NOH for the proposed 2020 ACP Six-Year TIP for the years 2020-2025 BEFORE THE BOARD OF COUNTY COMMISSIONERS LEWIS COUNTY, WASHINGTON IN THE MATTER OF: RESOLUTION NO 19-314 NOTICE OF PUBLIC HEARING FOR THE PROPOSED 2020 ANNUAL CONSTRUCTION PROGRAM (ACP) AND SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (TIP) FOR THE YEARS 2020-2025 WHEREAS, RCW 36 81 121 requires the legislative authority of each county prepare and adopt a TIP that includes proposed road and bridge construction work for the ensuing six calendar years, and WHEREAS, WAC 136-16 requires the legislative authority of each county prepare and adopt an ACP that includes proposed road and bridge construction work for the ensuing calendar year; and WHEREAS, on the 23rd day of October 2019, the 2020-2025 Six-Year TIP and 2020 ACP were submitted to the office of the Board of County Commissioners (BOCC) of Lewis County, Washington, and WHEREAS, the 2020-2025 Six Year TIP and 2020 ACP reports, and all related materials have been reviewed by the BOCC and found appropriate for further proceedings NOW THEREFORE BE IT RESOLVED that the 18th day of November, 2019 at or after the hour of 10 00 AM, in the Commissioners Hearing Room on the 2nd floor of the Historic Courthouse in Chehalis, Washington has been fixed by the BOCC as the time and place for the hearing on the 2020-2025 Six Year TIP and 2020 ACP, when and where all persons may appear and be heard upon these programs, and that the Clerk of the BOCC is hereby instructed to proceed with all necessary notifications, postings and publications DONE IN OPEN SESSION this 4th day of November, 2019 APPROVED AS TO FORM BOARD OF COUNTY COMMISSIONERS Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON Kevin McDowell Robert C Jackson By Kevin McDowell, Robert C Jackson, Chair Deputy Prosecuting Attorney ,•GOVNTY,WgS•• ,7▪4,S,6NgDOF'.9f�. ATTEST. CB 'c°i Gary Stamper VA)' :Gary Stamper, Vice Chair •�'•'9s -coed,co: - • - •�` Edna J . Fund Rieva Lester ••x.94). •• Rieva Lester, Edna J Fund, Commissioner Clerk of the Lewis County Board of County Commissioners ANNUAL CONSTRUCTION PROGRAM FOR 2020 TOTAL$'S AGENCY ACTION- COUNTY» LEWIS (A) TOTAL CONSTRUCTION PROGRAM columns(14)4(15) $11,104,687 DATE RECOMMENDED PROG SUBMITTED (B) PUBLISHED COUNTY FORCES LIMIT(see instructions) $1,278,630 DATE OF ENVIRONMENTAL ASSESSMENT (C)TOTAL COUNTY FORCES CONST PROGRAM-column(15) $840,000 DRAFT DATE OF FINAL ADOPTION ORDINANCE/RESOLUTION NO " Line (C) must be smaller than Line (B) ** DATE OF AMENDMENT )1 (2) I (3) I (4) I (5) I (6)I (7) 1 (8) (9) I (10) T (11) (12) I (13) I (14) I (15) I (16) ESTIMATED EXPENDITURES- 1- la SOURCES OF FUNDS* v= a 1-~ DOLLARS(shown is an example) i cc Ls 0 ROAD/PROJECT NAME w z z w 2 z ROAD AND LOCATION a w O N 'W I L'97 COUNTY OTHER FUNDS PRELIM.& RIGHT CONSTRUCTION a w LOG E- i v 3 y 0 w FUNDS CONST OF GRAND i O lz NO (Include brief termini description 'LL I a F j AMOUNT PROGRAM ENGRING WAY COUNTY TOTAL n: or MP's,Bridge#) (Miles) w a $1 234.567 $1,234,567 SOURCE 595 10 595.20 CONTRACT FORCES ALL 595 1 $1,234,567 $1 234,567 $1234.567 $1 234,567 Non-Capital Improvement Projects I 1 1 - Countywide Bridge/Road Bank Protection (Various Roads) - 1 - FA,Other 100,000! 25,000 75,000 100,0( 2 1 30100 Pleasant Valley Road Bridge Scour(MP 2.46) - • 08 FA,Other 309,940 STP(BR) 309,940 309,92 3 1 64000 'Stowell Road Bridge Scour(MP 0.57) - 09 FA,Other I 375,460 STP(BR) 375,460 375,4E 4 2 1 I Countywide Culvert Replacement(Various Roads) - - DR 1 10,000 10,000 10,0( 5' 2 22850 Cousins Road Culvert Replacement(MP3 15) • - 09 DR 750,000 750,000 750,0( 6 2 1 91025 IGraf Road Culvert Replacement(MP 1 01) - 18 DR 1 11,350 835,980 WCRI,FBRB I 847,330 847,3: 7 2 95000 Jackson Hwy S Culvert Replacement(MP 2.09) - 07 DR • 785,000 440 000 RAP 20 000 5,000 1,200,000 1,225,0( 8 2 1 38329 ,King Road Culvert Replacement(MP 5.38) - 08 DR 387 579 371 378!, FBRB 758,957 758,9E 9 3 - Federal Forest Road Improvements ' - - 3R Other 100,000' 1 5,000 95,000 100,0( D Capital Improvement Projects 1 4 - 1Countywide 3R Program(Various Roads) - 1 - 3R 836 7351 428,265 CAPP 60 000 5,000 500 000 700,000 1,265,0( 2 5 ' - Countywide Paths&Trails - - P&T 25,000 P&T 5,000' 5,000 5,000 10,000 25,0( 3 5 62851 Swofford Pedestrian Improvements(Green Mt.Road MP 0 000-1 500) 1 50 09 P&T 115,000 I P&T 10,000 10 000 30 000 65 000 115,0( 4 6 - Countywide Emergent Construction Projects(Various Roads) - - RC 3R 70 000, 10,000 10,000 35,000 15 000 70,0( 5 7 - Countywide Misc Safety&Guardrail(Various Roads) - - Safety 300 000 45,000 5,000 200 000 50 000 300,0( 61 8 91023 Borst Avenue Safety Improvements(MP 0 000-0.298) 0.30 17 RC SW 4 750 45,250 TIB Other 50,000 50 0( 7 9 76851 Silverbrook Road Improvements(MP 1 236-1 474) 0.24 09 NA,RC 1,750' 8,250 FEMA/DEM 10,000 10,0( 8 10 - Highway Safety Improvement Program(Various Roads) - - Safety 10,000 HSIP 10,000 10,0( 9' 11 1 46000 North Fork Road Realignment(MP 2 70-4.05) 1 35 1 08 NA,RC • 1,0001 9,000 RAP 10,000 10,0( D 12 65605 Townsend Bridge No 223 Replacement 0.22 BR 1 215,0551 1,377,9451 STP(BR) 100,000 5,000 1,488,000 1,593,0( 1 1 13 - Mickelsen Parkway(MP 0.00-0 70) 0 70 - NA 3,335,000 WSDOT,Other 10,000 3,325,000 3,335,0( 2 14 - 12019 County Safety Program - - Safety 15,000 325,000 HSIP 150,000 190 000 340,0( 3 15 94001 ,Centralia Alpha Road Improvements(MP 10.60-11 85) 1 25 07 NA,RC 23,500' 176,500 RAP,STP(R) 150,000 50,000 200,06 4 16 91000 i Harrison Avenue Improvements(MP 0.55-2.54) 1 99 16 1 RC 33 750 216,250' STP(U) 250,000 250 0( 5 17 17912 Wigley Road Improvements(MP 0 720-1 033) 0.31 ' 09 3R 10 0001 Other 5,000 5,000 10 0( 6 18 62850 Swofford Road Rehabilitation(MP 0 000-1 777) 1 78 08 NA,RC 1, 15,000 10,000 5,000 15,0( 7 19 94006 Rush Road Improvements(MP 2.600-3 164) 0.56 16 I 3R 1 5,000 I Other 5,000 5,0( 8 20 61451 Boyd Road Rehabilitation(MP 0.00-1 14) 1 14 09 3R 10,0001 10,000 10,0( 9!' 