NOH: Proposed 2022 Annual Construction Program (ACP)/Six-Year Transportation Improvement Program (TIP) for the years 2022-2027 BEFORE THE BOARD OF COUNTY COMMISSIONERS LEWIS COUNTY, WASHINGTON IN THE MATTER OF: RESOLUTION NO. 21-384 NOTICE OF PUBLIC HEARING FOR THE PROPOSED 2022 ANNUAL CONSTRUCTION PROGRAM (ACP) AND SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (TIP) FOR THE YEARS 2022-2027 WHEREAS, RCW 36.81.121 requires the legislative authority of each county prepare and adopt a TIP that includes proposed road and bridge construction work for the ensuing six calendar years; and WHEREAS, WAC 136-16 requires the legislative authority of each county to prepare and adopt an ACP that includes proposed road and bridge construction work for the ensuing calendar year, and that said program shall be adopted at any time prior to the adoption of the budget; and WHEREAS, on the 27th day of September 2021, the 2022-2027 Six Year TIP and 2022 ACP were submitted to the office of the Lewis County Board of County Commissioners (BOCC); and WHEREAS, the 2022-2027 Six Year TIP and 2022 ACP reports and all related materials have been reviewed by the BOCC and found appropriate for further proceedings. NOW THEREFORE BE IT RESOLVED that the 23rd day of November 2021, at or after the hour of 10:00 a.m. in the Commissioners' Hearing Room on the 2nd floor of the Historic Courthouse in Chehalis, Washington, has been fixed by the BOCC as the time and place for the hearing on the 2022-2027 Six Year TIP and 2022 ACP, when and where all persons may appear and be heard upon these programs; and that the Clerk of the BOCC is hereby instructed to proceed with all necessary notifications, postings and publications. DONE IN OPEN SESSION this 9th day of November, 2021. Page 1 of 2 Res. 21-384 APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON Amber Smith Lindsey R. Pollock, DVM By: Amber Smith, Lindsey R. Pollock, DVM, Chair Deputy Prosecuting Attorney ATTEST: •'c°�NTY"AS•. Sean D. Swope •v�QO�`Rp OF'.'`i Sean D. Swope, Vice Chair so •t 1845 .;' •• 1''= fib �tJS�'o: Rieva Lester '•�sCO> `• '•yJti(;To>•.. Rieva Lester, Vacant, Commissioner Clerk of the Lewis County Board of County Commissioners Page 2 of 2 Res. 21-384 NOTICE OF HEARING NOTICE IS HEREBY GIVEN that the Board of County Commissioners, Lewis County, Washington, proposes to adopt the Comprehensive Road and Bridge Construction Program for the six calendar years 2022 through 2027, known as the Six-Year Transportation Improvement Program and the Annual Construction Program for 2022, on Tuesday, November 23, 2021, on or after 10:00 a.m. at the Lewis County Courthouse, County Commissioners' Hearing Room, 351 NW North Street, Chehalis, Washington, at which time and place any person may appear to be heard, either for or against the adoption of the proposed plan. A draft plan will be available by requesting a copy from Lewis County Public Works at (360) 740-1123 or at our website at http://lewiscountywa.gov/. �..ZOt;4 Y,..... •vim•0 •4. 