Loading...
Initiating County Road Construction Projects and assigning County Road Project Numbers BEFORE THE BOARD OF COUNTY COMMISSIONERS OF LEWIS COUNTY, WASHINGTON IN THE MATTER OF: Initiating county road construction projects and } assigning County Road Project (CRP) numbers } RESOLUTION NO. 18- 359 IT IS HEREBY RESOLVED THAT the projects listed below be constructed as shown. These projects are hereby declared to be public necessity and made a part of the officially adopted annual road program in accordance with ROW 36.81.130. The county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, & 36.80.070) IT IS HEREBY RESOLVED THAT expenditures from the officially adopted road fund budget and based on the county road engineer's estimates are hereby made in the amounts and for the purposes shown: 1 2 3 4 5 6 7 8 9 Type of a Cost Estimate Annual Road Name Road Work `13' 2O (Thousands) Constr CRP and/or Bridge Log (see code) - a- Prog. No. Number No. o c No. M.P. to M.P. 0 o Eng. & RNV Construction 0 Grant Local Grant Local 2019 Countywide 3R n/a - - ABODE X X 65 430 205 3 2187 Program (Title Category) 2019 Countywide Misc. n/a - - ABH X X 50 250 6 2188 Safety& Guardrail (4)Type of Work Code (5)The construction is to be accomplished by contract in A. Preliminary Engineering accordance with RCW 36.77.020 et. seq. B. Right of Way C. Grading, Draining, Surfacing (6) The construction is to be accomplished by county forces D. Light Bit. Surf.Treatment in accordance with RCW 36.77.065 and WAC 136-18. E. A.C. or P.C.C. Pavement F. Curbs and Gutters G. Sidewalks H. Traffic Facilities I. Bridge Construction J. Paths&Trails(RCW 47.30) ADOPTED in regular session this 3rd day of December, 2018. APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS Jonathan L.Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON "I—. i � / _•.// ...._...a.-4 k■_.I ■ By: ,■epu y -rosecuting Attorney dn. J. Fund, C lir PO 55 s ) / o lc_•cOUN ••• / I la"— ATTEST: �a 4, /6- +RD o�Zs•• Robert C. Jackson, Vice Chair 0 `� �� SINCE �+�o ce � + 1.845 Ri z: Rieva Lester, Clerk of the Lewis C ' i (�i *g Vacant Board of County Commissioners '. rco s �• • P o:o�;®• • Page 1 of 1 BOCC AGENDA ITEM SUMMARY Resolution: BOCC Meeting Date: Dec 03, 2018 Suggested Wording for Agenda Item: Agenda Type: Consent Initiating county road construction projects and assigning County Road Project(CRP)numbers. Contact Josh Metcalf Phone: 2762 Department: Public Works Action Needed: Approve Resolution Description Pursuant to RCW 36.75.050, the Board of County Commissioners shall by resolution, and not otherwise, order the survey, establishment, construction, alteration, or improvement of county roads and bridges; the county road engineer shall prepare all necessary maps,plans,and specifications; therefore, showing the right of way widths, the alignments, gradients, and standards of construction. All county road projects scheduled for design and/or construction in 2019 have been adopted as part of the 2019 Annual Construction Program(ACP)and 2019-2024 Six-Year Transportation Improvement Program(TIP), by Resolution 18-344 on November 19, 2018. The 2019 ACP represents the first year of the 2019-2024 TIP. The signing of the attached resolution will establish official CRP numbers and authorize the preliminary engineering,right of way, and construction improvements for the 2019 Countywide 3R Program and 2019 Misc. Safety and Guardrail projects. The CRP number will follow the project through completion. The format of the resolution to formally establish CRP numbers follows the recommended format of the County Road Administration Board(CRAB). Approvals: User Group Status Fife,Tim Pending Niehuser,Jack Pending Metcalf, Josh j Pending BOCC Pending Budget Pending Additional Copies Tim Fife-PW,Robin Saline-PW,Mike Kroll-PW