego ..,.. . -.%,-.4,-,, 4 4, ,z uoq;..s 1 r_________,_.,0 L.,9I uogaaS !Z tiogaaS C O C C • X I j 'U> W c x 4 a c Ri � Y r E 7- .6 ; c if o o ► T, o $ C) v ' .3 §l O n 4 vf, L C v O C] 41 Y O 0 71 in yl O - C 0 ,4 cD u CD > 1 t 91 uoiPaS I7. SUS c`I uogDaS N_ - �ti ., i O uOq 7,......S z �O cc I— x ' ) i BOCC AGENDA ITEM SUMMARY Resolution: BOCC Meeting Date: Feb 26, 2018 Suggested Wording for Agenda Item: Agenda Type: Notice The proposed vacation of a portion of Workman Road Extension Contact Erik Martin Phone: 1183 Department: Public Works Action Needed: Notice for Public Hearing Description Property Owners have requested the vacation of a portion(approx. 275 feet) of the Workman Road Extension, East of Mossyrock. RCW 36.87 allows for the vacation of a county road that is found useless to the needs of the County pending a Report of the County Road Engineer. Resolution 17-202,passed by the Board of County Commissioners(BOCC) on July 10,2017, directed the County Road Engineer to examine a portion of the Workman Road Extension right of way, and report his opinion to the BOCC. On February 15, 2018, the Engineer's Report on the matter of the proposed vacation of a portion of Workman Road Extension right of way, was filed with the BOCC. The report and all related materials having been reviewed by the BOCC and found appropriate for further proceedings. This resolution sets March 26, 2018, at or after the hour of 10:00 a.m., in the BOCC Hearing Room on the 2nd floor of the Historic Courthouse in Chehalis, Washington, as the time and place for the hearing on the County Road Engineer's Report. The resolution also calls for the Clerk of the Board to proceed with all necessary notifications,posting and publication. Approvals: User ! Group Status Amrine,Kim Public Works Pending Martin, Erik Public Works Pending Fife,Tim Public Works ` Pending Additional Copies Tim Fife Kim Amrine Larry Unzelman AFFIDAVIT I, "le-4-CrG t. s - do hereby certify that on the Z. "f day of YY) .r Gil , 2018, I received two copies of Resolution No.18-072 from the Clerk of the Board of County Commissioners, Lewis County, Washington, in regard to a hearing on the Engineer's Report concerning the proposed vacation of a portion of Workman Road Extension, and on the 2""day of ina 1- , 2018, I posted the same, one on each end of said portion of road. Dated at Chehalis, Washington, this 2" (day of m a r.L , 2018. Subscribed and sworn to before me this. day of tc\i\ , 2018. •• s co UAr •• �� 04 0�OVs• • •jio SINCE % \ . i rNC,,O� ISSl�S t • • •�UNSlstcc •` 102795 AFFIDAVIT NOTICE RCW 36.87 allows for the OF PUBLICATION vacation of a county road that is found useless to the needs STATE OF WASHINGTON of the County pending a Report of the County Road COUNTY OF LEWIS Engineer. Resolution 17-202, passed by the Board of County t,Commissioners (BOCC) on ►duly 10, 2017, directed the Amanda Curry.and/or Kim Proffitt,says that she is the legal clerk County Road Engineer td of examine a portion of the w Workman Road Extension right 'of way, and report his opinion to the BOCC.On February 15, Eijroiutt Q 2018,the Engineers Report on e the matter of the proposed vacation of the below descri- bed portion of Workman Road a semi-weekly newspaper,which has been established,published Extension right of way, was English language,and circulated continuously as a filed with the BOCC. The in the En g Y report and all related materials semi-weekly newspaper in the City of Centralia,and in Lewis 'having been reviewed by the County,Washington,general circulation in Lewis County for BOCC and found appropriate for further proceedings. This more than six(6)months prior to the date of the first publication resolution sets March 26, of the notice hereto attached,and that the said Chronicle was on 2018, at or after the hour of the 7th day of July 1941.approved as a legal newspaper by the '10:00 a.m., in the BOCC Hearing Room on the 2nd floor Superior Court of said Lewis County.And that the attached is a of the Historic Courthouse in true copy and was published in regular issues(and not in Chehalis, Washington, as the supplement form)of said newspaper as LEGAL# 102795 RE: 'time and place for the hearing pp ' on the County Road Engi- 'neer's Report. The resolution once each l'.'O"t' fora period of 2 also calls for the Clerk of the Board to proceed with all necessary notifications, post- commencing on 02/27/2018 and ending on 03/06/2018 ing and publication. r All that part of Workman Road and both regularly distributed to its subscribers during all of said ;Extension in the Northeast period.That the full amount of the fee charged for the foregoing Quarter of Northwest Quarter ,(NE1/4 NW1/4) of Section 21, publication is the m of$52.44 rTownship 12 North, Range 3 I r l (1� east Quarter of the South Southwest t l� • ■�' Quarter (SE1/4 SW1/4) of ubscri ed and sworn to ore me 03/01/ 018 Section 16, Township 12 North, Range 3 East, W.M., ern 9 beginning at a point 115 feet }t * West of the Quarter Corner ..between said Sections 16 and Notary Public in and for the State of Washington. 21, thence West to the termi- nus of the Workman Road resi at 1 ‘6 4 tf'.± Extension. �j) n �j o ^ ) Mcy`� •�Q••BA �/6,'' Dated:February 26,2018 1+ �L L�l / �� 'FXP r• 4 IScs••irk. Rieva Lester �e i ...• ,Clerk of the Lewis County CC..' .`A� ',,Board of County :a 1� ,G '.Commissioners S' ` a:z.� ��� 2" Published:The Chronicle ••• rl�• ` ' February 27, 2018& March 6. ••.FFB. 251'c••''�"► ;2018 cS'/;'!rc of�S�P.a,