Loading...
Failure to execute contract for Material Purchase Re-Bid of Rock for 2021 3R Program and award to second-lowest bidder BEFORE THE BOARD OF COUNTY COMMISSIONERS LEWIS COUNTY, WASHINGTON IN THE MATTER OF: RESOLUTION NO. 21-103 FAILURE TO EXECUTE CONTRACT FOR THE MATERIAL PURCHASE RE-BID OF ROCK FOR THE 2021 3R PROGRAM AND AWARD TO SECOND LOWEST BIDDER WHEREAS, a call for bids for the 2021 Rock Purchase Rebid project was issued January 21, 2021; and WHEREAS, Public Works received four bids, and the top three were evaluated to determine the most advantageous. The top three bid quotations were submitted as follows: Contractor Name 3/8-No 4 Crushed Crushed surfacing top Screening course (CSTC) Good Crushing, Toledo, $20.00/ton $10.00/ton WA Winston Quarry, No Bid $10.00/ton Mossyrock, WA Alderbrook Quarry $18.00/ton $10.00/ton WHEREAS, Alderbrook Quarry provided the most advantageous bid for 3/8-No 4 Crushed Screening for a total of $575,606.88 and was awarded the contract on February 22, 2021; and WHEREAS, the bidder, Alderbrook Quarry, failed to execute the contract; and WHEREAS, WSDOT 2020 Standard Specification Section 1-03.5 (Failure to Execute Contract) and supplemental language in the Contract Special Provisions state if this (failure to execute the contract) should occur, the Contracting Agency may then award the contract to the second-lowest responsible bidder; and WHEREAS, Good Crushing submitted the second-lowest responsible bid for the 3/8 No 4 Crushed Screening in the amount of $615,292.66. NOW THEREFORE BE IT RESOLVED that the contract for the 2021 Rock Purchase, 3/8 No 4 Crushed Screening, in Lewis County be awarded to Good Crushing in the amount of $615,292.66. Upon presentation of such contract, the County Engineer is authorized to sign on behalf of the Board of County Commissioners. DONE IN OPEN SESSION this 16th day of March, 2021. Page 1 of 2 Res. 21-103 APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON Amber Smith Gary Stamper By: Amber Smith, Gary Stamper, Chair Deputy Prosecuting Attorney ATTEST: •'�°-�"TY��s' Lindsey R. Pollock, DVM ��9 uPRD OF Lftdsey R. Pollock, DVM, Vice Chair •4' C .Q, 8 Rieva Lester '•'s •' Sean D . Swope Rieva Lester, Sean D. Swope, Commissioner Clerk of the Lewis County Board of County Commissioners Page 2 of 2 Res. 21-103 Alderbrook Quarry Area 1 (3/8-No.4 Crushed Screening)Stock Pile - L-291 Good Crushing J- Hanaford Pit 292 Tons of Chiprock 780 961 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck, Pup and Operator per Minute $2.52 $2.52 Travel Minutes 54 60 Load/Unload time 30 30 Cost per Load $211.68 $226.80 Total Loads 28 34 Trucking Cost per Ton $7.56 $8.10 Trucking Cost $5,896.80 $7,784.10 Chiprock Cost $14,040.00 $19,220.00 Tax on Chiprock $1,095.12 $1,499.16 Total Per Ton Chiprock+Haul $26.96 $29.66 Total Cost $21,031.92 $28,503.26 Alderbrook Quarry Area 1 (3/8-No.4 Crushed Screening)Stock Pile - L-291 Good Crushing J- Agate 292 Tons of Chiprock 1,505 1,505 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck, Pup and Operator per Minute $2.52 $2.52 Travel Minutes 48 54 Load/Unload time 30 30 Cost per Load $196.56 $211.68 Total Loads 54 54 Trucking Cost per Ton $7.02 $7.56 Trucking Cost $10,565.10 $11,377.80 Chiprock Cost $27,090.00 $30,100.00 Tax on Chiprock $2,113.02 $2,347.80 Total Per Ton Chiprock+ Haul $26.42 $29.12 Total Cost $39,768.12 $43,825.60 Alderbrook Quarry Area 1 (3/8-No.4 Crushed Screening)Stock Pile - L-291 Good Crushing J- Lincoln Creek 292 Tons of Chiprock 1,592 1,592 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck, Pup and Operator per Minute $2.52 $2.52 Travel Minutes 48 64 Load/Unload time 30 30 Cost per Load $196.56 $236.88 Total Loads 57 57 Trucking Cost per Ton $7.02 $8.46 Trucking Cost $11,175.84 $13,468.32 Chiprock Cost $28,656.00 $31,840.00 Tax on Chiprock $2,235.17 $2,483.52 Total Per Ton Chiprock+ Haul $26.42 $30.02 Total Cost $42,067.01 $47,791.84 Alderbrook Quarry Area 2(3/8-No.4 Crushed Screening)Stock Pile - L_291 Good Crushing J- Bunker 292 Tons of Chiprock 3,508 3,508 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck, Pup and Operator per Minute $2.52 $2.52 Travel Minutes 16 32 Load/Unload time 30 30 Cost per Load $115.92 $156.24 Total Loads 125 125 Trucking Cost per Ton $4.14 $5.58 Trucking Cost $14,523.12 $19,574.64 Chiprock Cost $63,144.00 $70,160.00 Tax on Chiprock $4,925.23 $5,472.48 Total Per Ton Chiprock+ Haul $23.54 $27.14 Total Cost $82,592.35 $95,207.12 Area 3(3/8-No.4 Crushed Screening)Stock Pile - Alderbrook Good Crushing J- Pleasant Valley Quarry L-291 