21 61450 I Isbell Road Rehabilitation(MP 0.000-1 41) 1 41 09 3R 10,0001 10,000' 1 O,0( D 22 North County Industrial Access(To Be Determined) NA 5,000 175,000, 09 Funds 180,000' 180,0( PAGE/PROGRAM TOTALS CONSTRUCTION ' 3,840 469 8,439,2181 0_ 1,070,0001 105,000_ 10,264 687_ 840 000_ 12,279 6f Six Year Transportation Improvement Program, 2020 to 2025 Old 2020 2021 2022 2023-2025 Project Priority Priority Project BMP EMP PE ROW Constr PE ROW Constr PE ROW Constr PE ROW Constr Total Non-Capital Improvement Projects 1 1 Countywide Bridge/Road Bank Protection - - $25 $760 $25 $75 $25 $75 $75 $225 $1,285 2 2 Countywide Culvert Replacement - - $130 $5 $3,456 $10 $10 $30 $3 641 3 3 Federal Forest Road Improvements - - $5 $95 $5 $95 $5 $95 $15 $285 $600 Capital Improvement Projects 4 4 Countywide 3R Program - - $60 $5 $1,200 $40 $2 $550 $40 $2 $550 $120 $6 $1,650 $4 225 _ 5 5 Countywide Paths&Trails - - $15 $15 $110 $3 $2 $15 $3 $2 $15 $9 $6 $45 $240 6 6 Countywide Emergent Construction Projects - - $10 $10 $50 $5 $5 $40 $5 $5 $40 $15 $15 $120 $320 7 7 Countywide Misc Safety&Guardrail - - $45 $5 $250 $10 $5 $100 $10 $5 $100 $30 $15 $300 $875 8 8 Borst Avenue Safety Improvements 0 000 0 298 $50 $50 9 9 Silverbrook Road Improvements 1 236 1 474 $10 $10 10 10 Highway Safety Improvement Program - - $10 $10 11 11 North Fork Road Realignment 2 700 4 050 $10 $10 12 12 Townsend Bridge#223 Replacement 0.220 - $100 $5 $1,488 $1 593 21 13 Mickelsen Parkway 0 000 0 700 $10 $3 325 $3,335 - 14 2019 County Safety Program - - $150 $190 $772 $1,112 18 15 Centralia Alpha Road Improvements 10 600 11 850 $150 $50 $15 $15 $4,500 $4 730 19 16 Harrison Avenue Improvements 0 548 2.544 $250 $250 $250 $250 $1,000 13 17 Wigley Road Improvements 0 720 1 033 $5 $5 $5 $300 $315 14 18 Swofford Road Rehabilitation 0 000 1 777 $10 $5 $10 $750 $775 15 19 Rush Road Improvements 2.600 3 164 $5 $75 $100 $50 $50 $2,000 $2,280 16 20 Boyd Road Rehabilitation 0 000 1 140 $10 $10 $60 $50 $350 $480 17 21 Isbell Road Rehabilitation 0 000 1 410 $10 $10 $30 $35 $350 $435 20 22 North County Industrial Access - - $180 $5 $5 $15 $10,000 $10,205 22 23 Avery Road West Improvements 0 090 2 700 $180 $20 $10 $5 $500 $715 23 24 Tucker Road Widening 0 000 5 549 $100 $100 $185 $185 $2,280 $2,850 24 25 Avery Road West/North Military Road Intersection 0.430 0.470 $20 $50 $70 25 26 Teatzel Road Bndge Approach Repair 0 700 0 990 $30 $170 $200 26 27 Gallagher Road Extension 0.000 0 970 $100 $30 $970 $1,100 27 28 Downie Road Extension 0 000 - $100 $20 $1,080 $1,200 28 29 Highway 603(4)Rehabilitation 10 900 11 700 $120 $40 $951 $1 111 29 30 SR 505 Corridor Improvements 2 180 5.500 $1,022 $75 $1,791 $2,888 $0 Misc Engineering,ROW,&Construction Costs $1,170 $105 $11,004_ $478 $129 $6,447_ $773 $269 $4,325 $2,146 $397 $20,417' $47,660 Construction TOTAL $12,279_ $7,054 $5,367 $22,960 $47,660 Annual Balance ($12,279) ($7,054) ($5,367) ($22,960) $47,660 County Forces Construction Limit $1,279 $1,279 $1,279 $3,834 Page 1 Six Year Transportation Improvement Program, 2020 to 2025 Lewis Co Funds Funding Sources 86.5% 80% 86.5% 82.5% 75%of 100% 90% Old Matching 13 5% 20% 13.5% 17 5% Project 10% Other Other Total Priority Priority Project BMP EMP Local Funds STP STP(BR) ER FEMA TIA CAPP RAP Fed/State Local Funding Non-Capital Improvement Projects 1 1 Countywide Bridge/Road Bank Protection - - $600 $685 $1,285 2 2 Countywide Culvert Replacement - - $1,945 $49 $440 $1,207 $3,641 3 3 Federal Forest Road Improvements - - $600 $600 Capital Improvement Projects 4 4 Countywide 3R Program - - $1,655 $2,570 $4,225 5 5 Countywide Paths&Trails - $240 $240 6 6 Countywide Emergent Construction Projects - - $320 $320 7 7 Countywide Misc Safety&Guardrail - - $875 $875 8 8 Borst Avenue Safety Improvements 0 000 0 298 $0 $4 $38 $8 $50 9 9 Silverbrook Road Improvements 1 236 1 474 $0 $2 $7 $1 $10 10 10 Highway Safety Improvement Program - - $0 $10 $10 11 11 North Fork Road Realignment 2 700 4 050 $0 $1 $9 $10 12 12 Townsend Bridge#223 Replacement 0 220 - $0 $215 $1 378 $1,593 21 13 Mickelsen Parkway 0 000 0 700 $0 $1,875 $1,460 $3,335 - 14 2019 County Safety Program - - $0 $15 $1,097 $1 112 18 15 Centralia Alpha Road Improvements 10 600 11 850 $494 $436 $1,600 $2,200 $4,730 19 16 Harrison Avenue Improvements 0.548 2.544 $0 $135 $865 $1,000 13 17 Wigley Road Improvements 0 720 1 033 $0 $315 $315 14 18 Swofford Road Rehabilitation 0 000 1 777 $775 $775 15 19 Rush Road Improvements 2 600 3 164 $0 $2,280 $2,280 16 20 Boyd Road Rehabilitation 0 000 1 140 $10 $470 $480 17 21 Isbell Road Rehabilitation 0.000 1 410 $10 $425 $435 20 22 North County Industrial Access - - $30 $10 175 $10 205 22 23 Avery Road West Improvements 0 090 2 700 $0 $97 $618 $715 23 24 Tucker Road Widening 0 000 5.549 $0 $285 $2,565 $2,850 24 25 Avery Road West/North Military Road Intersection 0 430 0 470 $50 $20 $70 25 26 Teitzel Road Bridge Approach Repair 0 700 0 990 $200 $200 26 27 Gallagher Road Extension 0.000 0 970 $0 $1,100 $1,100 27 28 Downie Road Extension 0 000 - $0 $1 200 $1 200 28 29 Highway 603(4)Rehabilitation 10 900 11 700 $0 $111 $1 000 $1,111 29 30 SR 505 Corridor Improvements 2 180 5.500 $0 $722 $1,444 $722 $2,888 $0 $0 Misc Engineering ROW &Construction Costs $7,804 I, $2,072 $4,190 I $2,063 I $0 I $7 I $38 I $2,570 I $6,214 I $17,002 I $5,700 I $47,660, Construction TOTAL Lewis Co Funds $47,660 Annual Balance Total- $9,876 County Forces Construction Limit Page 2 iTi Deportment of onstat •t Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO. SWW RTPO N Inside Y Outside m 3 '< -0 0 o a � c -1 = z T - A.PIN/Project No B STIP ID 3 0 3 ~: o— C Project Title D m k m ,7 m ' A c D Road Name or Number a 0. n o n °— a m g a E Begin&End Termini d ' m Z o -i S. 'c 0. a d o F Project Description G Structure ID .2 a 3.. P °m a s m a 00 1 WA-02926 14 C P S T W CE No Countywide Bridge/Road Bank Protection Various Roads to Countywide bank protection on various roads and bridges Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 150 000 150,000 S CN 2020 0 0 450,000 450,000 Totals 0 0 600,000 600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 25,000 25,000 25,000 25,000 50,000 CN 75,000 75,000 75,000 75,000 150,000 Totals 100,000 100,000 100,000 100,000 200,000 Report Date October 21,2019 Page 1 Washington Coate Six Year Transportation Improvement Program Transportation From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 < 17 9 a a O c A.PIN/Project No B STIP ID 3 a 3 0 3 f C Project Title D m a n a A n_. c D.Road Name or Number , a a o R. n °= a m g . E Begin&End Termini ' a '< 0 ,< c• a ? gI F Project Description G Structure ID co a a P .