Initiating County Road Construction Projects and assigning County Road Project Numbers BEFORE THE BOARD OF COUNTY COMMISSIONERS
OF LEWIS COUNTY, WASHINGTON
IN THE MATTER OF:
Initiating county road construction projects and }
assigning County Road Project (CRP) numbers } RESOLUTION NO. 18- 359
IT IS HEREBY RESOLVED THAT the projects listed below be constructed as shown. These projects
are hereby declared to be public necessity and made a part of the officially adopted annual road program in
accordance with ROW 36.81.130. The county road engineer is hereby ordered and authorized to report and
proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, & 36.80.070)
IT IS HEREBY RESOLVED THAT expenditures from the officially adopted road fund budget and based
on the county road engineer's estimates are hereby made in the amounts and for the purposes shown:
1 2 3 4 5 6 7 8 9
Type of a Cost Estimate Annual
Road Name Road Work `13' 2O (Thousands) Constr CRP
and/or Bridge Log (see code) - a- Prog. No.
Number No. o c No.
M.P. to M.P. 0 o Eng. & RNV Construction
0 Grant Local Grant Local
2019 Countywide 3R n/a - - ABODE X X 65 430 205 3 2187
Program (Title Category)
2019 Countywide Misc. n/a - - ABH X X 50 250 6 2188
Safety& Guardrail
(4)Type of Work Code (5)The construction is to be accomplished by contract in
A. Preliminary Engineering accordance with RCW 36.77.020 et. seq.
B. Right of Way
C. Grading, Draining, Surfacing (6) The construction is to be accomplished by county forces
D. Light Bit. Surf.Treatment in accordance with RCW 36.77.065 and WAC 136-18.
E. A.C. or P.C.C. Pavement
F. Curbs and Gutters
G. Sidewalks
H. Traffic Facilities
I. Bridge Construction
J. Paths&Trails(RCW 47.30)
ADOPTED in regular session this 3rd day of December, 2018.
APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS
Jonathan L.Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON
"I—.
i � / _•.// ...._...a.-4 k■_.I ■
By: ,■epu y -rosecuting Attorney dn. J. Fund, C lir
PO 55 s ) /
o lc_•cOUN ••• / I la"—
ATTEST: �a 4, /6- +RD o�Zs•• Robert C. Jackson, Vice Chair
0
`�
�� SINCE �+�o ce
� + 1.845 Ri z:
Rieva Lester, Clerk of the Lewis C ' i (�i *g Vacant
Board of County Commissioners '. rco s �•
• P o:o�;®• • Page 1 of 1
BOCC AGENDA ITEM SUMMARY
Resolution: BOCC Meeting Date: Dec 03, 2018
Suggested Wording for Agenda Item: Agenda Type: Consent
Initiating county road construction projects and assigning County Road Project(CRP)numbers.
Contact Josh Metcalf Phone: 2762
Department: Public Works
Action Needed: Approve Resolution
Description
Pursuant to RCW 36.75.050, the Board of County Commissioners shall by resolution, and not otherwise, order
the survey, establishment, construction, alteration, or improvement of county roads and bridges; the county road
engineer shall prepare all necessary maps,plans,and specifications; therefore, showing the right of way widths,
the alignments, gradients, and standards of construction.
All county road projects scheduled for design and/or construction in 2019 have been adopted as part of the 2019
Annual Construction Program(ACP)and 2019-2024 Six-Year Transportation Improvement Program(TIP), by
Resolution 18-344 on November 19, 2018. The 2019 ACP represents the first year of the 2019-2024 TIP.
The signing of the attached resolution will establish official CRP numbers and authorize the preliminary
engineering,right of way, and construction improvements for the 2019 Countywide 3R Program and 2019 Misc.
Safety and Guardrail projects. The CRP number will follow the project through completion.
The format of the resolution to formally establish CRP numbers follows the recommended format of the County
Road Administration Board(CRAB).
Approvals:
User Group Status
Fife,Tim Pending
Niehuser,Jack Pending
Metcalf, Josh j Pending
BOCC Pending
Budget Pending
Additional Copies
Tim Fife-PW,Robin Saline-PW,Mike Kroll-PW