292 Tons of Chiprock 3,799 3,799 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck, Pup and Operator per Minute $2.52 $2.52 Travel Minutes 22 6 Load/Unload time 30 30 Cost per Load $131.04 $90.72 Total Loads 136 136 Trucking Cost per Ton $4.68 $3.24 Trucking Cost $17,779.32 $12,308.76 Chiprock Cost $68,382.00 $75,980.00 Tax on Chiprock $5,333.80 $5,926.44 Total Per Ton Chiprock+ Haul $24.08 $24.80 Total Cost $91,495.12 $94,215.20 Area 3(3/8-No.4 Crushed Screening)Stock Pile -Old Alderbrook Good Crushing J- Vegetation Quarry L-291 292 Tons of Chiprock 953 953 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck, Pup and Operator per Minute $2.52 $2.52 Travel Minutes 34 26 Load/Unload time 30 30 Cost per Load $161.28 $141.12 Total Loads 34 34 Trucking Cost per Ton $5.76 $5.04 Trucking Cost $5,489.28 $4,803.12 Chiprock Cost $17,154.00 $19,060.00 Tax on Chiprock $1,338.01 $1,486.68 Total Per Ton Chiprock+Haul S25.16 $26.60 Total Cost $23,981.29 $25,349.80 Area 5(3/8-No.4 Crushed Screening)Stock Pile - Alderbrook Good Crushing J- Toledo Quarry L-291 292 Tons of Chiprock 895 895 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck,Pup and Operator per Minute $2.52 $2.52 Travel Minutes 56 40 Load/Unload time 30 30 Cost per Load $216.72 $176.40 Total Loads 32 32 Trucking Cost per Ton $7.74 $6.30 Trucking Cost $6,927.30 $5,638.50 Chiprock Cost $16,110.00 $17,900.00 Tax on Chiprock $1,256.58 $1,396.20 Total Per Ton Chiprock+ Haul $27.14 $27.86 Total Cost $24,293.88 $24,934.70 Area 5(3/8-No.4 Crushed Screening)Stock Pile - Alderbrook Good Crushing J- Brim Quarry L-291 292 Tons of Chiprock 894 894 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck,Pup and Operator per Minute $2.52 $2.52 Travel Minutes 56 40 Load/Unload time 30 30 Cost per Load $216.72 $176.40 Total Loads 32 32 Trucking Cost per Ton $7.74 $6.30 Trucking Cost $6,919.56 $5,632.20 Chiprock Cost $16,092.00 $17,880.00 Tax on Chiprock $1,255.18 $1,394.64 Total Per Ton Chiprock+Haul $27.14 $27.86 Total Cost $24,266.74 $24,906.84 Area 5(3/8-No.4 Crushed Screening)Stock Pile - Alderbrook Quarry Good Crushing J- Larson L-291 292 Tons of Chiprock 4,423 4,423 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck,Pup and Operator per Minute $2.52 $2.52 Travel Minutes 80 62 Load/Unload time 30 30 Cost per Load $277.20 $231.84 Total Loads 158 158 Trucking Cost per Ton $9.90 $8.28 Trucking Cost $43,787.70 $36,622.44 Chiprock Cost $79,614.00 $88,460.00 Tax on Chiprock $6,209.89 $6,899.88 Total Per Ton Chiprock+Haul $29.30 $29.84 Total Cost $129,611.59 $131,982.32 Area 7(3/8-No.4 Crushed Screening)Stock Pile - Alderbrook Good Crushing J- Kiona Quarry L-291 292 Tons of Chiprock 2,901 2,901 Chiprock Per Ton $18.00 $20.00 $151.00/per hr=Cost for Truck,Pup and Operator per Minute $2.52 $2.52 Travel Minutes 124 108 Load/Unload time 30 30 Cost per Load $388.08 $347.76 Total Loads 104 104 Trucking Cost per Ton $13.86 $12.42 Trucking Cost $40,207.86 $36,030.42 Chiprock Cost $52,218.00 $58,020.00 Tax on Chiprock $4,073.00 $4,525.56 Total Per Ton Chiprock+ Haul $33.26 $33.98 Total Cost $96,498.86 $98,575.98 Total Overall Cost $575,606.88 615,292.66 BOCC AGENDA ITEM SUMMARY Resolution: 21-103 BOCC Meeting Date: March 16, 2021 Suggested Wording for Agenda Item: Agenda Type: Deliberation Failure to Execute Contract for the Material Purchase Re-Bid of Rock for the 2021 3R Program and Award to Second Lowest Bidder Contact: Josh Metcalf Phone: Department: PW - Public Works Description: Lewis County awarded the material purchase of rock for the 2021 3R program for 3/8 -No 4 Crushed Screening to Alderbrook Quarry on February 22, 2021. The Bidder failed to execute the contract. WSDOT 2020 Standard Specification Section 1-03.5 (Failure to Execute Contract) and supplemental language in the Contract Special Provisions state if this should occur, the Contracting Agency may then Award the Contract to the second lowest responsible Bidder. Resolution approval will award the 2021 Rock Purchase Rebid of 3/8-No 4 Crushed Screening to Good Crushing for a total of $615,292.66. NOTE: The commissioners passed a floor amendment 3-16-21 to change the award total to $615,292.66 and to replace the attachment with one that matches the new bid award. The official version (a copy of which is in Laserfiche) includes that updated attachment. The outdated attachment remains in PacketWriter. Approvals: Publication Requirements: Publications: User Status PA's Office Pending Additional Copies: Cover Letter To: Robin Saline, PW; Kim Amrine: PW; Rose Williams, PW; Tina Hemphill, PW