'C. • SYNC V; 1845 �;M DATED: November 9, 2021 V� 5`�% .sy .,coM�,�o. Rieva Lester, Clerk of the Lewis County Board of County Commissioners Publish: The Chronicle - November 11th and 18th, 2021 Lewis County Web Site: http://Iewiscountywa.gov/ ANNUAL CONSTRUCTION PROGRAM FOR 2022 TOTAL Srs AGENCY ACTION: COUNTY>> LEWIS (A)TOTAL CONSTRUCTION PROGRAM -columns(14)+(15) S12,612,712 _ ���I ��' DATE RECOMMENDED PROG.SUBMITTED 09/27/2021 (B)PUBLISHED COUNTY FORCES LIMIT -- $1,279,143 DATE OF ENVIRONMENTAL ASSESSMENT (C)TOTAL COUNTY FORCES CONST PROGRAM-column(15) 6885,000 DATE OF FINAL ADOPTION ORDINANCE/RESOLUTION NO. ** Line (C) must be smaller than Line (B) " DATE OF AMENDMENT (1)1 (2) I (3) I (4) I (5) I (6)I (7) I (8) (9) I (10) I (11) (12) I (13) I (14) I (15) I (16) cc 1 11 _ aF SOURCES OF FUNDS ESTIMATED EXPENDITURES woo ROAD/PROJECT NAME w(2 z y U in �'.w w i a Z ROAD AND LOCATION R w 1 Oc4 y u.l w M w COUNTY OTHER FUNDS PRELIM.& RIGHT CONSTRUCTION wLOG 0-J I z 5 O a}- O w FUNDS CONST. OF GRAND r m NO. (Include brief termini description 1 12 d F j y AMOUNT PROGRAM ENGRING WAY COUNTY TOTAL or MP's;Bridge#) (Miles) I w< SOURCE 595.10 595.20 CONTRACT FORCES- ALL 595. 1 _ $1,279,140 I Non-Capital Improvement Projects 01 1 1 - Countywide Bridge/Road Bank Protection (Various Roads) - - FA,OTH 100,000E 25,000 75,000 100,000 02 1 11 64000 Stowell Road Bridge Scour(MP 0.57) - 09 FA,OTH I 1,000 STP(BR) ' 1,000 1,000 03 1 24017 King Road Bridge Scour(MP 12.26) - ' 08 i FA,OTH 25,4881 163,315 STP(BR) 188,8031 188,803 04 1 1 30501 Sargent Road Bridge Scour(MP 1.33) - 09 FA,OTH 28,654: 183,600 STP(BR) 212,2541 212,254 05 E 2 - Countywide Culvert Replacement(Various Roads) - - DR 35,000! 30,0001 5,000 35,000 06 2 1 94001 Centralia Alpha Road Culvert Replacement(MP 15.79) - 07 DR,FP 710,935 FBRB 710,935 710,935 07' 3 - EFederal Forest Road Improvements - - 3R,OTH 100,0001 5,000I 95,000 100,000 08 4I. - ,FEMA Repair Projects(Various Roads) - - ',, 09 4 78270 1 Carr Road Slide(MP 0.26-0.28) ! 0.02 07 OTH 67,500 472,500 FEMA,DEM 540,000 540,000 10 1 4 1 17190 Jones Road Culvert(MP 1.71) - 09 DR 12,500 87,5001 FEMA,DEM 100,000 100,000 11 E 4 164022 Pigeon Springs Road Slide(MP 2.30) - 09 OTH 45,375 317,625E FEMA,DEM 353,0001 10,000 363,000 12 4 63005 1Crumb Road Culvert&Road Repair(MP 0.17) - 09 OTH 159,750 1,118,2501E FEMA,DEM 1,278,000 1,278,000 13 4 1 75992 IKiona Road Hydraulic Study(MP 0.35) - ' 09 OTH 6,2501 43,7501E FEMA,DEM 50,0001 50,000 14 4 15051 Salzer Valley Road Slide(MP 5.35) 1 - 09 OTH 93,7501 656,250 FEMA,DEM 750,000 750,000 15 I Capital Improvement Projects 16 5 - Countywide 3R Program(Various Roads) - . - 3R 2,228,2981 436,702 CAPP 60,000 5,000 1,900,000 700,000 2,665,000 17 6 - !Countywide Paths&Trails - - '. P&T 25,000; P&T 5,000 5,000 5,000 10,000 25,000 18 6 62851 !Swofford Pedestrian Improvements(Green Mt.Road MP 0.000-1.500) 1.50 . 09 P&T 130,000 P&T 10,000 10,000 110,000 130,000 19 7 ' - !Countywide Emergent Construction Projects(Various Roads) - I - RC,3R 300,00011 50,000 10,000 225,000 15,000 300,000 20 8 - ECountywide Misc.Safety&Guardrail(Various Roads) - - SAFETY E 300,000 45,0001 5,000 200,000 50,000 300,000 21 9 40098 Shorey Road Bank Stabilization(MP 0.598-0.618) 0.02 I 18 OTH 335,475 2,149,525�! ER 630,223. 