$ a g W a 08 1 /2021(054) WA-10886 47 DCE No Pleasant Valley MP 2.46 Bridge Scour 30100-Pleasant Valley Rd 2 46 to N/A Scour Repair-scour has undermined approach and is within footing limits This 08437600 project is to armor the abutment and spread footings Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 STP(BR) 309 940 0 0 309,940 Totals 309,940 0 0 309,940 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 309 940 0 0 0 0 Totals 309,940 0 0 0 0 Report Date October 21,2019 Page 2 To�o�',I is �t Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m_ 3 S a S. z o O a 3 c -1 = A c A.PIN/Project No B STIP ID 3 0 3 - o m C Project Title D e ti a j w A n c D Road Name or Number a n a o F. n °-' a d $ E Begin&End Termini v° m 0 $ gi. CI d F.Project Description G Structure ID ca Er, 3 o o N St o a 09 1 /2021(055) WA-10887 47 DCE No Stowell MP 0.57 Bridge Scour 64000-Stowell Rd 0.57 to N/A Scour Repair-scour has undermined approach and spread footings This project is 08137600 to armor the abutment and spread footings Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 STP(BR) 375,460 0 0 375,460 Totals 375,460 0 0 375,460 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 375 460 0 0 0 0 Totals 375,460 0 0 0 0 Report Date October 21,2019 Page 3 Alai •T/ «�os � Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 � 9 _ A 'o o' -n A.PIN/Project No B STIP ID 3 3 0 3 c C Project Title D m m . d A n c D.Road Name or Number d c n 0 - n m at a m 2 3 E Begin&End Termini z 0 o c 0. a s m F Project Description G Structure ID a w o 'g a o. a a 00 2 WA-04989 44 C P T Yes Countywide Culvert Replacement Various Roads to Remove and replace barrier culverts,provide stream enhancements for fish passage and replacement of maintenance culverts Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 60 000 60,000 Totals 0 0 60,000 60,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10 000 10 000 10,000 10,000 20,000 Totals 10,000 10,000 10,000 10,000 20,000 Report Date October 21,2019 Page 4 T � st Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co. County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< v v o O ' < c i 3 m T A.PIN/Project No B STIP ID 3 0 3 t 3 c C Project Title y m a a . 0 73 ^. c D Road Name or Number m ° a o - n °— a d- 3 E Begin& Termini d °0 3 o 1 c•c 9 m z `� o I a d o F Project Description G Structure ID m a ,3 P a a a a 09 2 WA-12553 44 C P T 0.040 CE Yes Countywide Culvert Replacement-Cousins(MP 3 15) 22850-Cousins Rd 313to317 Title Category-County Culvert Replacement Replacement of maintenance culvert and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 0 0 750,000 750,000 Totals 0 0 750,000 750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 750 000 0 0 0 0 Totals 750,000 0 0 0 0 Report Date October 21,2019 Page 5 T tcfTtans:portstion Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 o 0 c A.PIN/Project No B STIP ID T. 0 < .°� m c C Project Title D a c 1 A c D Road Name or Number a o. o, o r1 °_ a m c E Begin&End Termini v° Z oa ...c E. m a $ F Project Description G Structure ID ,o a .' 0 a °m a 17 2 WA-12555 44 C P T 0.040 CE Yes Countywide Culvert Replacement-Graf Rd(1 01) 91025-Graf Rd 0.99 to 1.03 Title Category Countywide Culvert Replacement Replacement of maintenance culvert and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 0 OTHER 835,980 11,350 847 330 Totals 0 835,980 11,350 847,330 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 847 330 0 0 0 0 Totals 847,330 0 0 0 0 Report Date.October 21,2019 Page 6 TDeportmentSot atio., Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< � c I.o m 3 w - = z A.PIN/Project No B.STIP ID 3 o 3 o �_ C C.Project Title D e e °- p 0 c D Road Name or Number W o 'a o' ' n r m a m g g E Begin&End Termini �° _ a c a m F.Project Description G Structure ID ,n c a 0 0 a °m n 07 2 WA-06384 44 C P T 0.040 Yes Countywide Culvert Replacement-Jackson Hwy S(MP 2 11) 95000-Jackson Hwy S 2.09 to 2 13 Title Category Countywide Culvert Replacement Replacement of maintenance culvert and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 20 000 20,000 S RW 2020 0 0 5,000 5,000 S CN 2020 0 CRAB 440,000 760,000 1200,000 Totals 0 440,000 785,000 1,225,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 20,000 0 0 0 0 RW 5,000 0 0 0 0 CN 1,200,000 0 0 0 0 Totals 1,225,000 0 0 0 0 Report Date October 21,2019 Page 7 nsportation Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< v - o A 0 0 -n A.PIN/Project No B STIP ID 3 c a 0 3 0 C Project Title D a c 3 ,, d a A ,0, c D Road Name or Number 0 a n o R. n m --' a n . E Begin&End Termini v° o Z oa ro 5. g.sv an d F Project Description G Structure ID a w o m g CO a 08 2 WA-12554 44 CPT 0.040 CE Yes Countywide Culvert Replacement-King Rd(MP 5.38) 38329-King Rd 5.36 to 5.40 Title Category-Countywide Culvert Replacement Replacement of maintenance culvert and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 0 OTHER 371 378 387 579 758,957 Totals 0 371,378 387,579 758,957 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 758,957 0 0 0 0 Totals 758,957 0 0 0 0 Report Date October 21,2019 Page 8 TDepartment om' l Six Year Transportation Improvement Program From 2020 to 2025 Agency' Lewis Co County Lewis MPOIRTPO SWW RTPO N Inside Y Outside m 3 '< v 0 O W < ^ -1 . A •n A.PIN/Project No B STIP ID 3 0 3 -• o a C Project Title D a a g ° z xi a c D.Road Name or Number c o. a o• r m a m o g E Begin&End Termini ' v° 3 z `< a m " c a d F Project Description G.Structure ID ,o o, F. o a a g a a• 00 3 WA-02927 05 P T CE No Federal Forest Road Improvements USFS Roads to Maintenance improvements to access Federal Forest lands Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 30 000 30 000 S CN 2020 0 0 570 000 570,000 Totals 0 0 600,000 600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 5,000 5,000 5,000 10,000 CN 95,000 95,000 95,000 95,000 190 000 Totals 100,000 100,000 100,000 100,000 200,000 Report Date October 21,2019 Page 9 T Washington Sta O Six Year Transportation Improvement Program From 2020 to 2025 Agency' Lewis Co County Lewis MPO/RTPO. SWW RTPO N Inside Y Outside m v 1 3 < - a o' -n A.PIN/Project No B STIP ID 3 0 3 o o c C Project Title D a c a n a A n e c D.Road Name or Number c 'o r a n a - a d g cr E Begin&End Termini v a Z ,C a m ,< c w d F Project Description G Structure ID n ' o a a st a 0 00 4 WA-02726 06 P T W CE Yes Countywide 3R Program Various Roads to Countywide preservation activities including CTB,thin lifts of HMA BST pavement markers,and shoulder rock on various roads Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 260,000 260,000 S RW 2020 0 0 15,000 15,000 S CN 2020 0 CRAB 2,569,590 1,380,410 3,950 000 Totals 0 r 2,569,590 1,655,410 4,225,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 60,000 40,000 40,000 40 000 80 000 RW 5,000 2,000 2,000 2,000 4 000 CN 1,200,000 550 000 550 000 550,000 1,100,000 Totals 1,265,000 592,000 592,000 592,000 1 184,000 Report Date October 21,2019 Page 10 1 T Washington tate Six Year Transportation Improvement Program Transportation From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 v 0 A 0 a 0 < c o x, -n A.PIN/Project No B STIP ID 