Loading...
List bids received/contractor selected for 2021 Countywide Base Stabilization Project, CRP 2192A. BEFORE THE BOARD OF COUNTY COMMISSIONERS LEWIS COUNTY, WASHINGTON IN THE MATTER OF: RESOLUTION NO. 21-203 LISTING OF BIDS AND CONTRACTOR SELECTED FOR THE 2021 COUNTYWIDE BASE STABILIZATION PROJECT, CRP 2192A WHEREAS, a call for bids was issued May 6, 2021, for the 2021 Base Stabilization Project, CRP 2192A; and WHEREAS, bid quotations have been submitted from the contractors as follows: Contractor Name Bid Amount Ground Up Road Construction, Milton, $100,889.40 WA WHEREAS, Ground Up Road Construction provided the lowest responsive bid quote of $100,889.40 for the 2021 Countywide Base Stabilization Project, CRP 2192A. NOW THEREFORE BE IT RESOLVED that the contract for the 2021 Countywide Base Stabilization Project, CRP 2192A shall be awarded to Ground Up Road Construction in the amount of $100,889.40 upon the execution of a contract acceptable to the Board of County Commissioners (BOCC). Upon presentation of such a contract, the County Engineer is authorized to sign on behalf of the BOCC. DONE IN OPEN SESSION this 25th day of May, 2021. Page 1 of 2 Res. 21-203 APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON Amber Smith Gary Stamper By: Amber Smith, Gary Stamper, Chair Deputy Prosecuting Attorney ATTEST: •'•°Z);i'r;*"qs•.Fh Lindsey R. Pollock, DVM o• , ��`Pao f•, , �CB Ludsey R. Pollock, DVM, Vice Chair SX .< vg45 ;F} •Ny` J fib ��. Rieva Lester ••'�:yCO `;��• Sean D. Swope 'mac:::'•• Rieva Lester, Sean D. Swope, Commissioner Clerk of the Lewis County Board of County Commissioners Page 2 of 2 Res. 21-203 iCRP No.2192A 2021 Countywide Base Stabilization Project u E May 20,2021 ,,m ccg8:Z, o¢ , '�3m cm c oa8� W TOTAL BID I 100,889.40 I 128,582.80 1 Mobilization Charge 2 L.S. 2,500.00 2,500.00 7,690.00 15,380.00 2 Pavement Pulverization((g/0.50'Depth) 18,567 S.Y. 0.68 12,625.56 0.85 15,781.95 3 Additional Pavement Pulverization(Per Each Additional 0.1'Depth) 1 S.Y. 0.20 0.20 0.05 0.05 4 Mixing Base Stabilization(a 0.80'Depth) 18,567 S.Y. 0.82 15,224.94 1.80 33,420.60 5 Additional Mixing Base Stabilization(Per Each Additional 0.1'Depth) 1 S.Y. 0.20 0.20 0.20 0.20 6 Cement(Type II) 450 TON 156.53 70,438.50 140.00 63,000.00 7 SPCC Plan 1 L.S. 100.00 100.00 1,000.001 1,000.00 BOCC AGENDA ITEM SUMMARY Resolution: 21-203 BOCC Meeting Date: May 25, 2021 Suggested Wording for Agenda Item: Agenda Type: Deliberation Listing of bids and contractor selected for the 2021 Countywide Base Stabilization Project, CRP 2192A Contact: Josh Metcalf Phone: 360-740-2762 Department: PW - Public Works Description: A call for bids for the 2021 Countywide Base Stabilization Project, CRP 2192A was made on May 6, 2021. The project was advertised in the Chronicle, the Seattle Daily Journal of Commerce, and Lewis County's website. Public Works received one (1) bids for this project May 20, 2021. Ground Up Road Construction provided the lowest responsive bid of $100,889.40. The engineer's estimate was $128,582.80. Public Works staff recommends acceptance of the low bid provided by Ground Up Road Construction. Approvals: Publication Requirements: Publications: User Status PA's Office Pending Additional Copies: Cover Letter To: Tina Hemphill, Kim Amrine, Robin Saline, Rose Williams; PW