3 3 -• 0 C Project Title D a e . p ' A Z D.Road Name or Number c ° n o n r °— a a m g g E.Begin&End Termini 3 Z $ e c• a d F Project Description G.Structure ID ,o n » ? H 5 'm a 00 5 WA-10775 28 P T CE Yes Countywide Paths&Trails Various Locations to Construction and preservation of paths&trails at various locations Funding Status Phase ' Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 20 000 20 000 S RW 2020 0 0 15,000 15,000 S CN 2020 0 0 90,000 90,000 Totals 0 0 125,000 125,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 3 000 3,000 3 000 3,000 6 000 RW 2,000 2,000 2,000 2,000 4,000 CN 15,000 15,000 15,000 15,000 30,000 Totals 20,000 20,000 20,000 20,000 40,000 Report Date October 21,2019 Page 11 Washington�of�TM,�,st Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside - m 3 < c pa 3 'o D m `m '� 3 A m A.PIN/Project No. B.STIP ID 3 0 3 _. o e C Project Title D a a g ° z A ,n. c D Road Name or Number m o. a o � ct E a 0_. d c E Begin&End Termini m vo 3 ' o a —I E. m m F Project Description G Structure ID c 0�, o a a 5 a c 00 5 WA-10776 28 P T W CE Yes Countywide Paths&Trails-Swofford Pedestrian Improvements Swofford Rd&Green Mt Rd to 1 Construction of bike and pedestrian facilities Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 10,000 10,000 S RW 2020 0 0 10,000 10,000 S CN 2020 0 0 95,000 95,000 Totals 0 0 115,000 115,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 0 0 0 0 RW 10 000 0 0 0 0 CN 95,000 0 0 0 0 Totals 115,000 0 0 0 0 Report Date October 21,2019 Page 12 I, Washington �� � Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m A 3 < a O c ` o 5 a ,� A.PINIProject No B.STIP ID 3 0 3 -• c C.Project Title D m m i m ' A P. c D Road Name or Number c a a o' a. r1 m n a a ac E.Begin&End Termini �, m Z v o w d F.Project Description G Structure ID ,o 0.a w o a w s 0 a• 00 6 WA-10777 06 P T W Yes Countywide Emergent Construction Projects Various Roads to Design and construction of emergent construction projects and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 35,000 35,000 S RW 2020 0 0 35,000 35,000 S CN 2020 0 0 250,000 250 000 Totals 0 0 320,000 320,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 5,000 5,000 5,000 10,000 RW 10,000 5,000 5,000 5,000 10,000 CN 50,000 40 000 40,000 40 000 80,000 Totals 70,000 50,000 50,000 50,000 100,000 Report Date October 21,2019 Page 13 Arne WaWd Transportation ngt nState Six Year Ttati Improvement Program Department ot,rtantl>>ort,eion From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 < z 'o c -n ' A.PIN/Project No. B STIP ID D a m .°�. 3 C Project Title D m ,cam a ,' S a A o Z D.Road Name or Number m o. a. o a n IT m 2 Fm a E Begin&End Termini d vo m = a c ? F Project Description G Structure ID al a P e a a a. 00 7 WA-02925 21 P T W CE Yes Countywide Misc Safety&Guardrail Various Roads to Perform various safety projects as needed and install guardrail at necessary locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 95,000 95,000 S RW 2020 0 0 30,000 30,000 S CN 2020 0 0 750 000 750,000 Totals 0 0 875,000 875,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 45,000 10,000 10 000 10 000 20,000 RW 5,000 5,000 5,000 5,000 10 000 CN 250,000 100 000 100,000 100,000 200,000 Totals 300,000 115,000 115,000 115,000 230,000 Report Date October 21,2019 Page 14 Arnie VW Department Washington ter, Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co. County Lewis MPO/RTPO SWW RTPO N Inside Y Outside - m 3 '< I - A c 3 .n A PIN/Project No B STIP ID 3 0 < o C Project Title y m 0 ,77 n a z ^. c D.Road Name or Number a a a o' F. o o °—' 2 n 3 E Begin&End Termini t 3 ' ' °o E a m o F Project Description G.Structure ID o o a o a a 17 8: CRP-2139 03 C G P S T 0.300 CE Yes w 'Borst Avenue Safety Improvements 91023-Borst Ave 0.000 to 0.298 Closeout Costs-Safety improvements including a sidewalk,a parking strip road reconstruction and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 0 TIB 37,500 12,500 50,000 Totals 0 37,500 12,500 50,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 50,000 0 0 0 0 Totals 50,000 0 0 0 0 Report Date October 21,2019 Page 15 AIL Washington rotate Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m xi 3 '< v a c -n o A.PIN/Project No. B STIP ID D c : 0 3 ZC.Project Title y m c m d a c1 c D Road Name or Number a c a o' 0 m m a r g c E Begin&End Termini d v 0 . E m m Z , o. a,a F. ct Descriptio Structure ID in o, » o ig H g . 09 9 WA-10779 03 P T W 0.240 CE Yes Silverbrook Road Improvements 76851-Silverbrook Rd 1 236 to 1 474 Closeout Costs-Realign and construct a portion of Silverbrook Road to remain above flood waters during high water events,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 FEMA 7 000 OTHER 1,250 1 750 10,000 Totals 7,000 1,250 1,750 10,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 10,000 0 0 0 0 Totals 10,000 0 0 0 0 Report Date October 21,2019 Page 16 T Washington State Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside . - - m 3 '< v - c a o -n A PIN/Project No e - _ 7 A B STIP ID 3 0 3 o a C Project Title D e i e °- a c D.Road Name or Number o a. a o a r) r °—' a e n E Begin&End Termini o m Z o .< S.tg.w m F Project Description G.Structure ID a P 'S m s °e a 00 10 /000S(479) WA-10819 21 C P T W CE Yes Highway Safety Improvement Program-Phase II Various Roads Countywide to Countywide Closeout Costs-Upgrade signs,improve clear zone(flatten slopes,add/upgrade barriers,widen shoulders,remove/modify fixed objects and reduce pavement edge drop-offs) Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 HSIP 10 000 0 0 10,000 Totals 10,000 0 0 10,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 10 000 0 0 0 0 Totals 10,000 0 0 0 0 Report Date October 21,2019 Page 17 TI a��,r;�>< � Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m '< 17 9 O a O -n o A.PIN/Project No. B STIP ID D c 3 c o 3 a Z C Project Title D 2 c m m n c D Road Name or Number Ti c a o n m L a m g c E Begin&End Termini v 3 °° c an d F Project Description G Structure ID m' ea a 0 'S H 3 m n R. 08 11 CRP-2158 03 CPT 1 350 CE Yes North Fork Road Realignment 46000-North Fork Rd 2 700 to 4 050 Improve by grading HMA horizontal and vertical alignments will be improved,and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 0 CRAB 9,000 1,000 10 000 Totals 0 9,000 1,000 10,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 10 000 0 0 0 0 Totals 10,000 0 0 0 0 Report Date October 21,2019 Page 18 portation Six Year Transportation Improvement Program of 7:im From 2020 to 2025 Agency Lewis Co County Lewis MPOIRTPO SWW RTPO N Inside Y Outside - — - m i 3 ' EA T A PINIProject No B STIP ID 3 0 3 m c Z C Project Title = y a 22 °_ t7^ c D.Road Name or Number a 0. o. t7 a c iu 0 3 E Begin&End Termini v 3 = °o m .7 a n 1 F Project Description G Structure ID m a '. ° a m 7 a n 09 12 /2021(056) WA-10885 10 0.010 DCE No Townsend Bridge#223 Replacement 65605-Townsend Rd 0.22 to N/A 1 Bridge replacement. 08294200 Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 STP(BR) 86,500 0 13,500 100 000 S RW 2020 STP(BR) 4,325 0 675 5,000 S CN 2020 STP(BR) 1,287 120 0 200,880 1,488,000 Totals 1,377,945 0 215,055 1,593,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 100,000 0 0 0 0 RW 5,000 0 0 0 0 CN 1,488,000 0 0 0 0 Totals, 1,593,000 0 0 0 0 Report Date October 21,2019 Page 19 VI Department ot on State Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< --,13 v - o' o z xi -n o A.PIN/Project No B STIP ID D c .°�. 3 C Project Title D m c m ,? d m 73 n Q-. c D.Road Name or Number o c 'a o' a n m m a m c E Begin&End Termini "c/ m Z ' ° E. an d m F Project Description G Structure ID oo $ P '$ g St • a. 00 13 CRP-2121 01 C G P S T 0 700 CE Yes W Mickelsen Parkway Mickelsen Parkway 0 000 to 0 700 Construct new road for industnal access and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 10,000 10,000 P CN 2020 0 OTHER 750,000 2,575,000 3,325,000 Totals 0 750,000 2,585,000 3,335,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 0 0 0 0 CN 3,325,000 0 0 0 0 Totals 3,335,000 0 0 0 0 Report Date October 21,2019 Page 20 TDepartment of`'Tfan•P +tiw� Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO• SWW RTPO N Inside Y Outside m 3 0 ° o A z o m o A.PIN/Project No B STIP ID D o 1° ^• c `� 3 z C Project Title = D e a °_ 0 W c D.Road Name or Number a 0. a o c1 r a DT E.Begin&End Termini c° m Z 'e °a e E to an d F Project Description G.Structure ID o o. F. P o a o a 00 14 WA-12551 21 C P T W No 2019 County Safety Program Phase I Various Roads Countywide to Countywide Installation of flexible guideposts Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 HSIP 13,500 0 1 500 15,000 S CN 2020 HSIP 190 000 0 0 190,000 Totals 203,500 0 1,500 205,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 15,000 0 0 0 0 CN 190,000 0 0 0 0 Totals 205,000 0 0 0 0 Report Date October 21,2019 Page 21 ii, °� , tst�«► Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside RI 3 '< A 2 o T A.PIN/Project No B STIP ID D o < 0 3 c C Project Title D a a g 0 o z c D.Road Name or Number m o. n o' a c1 r °—' a m° c E Begin&End Termini v 33 Z o a c R. a 01 m F Project Description G Structure ID 0 as P a a g a o. 00 14 WA-12552 21 C P T W CE Yes 2019 County Safety Program-Phase II Various Roads Countywide to Countywide Upgrade signs,improve clear zone,flatten slopes add/upgrade barriers widen shoulders remove/modify fixed objects and reduce pavement edge drop-offs Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 HSIP 121 500 0 13.500 135,000 S CN 2020 HSIP 772,500 0 0 772,500 Totals 894,000 0 13,500 907,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 135,000 0 0 0 0 CN 0 772,500 0 0 0 Totals 135,000 772,500 0 0 0 Report Date October 21,2019 Page 22 .�o Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside T 3 '< s - a o A.PIN/Project No B STIP ID 3 o 3 . c 3—c C Project Title D a w a g Si A a c D.Road Name or Number a o a o' a n r m a mo' 3 E Begin&End Termini m ' 3 a •_ oa z .e a c a z o m m 0 F Project Description G.Structure ID to c. F. . e w 5 m a. 07 15 1 N210(008) WA-06389 03 C P T W 1 250 CE Yes Centralia Alpha Road Improvements 94001-Centralia Alpha Rd 10.600 to 11 85 Slope stabilization,intersection improvements,roadway widening,resurfacing with hot mix asphalt,guardrail,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 STP(R) 71 362 CRAB 74,250 19,388 165,000 S RW 2020 0 0 65,000 65,000 S CN 2021 STP(R) 1,528,638 CRAB 2,125,750 845,612 4,500,000 Totals 1,600,000 2,200,000 930,000 4,730,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 150,000 15,000 0 0 0 RW 50,000 15,000 0 0 0 CN 0 4,500,000 0 0 0 Totals 200,000 4,530,000 0 0 0 Report Date'October 21,2019 Page 23 TonSta,r».,s ��o„ Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m T '< -43 xi v - a c m a A.PIN/Project No. B STIP ID D o O 0 3 c C.Project Title D m a ,g ° 0 a n-. c D Road Name or Number o a o. o a n r m a n 3 E.Begin&End Termini v m Z ° m m $ F.Project Description G Structure ID ro a . a a a a 16 16 CRP-2132 03 CO P S T 2.000 CE Yes W Harrison Avenue Improvements 91000-Harrison Ave 0.548 to 2.544 Roadway design for future development. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 STP(US) 865,000 0 135,000 1,000,000 Totals 865,000 0 135,000 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 250,000 250,000 250,000 250 000 0 Totals 250,000 250,000 250,000 250,000 0 Report Date October 21,2019 Page 24 «��o Six Year Transportation Improvement Program From 2020 to 2025 nsportation Agency Lewis Co. County Lewis MPO/RTPO SWW RTPO N Inside Y Outside - m 3 3 9 O I. a < c _, . A -n A.PIN/Project No B STIP ID 3 0 3 = o c C Project Title D m m g °_ ' A n^ 3 c D Road Name or Number a o a o r1 o ti �, n 3 E Begin&End Termini v 3 3 0 E. m F Project Description G.Structure ID ,o c. a . a e ;: a 0. 09 17 CRP-2155 03 C P T 0.310 CE Yes Wigley Road Improvements 17912-Wigley Rd 0 720 to 1 033 Improve by grading,preleveling with HMA,horizontal and vertical alignments will be improved,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 10,000 10 000 S RW 2020 0 0 5 000 5,000 S CN 2021 0 0 300,000 300,000 Totals 0 0 315,000 315,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 5,000 0 0 0 RW 5,000 0 0 0 0 CN 0 300,000 0 0 0 ■ Totals 10,000' 305,000 0 0 0 Report Date'October 21,2019 Page 25 Ilk T Washington State Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County' Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< v -0 5. xr c 'o c A.PIN/Project No. B.STIP ID X. c 3 s o Z C Project Title D m c m d 7 33 n 0 c D.Road Name or Number a a n o t7 m a' m iu c E Begin&End Termini o m Z a c ,� Jr, m L. o F Project Description G Structure ID 2 a a o .g H St m a 08 18 CRP-2137 03 P T 1 780 CE Yes Swofford Road Rehabilitation 62850-Swofford Rd 0 000 to 1 777 Improve by grading,preleveling with asphalt class A,horizontal and vertical alignments will be improved and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 20,000 20 000 S RW 2020 0 0 5,000 5,000 S CN 2022 0 0 750 000 750,000 Totals 0 0 775,000 775,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 10,000 0 0 0 RW 5,000 0 0 0 0 CN 0 0 750,000 0 0 Totals 15,000 10,000 750,000 0 0 Report Date October 21,2019 Page 26 Vilastingten Department Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO• SWW RTPO N Inside Y Outside m 3 -, v - 0 o < - A T A.PIN/Project No B STIP ID 3 0 3 -• o 3 < C Project Title y m S a .`g m A c D Road Name or Number c o. 0. o' a 0 o °= a m N 3 E Begin&End Termini v o Z .� c, .c E• a d F.Project Description G Structure ID m' $ a 0 a a a a. 16 19 CRP-2153 03 C G P S T 0.560 CE Yes W Rush Road Improvements 94006-Rush Rd 2.600 to 3 164 Major widening possible curb and gutter sidewalks base stabilization HMA and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 130,000 130,000 P RW 2021 0 0 150,000 150 000 P CN 2022 0 0 2,000 000 2,000 000 Totals 0 0 2,280,000 2,280,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 75,000 50,000 0 0 RW 0 100,000 50,000 0 0 CN 0 0 2,000 000 0 0 Totals 5,000 175,000 2,100,000 0 0 Report Date October 21,2019 Page 27 «� ,; ,s � Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 <' v v - A C O m xi -n A.PIN/Project No B STIP ID D a 0 3 C Project Title D m c m ,7 d A c1 o c D.Road Name or Number a e c o' R. n m d a ,T 0 2 E Begin&End Termini •(;) 3 ' 0 1 -. w m F Project Description G Structure ID m' a a o a a g a as 09 20 CRP-2151 06 C P T 1 140 CE Yes Boyd Road Rehabilitation 61451-Boyd Rd 0 000 to 1 140 Vertical and horizontal improvements base stabilization BST and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 80,000 80,000 P RW 2022 0 0 50,000 50,000 P CN 2022 0 0 350 000 350,000 Totals 0 0 480,000 480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 10,000 60 000 0 0 RW 0 0 50,000 0 0 CN 0 0 350,000 0 0 Totals 10,000 10,000 460,000 0 0 Report Date October 21,2019 Page 28 WO Department of 717ansportation I Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO. SWW RTPO N Inside Y Outside m 3 '< I v c A 'o e I. N < z c A.PIN/Project No. B STIP ID 3 0 3 -• o a C Project Title D m a ,7 d 3 A c D Road Name or Number o o. n o• 0 m °—' 2 C7 o 3 E.Begin&End Termini d v° 3 a - o a ' E• 9 �a a -< N n Cr F Project Description G Structure ID ,o' a a z .g a S. a a. 09 21 CRP-2152 06 CPT 1 410 CE Yes Isbell Road Rehabilitation 61450-Isbell Rd 0.000 to 1 410 Vertical and horizontal improvements,base stabilization,BST,and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 50 000 50 000 P RW 2022 0 0 35,000 35,000 P CN 2022 0 0 350,000 350,000 Totals 0 0 435,000 435,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10 000 10 000 30 000 0 0 RW 0 0 35,000 0 0 CN 0 0 350,000 0 0 Totals 10,000 10,000 415,000 0 0 Report Date October 21,2019 Page 29 T Department of Transportat Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside ' m 3 a a I. G O a. ' A.PIN/Project No B STIP ID D e • �_ 0 3 c C.Project Title D m m n a A n o c D Road Name or Number c o. o o' 0 m a' a m o E Begin&End Termini : v° 3 a 0 o E.r. w m F.Project Description G Structure ID ,o a .' o N g • a 00 22 WA-07344 15 CE No North County Industrial Access N/A to N/A Finalize regional design efforts for a direct industrial ingress/egress arterial two-lane, two-way truck route from Interstate 5 to North Lewis County industrial properties Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 0 205,000 205,000 P CN 2025 0 OTHER 10,000,000 0 10,000 000 Totals 0 10,000 000 205,000 10,205,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 180 000 5,000 5,000 5,000 10 000 ALL 0 0 0 0 10,000,000 Totals 180,000 5,000 5,000 5,000 10,010,000 Report Date October 21,2019 Page 30 VI; Department of Transportation Washington State Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside T 3 '< v A v a. a c m A.PIN/Project No B STIP ID 3 0 3 o W Z C Project Title y a S a ,7 °i o z X -. n E a c D Road Name or Number o P g E Begin&End Termini 3i. Z c . a ° F Project Description G.Structure ID 0 n o a a o o. 07 23 WA-02952 03 C G P T 2.610 CE Yes Avery Road West Improvements 30081-Avery Rd W 0.090 to 2 700 Base stabilization and roadway widening for anticipated industrial commercial traffic, and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 STP(R) 164,000 0 26,000 190,000 P RW 2022 STP(R) 21 000 0 4,000 25,000 P CN 2023 STP(R) 433,000 0 67 000 500 000 Totals 618,000 0 97,000 715,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 180,000 10,000 0 RW 0 0 20 000 5,000 0 CN 0 0 0 500,000 0 Totals 0 0 200,000 515,000 0 Report Date.October 21,2019 Page 31 ANIL T Washington State . r< Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< -7.13. v - z 8 0 m xi -n A.PIN/Project No B STIP ID 3 0 3 c o m c C Project Title D m m ,- n m A ,c. c D.Road Name or Number c o o, o 0 m 91 a w g cr E Begin&End Termini d o m Z ,e o, ,o c m ? F Project Description G Structure ID ,o o. » o a a g m n 07 23 WA-02954 03 C P T 5.550 CE Yes Tucker Road Widening 95003 Tucker Rd 0.000 to 5.549 Road widening,base stabilization,ditches,stormwater ACP and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 CRAB 257 000 28,000 285,000 P RW 2022 0 CRAB 257,000 28,000 285,000 P CN 2023 0 CRAB 2,051,000 229,000 2,280,000 Totals 0 2,565,000 285,000 2,850,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 100,000 185,000 0 RW 0 0 100,000 185,000 0 CN 0 0 0 2,280,000 0 Totals 0 0 200,000 2,650,000 0 Report Date October 21,2019 Page 32 ANIL «t o � Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< v o O 51 A a c -I A c A.PIN/Project No B STIP ID 3 o 3 — o a `L z C Project Title = D a w o f1 c D.Road Name or Number n c a cf d g c E Begin&End Termini v m z `< 0 o CI m F Project Description G Structure ID o a a 0 o a 5 a a 07 25 WA-02955 03 C P T 0.040 CE No Avery Road West/North Military Road Intersection 30081-Avery Rd W&30062-N Military Rd 0.430 to 0.470 Intersection improvements and signalization,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 20,000 20,000 P CN 2024 0 0 50,000 50 000 Totals 0 0 70,000 70,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 20,000 20,000 0 CN 0 0 0 0 50,000 Totals 0 0 20,000 20,000 50,000 Report Date'October 21,2019 Page 33 Washington Six Year Transportation Improvement Program Department Transportation From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< 'o I. C w < C 1 ' A T A.PIN/Project No. B STIP ID D o m o 3 c C Project Title D 3 c o d a X/ „n. c D Road Name or Number a o. ' •R r- d a m o. o' n a d g c E.Begin&End Termini v° 33 = - °. c co an d e, F Project Description G Structure ID co a .' o H g W o 09 26 WA-02993 04 C P T 0.290 CE No Teitzel Road Bridge Approach Repair 17381-Teitzel Rd 0 700 to 0.990 Reconstruct bridge approaches and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 0 30,000 30 000 P CN 2024 0 0 170,000 170,000 Totals 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 01 30 000 CN 0 0 0 0 170,000 Totals 0 0 0 0 200,000 Report Date October 21,2019 Page 34 D �o � Six Year Transportation Improvement Program on From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO• SWW RTPO N Inside Y Outside m 3 a 5. z a a xj T A.PIN/Project No B STIP ID 3 0 • o m C.Project Title y m W ,g 0 a A » a c D Road Name or Number m °• a o n m --' in n g c E Begin&End Termini d '°o o a o 'O c,•a d o F.Project Description G Structure ID m 0. » o m H s m n 19 27 WA-02994 01 C G P S T 0 970 CE Yes W Gallagher Road Extension 11004-Gallagher Rd 0 000 to 0.970 Construct new urban roadway to Harrison Ave. curb gutter sidewalks,illumination, and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 Discretionary 50,000 OTHER 50,000 0 100,000 P RW 2024 Discretionary 15,000 OTHER 15,000 0 30 000 P CN 2024 Discretionary 485,000 OTHER 485,000 0 970,000 Totals 550,000 550,000 0 1,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 100 000 RW 0 0 0 0 30,000 CN 0 0 0 0 970,000 Totals 0 0 0 0 1,100,000 Report Date October 21,2019 Page 35 T «ts � Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m T '< v v - a 'o m A.PIN/Project No B STIP ID 3 0 < 0 3 c C Project Title D a a .--z' n 0 xi c D Road Name or Number m o. a o C1 r °—' a a m 0 c E.Begin&End Termini m Is Z 0 .< c 0.a _' m F Project Description G.Structure ID ,o a a o e a g a a 19 28 WA-02998 01 C G P S T 0 380 CE Yes W Downie Road Extension 40150-Downie Rd 0.000 to Construct new urban road to Maurin Rd.,base stabilization HMA and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 Discretionary 50,000 OTHER 50 000 0 100,000 P RW 2024 Discretionary 10,000 OTHER 10,000 0 20 000 P CN 2024 Discretionary 540,000 OTHER 540,000 0 1,080,000 Totals 600,000 600,000 0 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 100 000 RW 0 0 0 0 20,000 CN 0 0 0 0 1,080,000 Totals 0 0 0 0 1,200,000 Report Date October 21,2019 Page 36 171 Deportment of 11:anspartation Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 -' v v - c o T A.PIN/Project No B STIP ID 3 a 3 ^_ e m z C Project Title = T. 0 w ,g °_ = xp ^. c D.Road Name or Number 0 °. a o' n i a d- 3 E Begin&End Termini v m z `< oa o an . F F Project Description G.Structure ID ca o, o m m - m a 07 29 WA-03004 04 C P T 0.800 CE Yes Highway 603(4)Rehabilitation 93006-Hwy 603 10 900 to 11 700 Improve horizontal alignment,widen and reconstruct roadway base,overlay with HMA,and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 CRAB 108,000 12,000 120,000 P RW 2024 0 0 40 000 40 000 P CN 2025 0 CRAB 892,000 59 000 951,000 Totals 0 1,000,000 111,000 1,111,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 120,000 RW 0 0 0 0 40,000 CN 0 0 0 0 951,000 Totals 0 0 0 0 1,111,000 Report Date October 21,2019 Page 37 T �o , t Six Year Transportation Improvement Program From 2020 to 2025 Agency Lewis Co County Lewis MPO/RTPO SWW RTPO N Inside Y Outside m 3 '< v v -xi o' 0 -n A.PIN/Project No B.STIP ID 3 a 3 0 3 Z C.Project Title = D c o ,„ n a A n n c D Road Name or Number a o a o' 2. n m 01 2 m° c E Begin&End Termini v m Z 0 E m 5 F.Project Description G Structure ID ,o , o m g IC o. 07 30 WA-05043 03 C G P S T 3.320 CE Yes W SR 505 Corridor Improvements SR 505 Mainline 2 180 to 5.500 Corridor improvements including truck climbing lane intersection improvements, traffic signals,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 OTHER 511,000 511,000 1 022 000 P RW 2025 0 OTHER 37 500 37,500 75,000 P CN 2024 0 OTHER 895,500 895,500 1,791,000 Totals 0 1,444,000 1,444,000 2,888,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 225,000 797,000 RW 0 0 0 0 75,000 CN 0 0 0 0 1 791 000 Totals 0 0 0 225,000 2,663,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Lewis Co. 7,410,845 23,373,698 16,876,644 47 661,187 it Report Date October 21,2019 Page 38 NOTICE OF HEARING NOTICE IS HEREBY GIVEN that the Board of County Commissioners, Lewis County, Washington, proposes to adopt the Comprehensive Road and Bridge Construction Program for the six calendar years 2020 through 2025, known as the Six-Year Transportation Improvement Program and the Annual Construction Program for 2020, on Monday, November 18, 2019, on or after 10 00 a m at the Lewis County Courthouse, County Commissioners Hearing Room, 351 NW North Street, Chehalis, Washington, at which time and place any person may appear to be heard, either for or against the adoption of the proposed plan. A draft plan will be available by requesting a copy from Lewis County Public Works at (360) 740-1123 or at our website at http://Iewiscountywa.gov/. ,110 co uty?.k•. • DATED: November 4, 2019 :t SINCE \i �• * 1845 / • •.• :'ist�... Rieva Lester, Clerk of the Lewis County Board of County Commissioners Publish The Chronicle - November 5th and 12th, 2019 Lewis County Web Site: http://lewiscountywa gov/ Lewis County, Washington TRANSPORTATION IMPROVEMENT PROGRAM I L , . " - --‘191k,111:'srisieir■mw 2020 - 2025 , . - ' r --- i Nall Pak ;,:r -Iir ) Wdham • ; r,...t.,. .' ' 1- ' ..,.. ) ' ..i 3rc ( ± --- 1,-,Y.' ,v1; z.,,,I,•-•.:, \-, , , maw.. _ iik- - 71.! "•'''' ' 1 -1"-- ' / ,,f...9,,,,, Man*Eial"4-4- ...,,. ."-4ft......15■•■ . .'55 ''t 1172r **-' „,,, ',:-",::'.:''''' e ,,.s9 -4-"-",,'..--41 ' 4•.,,,T4,„:_ ,..„---, 1 to 7.-., -.... - -,-,.., • r : ,, .- , 1 ...---, ,,,,,,,,„,,, 7-- ,.,. ' 7;2,--,,,-..,` • 0, .-'c '. 4 _ I ' ASAP ,. il'onriAMINF 'to ' ■ — 'ligifitaMillftlirallill ' / 111*- .-- , ',. '' ,A)'('''=T;• A - ' ti`ti. , , • , s ,',,t.Gdford ...4 , • ir„Ss, --14' '' ti.'15inchoterts'`,:s'irk ' ..---Z-......•„,• '''''''zi Goat Rocks :-'4311610111111%.1111111..1111L01111k, ;-..04%41111‘' . , 8 - IlLwallitil,...i. 4.:r •—"N. , _ ...• ' a \ '''‘>'i Wilderness ',"•:.-.'''-, '1 AMIN', ' t,t''.41kb(j '"FilifiN/111,1W4'.— fi ies. :en I II 1 iii I I 13 MilaillirrWIFIlifrj a _-iii , -...:-..:------...1:-.... ...:„...1,,,,,, f-,•;',,./ '.,•,;:- ,',.■ ■....: piM0.-- 1 ::,,,'-'::`,.7,-,,-, -7,(7,,,A.,,,, ii '1• - ii.-7- „ isli3ivalli. . _. "4:__, ,, ,„...„,;_._,, __. ,-, 4 roiltaill . f• -2a 6 „,,t141-V44171- f 0 __- - -- -..._., -). -- ,--' -:&..-t•---..- -,-__-›=-- ''',,,_____,,,, Mount St '' -,'”, • •• R.Z.,8 Ittttt`k•-'s / i' \S••;..•;.r. ' ff•t- Iiir --st r• ,,,,,, „,„.• ihiWPW:i 14lens Notl Al,/ -4:8`.; k•--.-'/,-,1 ‘-7 X. cVolcanic Monument ;I, `,a, '. '-v.„ Year of Construction Year of Construction Road Type Jurisdiction With Priority Labeled With Priority Labeled — 2020 • 2020 — State Route City Limits ....."eft.- 7- ' — 2021 • 2024 — County Road I I Federal Forest Lands " "'• EE — 2022 City Street ---4 /7 ' en October 2019 — 2023 2025 Forest Road — Railroad E.E. ....---... 1 BOCC AGENDA ITEM SUMMARY Resolution: BOCC Meeting Date: Nov 4, 2019 Suggested Wording for Agenda Item: Agenda Type: Legal Notice Notice of Public Hearing for the proposed 2020 Annual Construction Program (ACP) and Six Year Transportation Improvement Program (TIP) for the years 2020-2025 UCf 'z 4 2019 Contact: Josh Metcalf Phone: 2762 Department: PW - Public Works Description: This resolution is to give notice of a public hearing on November 18, 2019 for the adoption of the 2020-2025 Six Year Transportation Improvement Program (TIP) and 2020 Annual Construction Program (ACP). Pursuant to RCW 36 81 121, all counties are required to prepare, adopt, and submit a Six Year TIP for proposed road and bridge construction prior to the County's budget adoption each year. Copies of this program will be furnished to the Washington State Department of Transportation (WSDOT) and County Road Administration Board (CRAB) not more than thirty days after its adoption by the legislative authority. Pursuant to WAC 136-16, all counties are required to prepare, adopt, and submit an ACP for proposed road and bridge construction prior to the County's budget adoption each year. A copy of the adopted annual program and appropriate resolution shall be forwarded to CRAB within thirty days of its adoption but not later than December 31st of each year. A public hearing must be held prior to adoption of the 2020-2025 Six Year TIP and 2020 ACP providing an opportunity for any person to appear and be heard, either for or against the adoption of the proposed program The public hearing will be held November 18, 2019, at the Commissioners Hearing Room on the 2nd floor of the Historic Courthouse in Chehalis, Washington The notice of public hearing will be published in The Chronicle on November 5th and 12th, 2019 The notice of public hearing will also be posted on the Lewis County website. Approvals: Publication Requirements: Publications: User Status Publish in The Chronicle-November 5th and 12th, 2019 PA's Office Approved Additional Copies Tim Fife, Kim Amrine, Robin Saline, Rose Williams AFFIDAVIT OF PUBLICATION STATE OF WASHINGTON COUNTY OF LEWIS 112502 Six Year Plan,TIP Alysa Andrews,and/or Mandy Klemola,and/or Kailyn Sawyer, NOTICE OF HEARING and/or Cindy Thayer says that she is the legal clerk of NOTICE IS HEREBY GIV- EN that the Board of air County Commissioners, QCijrontttc Lewissunto,Washington, proposes to adopt the Comprehensive Road and a semi-weekly newspaper,which has been established,published Bridge Construction Pro- gram for the six calendar in the English language,and circulated continuously as a years 2020 through 2025, semi-weekly newspaper in the City of Centralia,and in Lewis known as the Six-Year County,Washington,general circulation in Lewis County for Transportation Improve- more than six(6)months prior to the date of the first publication ment Program and the Pro- of the notice hereto attached,and that the said Chronicle was on Annual Construction gram for 2020,on Monday, the 7th day of July 1941,approved as a legal newspaper by the November 18, 2019, on or Superior Court of said Lewis County.And that the attached is a after 10:00 a.m. at the true copy and was published in regular issues(and not in Lewis County Courthouse, supplement form)of said newspaper as LEGAL#112502 County Commissioners RE:Six Year Plan,TIP Hearing Room, 351 NW North Street, Chehalis, Washington, at which time once each) \Ctl.Y for a period of 2�'i and place any person may appear to be heard, either commencing on 11/05/2019 and ending on 11/12/2019 for or against the adoption of the proposed plan. A draft plan will be available and both regularly distributed to its subscribers during all of said by requesting a copy from period.That the full amount of the fee charged for the foregoing Lewis County Public Works ubli n is t e sum of$26.04 at(360)740-1123 or at our website at http://lewiscoun tywa.gov/. DATED: Sub orn o before 11/12/2019 November 4,2019 et Rieva Lester,Clerk of the Lewis County Board of County Commissioners Nrestaryidin Public in and for the State of W;;hin�at►I t llllr��iii/' NovePubll ber 5&2h 2019 �'l�t.h��) ��`4Pt 0 20, ,'�� i6�y2 = O:Z.Q pP� a,;Z= •a.m 0" ^:C7= / I,,,�rrfSTA ` �\��` AFFIDAVIT OF PUBLICATION STATE OF WASHINGTON COUNTY OF LEWIS 112502 Six Year Plan,TIP Alysa Andrews,and/or Mandy Klemola,and/or Kailyn Sawyer, NOTICE OF HEARING and/or Cindy Thayer says that she is the legal clerk of NOTICE IS HEREBY GIV- EN that the Board of Pt County Commissioners, !IIjronttte Lewis County,Washington, proposes to adopt the Comprehensive Road and a semi-weekly newspaper,which has been established,published Bridge Construction Pro- in the English language,and circulated continuously as a y for the six Cal2ars 2020 through 2025, years 2025, semi-weekly newspaper in the City of Centralia,and in Lewis known as the Six-Year County,Washington,general circulation in Lewis County for Transportation Improve- more than six(6)months prior to the date of the first publication ment Program and the of the notice hereto attached,and that the said Chronicle was on Annual Construction Pro- gram for 2020,on Monday, the 7th day of July 1941,approved as a legal newspaper by the November 18, 2019, on or Superior Court of said Lewis County.And that the attached is a after 10:00 a.m. at the true copy and was published in regular issues(and not in Lewis County Courthouse, supplement form)of said newspaper as LEGAL#112502 County Commissioners RE:Six Year Plan,TIP Hearing Room, 351 NW North Street, Chehalis, Y. Washington, at which time once each tk:.Q1.1.(fora period of 2 Lk\ �r C [ -21 and place any person may appear to be heard, either commencing on 11/05/2019 and ending on 11/12/2019 for or against the adoption of the proposed plan. A and both regularly distributed to its subscribers duringall of said draftyr plan will be available from � y by requesting a Dopy from period.That the full amount of the fee charged for the foregoing Lewis County Public Works ub'c tion is the sum of$26.04 at(360)740-1123 or at our website at http://lewiscoun tywa.gov/. DATED: S d om to a me 11/12/2019 November 4,2019 , Rieva Lester.Clerk of the Lewis County Board of County Commissioners 4 Notary Public in and for the State of Wash tttMlllfl//////,/' November 5 The 2h orrice re idingat \ ��� 019 dJ Q'•�•aas 5 2023 '.?kT: t _ cr.z3 o� �U ,••5= m I m • v . •• Z_ �