10,000 1,844,777 2,485,000 22 10 94001 1Centralia Alpha Road Improvements(MP 10.60-11.85) 1.25 07 NA,RC 1 1,027,100 3,372,9001 STP(R),RAP 50,0001 50,000 4,300,000 4,400,000 23 11 - 2021 County Safety Program - - SAFETY 98,000 HSIP 98,000 98,000 24 12 79908 Skate Creek North Bridge Scour(MP0.91-1.00) 0.09 07 , FA,OTH 13,500 86,500 FLAP 100,000 100,000 25 13 91000 Harrison Avenue Improvements&Planning Study(MP 0.55-2.54) 1.99 16 RC OTH 33,750 216,250 STP(U) 250,000 250,000 261 14 ! 17912 Wigley Road Improvements(MP 0.720-1.033) 0.31 09 j 3R 10,000 Other 5,000 5,000 10,000 271 15 62850 Swofford Road Rehabilitation(MP 0.000-1.777) 1.78 08 NA,RC 15,0001 10,000 5,000 15,000 28 1 16 , 94006 Rush Road Improvements(MP 2.600-3.164) 0.56 16 I 3R 5,0001 Other 5,000 5,000 29 17 161451 Boyd Road Rehabilitation(MP 0.00-1.14) 1.14 09 3R 10,000! 10,000 10,000 30 18 61450 Isbell Road Rehabilitation(MP 0.000-1.41) 1.41 09 3R 10,000 10,000 10,000 31 19 - North County Industrial Access(To Be Determined) - - NA 20,000! 20,000 20,000 32 20 - Westside Connector - - BR,NA 10,000! 10,0001 10,000 33 21 1 65605 Townsend Bridge No.223 Replacement 0.22 - BR 1,000 STP(BR) 1,000 1,000 34 22 - 2019 County Safety Program - - I SAFETY '., 2,000 HSIP 2,000 2,000 3511 ""r""v"• N.: _ Align ment ! ]R eh-Rehabilitate.Resurface, .* lit:"-:ray R. :`'lance '..37! -N. s..�a. TM MS. ,....00.. -Omar I 39 1 1 1 L. PAGE/PROGRAM TOTALS,CONSTRUCTION • 5,147,390 10,117,602 _ 2,332,280 120,000 11,927,712 885,000 15,264,992 Six Year Transportation Improvement Program, 2022 to 2027 inlitAFT 2022 2023 2024 2025-2027 Project Priority Project BMP EMP PE ROW Constr PE ROW Constr PE ROW Constr PE ROW Constr Total Non-Capital Improvement Projects 1 Countywide Bridge/Road Bank Protection - - $426 $76 $25 $23 $75 $25 $1,463 $75 $75 $150 $2,413 (King Road,Sargent Road,&Countywide Program) 2 Countywide Culvert Replacement - - $30 $5 $711 $10 $10 $815 $30 $1,611 (Centralia Alpha Road&Countywide Program) 3 Federal Forest Road Improvements - - $5 $95 $5 $95 $5 $95 $15 $285 $600 4 FEMA Repair Projects - - $503 $10 $2,568 $150 $10 $840 $150 $10 $840 $450 $30 $2,520 $8,081 (Carr,Jones,Crumb,Kiona,Salzer Valley,&Pigeon Springs Roads) Capital Improvement Projects 5 Countywide 3R Program - - $60 $5 $2,600 $40 $2 $550 $40 $2 $550 $120 $6 $1,650 $5,625 6 Countywide Paths&Trails - - $15 $15 $125 $3 $2 $15 $3 $2 $15 $9 $6 $45 $255 7 Countywide Emergent Construction Projects - - $50 $10 $240 $50 $10 $240 $50 $10 $240 $150 $30 $720 $1,800 8 Countywide Misc.Safety&Guardrail - - $45 $5 $250 $45 $5 $250 $45 $5 $250 $135 $15 $750 $1,800 9 Shorey Road Bank Stabilization 0.598 0.618 $630 $10 $1,845 $2,485 10 Centralia Alpha Road Improvements 10.600 11.850 $50 $50 $4,300 $200 $4,600 11 2021 County Safety Program - - $98 $809 $907 12 Skate Creek North Bridge Scour 0.910 1.000 $100 $200 $30 $10 $3,114 $3,454 13 Harrison Avenue Improvements 0.548 2.544 $250 $250 $250 $250 $1,000 14 Wigley Road Improvements 0.720 1.033 $5 $5 $5 $300 $315 15 Swofford Road Rehabilitation 0.000 1.777 $10 $5 $10 $750 $775 16 Rush Road Improvements 2.600 3.164 $5 $75 $100 $50 $50 $2,400 $2,680 17 Boyd Road Rehabilitation 0.000 1.140 $10 $10 $60 $50 $350 $480 18 Isbell Road Rehabilitation 0.000 1.410 $10 $10 $60 $50 $350 $480 19 North County Industrial Access - - $20 $5 $5 $1,000 $1,000 $18,000 $20,030 20 Westside Connector - $10 $50 $200 $100 $250 $150 $4,240 $5,000 21 Townsend Bridge#223 Replacement 0.220 - $1 $1 22 2019 County Safety Program - - $2 $2 23 Reynolds Avenue Improvements 0.099 0.993 $100 $100 $2,000 $2,200 24 Avery Road West Improvements 0.090 2.700 $180 $20 $10 $5 $500 $715 25 Tucker Road Widening 0.000 5.549 $100 $100 $185 $185 $2,280 $2,850 26 Avery Road West/North Military Road Intersection 0.430 0.470 $20 $50 $70 27 Teitzel Road Bridge Approach Repair 0.700 0.990 $30 $170 $200 28 Gallagher Road Extension 0.000 0.970 $100 $30 $970 $1,100 29 Downie Road Extension 0.000 - $100 $20 $1,080 $1,200 30 Highway 603(4)Rehabilitation 10.900 11.700 $120 $40 $951 $1,111 31 SR 505 Corridor Improvements 2.180 5.500 $1,022 $75 $1,791 $2,888 $0 Misc.Engineering,ROW,&Construction Costs $2,332 $120 $12,813 $943 $152 $3,374'$1,263 $409 $8,118 $4,171 $1,767 $41,266 $76,728 Construction TOTAL $15,265 $4,469 $9,790 $47,204 $76,728 Estimated Budget Annual Balance I ($15,265) I ($4,469) (S9,790) I_ ($47,204) S76,728 County Forces Construction Limit $1,279 $1,279 $1,279 $3,837 Page 1 Six Year Transportation Improvement Program, 2022 to 2027 Lewis Co.Funds 1MI 1 1 T Funding Sources 86.5% 80% 86.5% 87.5% 75%of 100% 90% Matching 13.5% 20% 13.5% 12.5% Project 10% Other Other Total Priority Project BMP EMP, Local Funds STP STP(BR) ER FEMA TIB CAPP RAP Fed/State Local Funding Non-Capital Improvement Projects 1 Countywide Bridge/Road Bank Protection - - $600 $57 s $1,756 $2,413 (King Road,Sargent Road,&Countywide Program) 2 Countywide Culvert Replacement - - $85 $1,526 $1,611 (Centralia Alpha Road&Countywide Program) 3 Federal Forest Road Improvements - - $600 $600 4 FEMA Repair Projects - - $0 $1,010 $6,061 $1,010 (Carr,Jones,Crumb,Kiona,Selzer Valley,&Pigeon Springs Roads) Capital Improvement Projects 5 Countywide 3R Program - - $3,005 $2,620 $5,625 6 Countywide Paths&Trails - - $255 $255 7 Countywide Emergent Construction Projects - - $1,800 $1,800 8 Countywide Misc.Safety&Guardrail - - $1,800 $1,800 9 Shorey Road Bank Stabilization 0.598 0.618 $0 $335 $2,150 $2,485 10 Centralia Alpha Road Improvements 10.600 11.850 $783 $444 $1,534 $1,839 $4,600 11 2021 County Safety Program - - $0 $907 $907 12 Skate Creek North Bridge Scour 0.910 1.000 $0 $466 $2,988 $3,454 13 Harrison Avenue Improvements 0.548 2.544 $0 $135 $865 $1,000 14 Wigley Road Improvements 0.720 1.033 $0 $315 $315 15 Swofford Road Rehabilitation 0.000 1.777 $775 $775 16 Rush Road Improvements 2.600 3.164 $0 $2,680 $2,680 17 Boyd Road Rehabilitation 0.000 1.140 $10 $470 $480 18 Isbell Road Rehabilitation 0.000 1.410 $10 $470 $480 19 North County Industrial Access - - $30 $20,000 $20,030 20 Westside Connector - - $10 $674 $4,316 $5,000 21 Townsend Bridge#223 Replacement 0.220 - $0 $1 $1 22 2019 County Safety Program - - $0 $2 $2 23 Reynolds Avenue Improvements 0.099 0.993 $0 $550 $1,650 $2,200 24 Avery Road West Improvements 0.090 2.700 $0 $97 $618 $715 25 Tucker Road Widening 0.000 5.549 $0 $285 $2,565 $2,850 26 Avery Road West/North Military Road Intersection 0.430 0.470 $50 $20 $70 27 Teitzel Road Bridge Approach Repair 0.700 0.990 $200 $200 28 Gallagher Road Extension 0.000 0.970 $0 $1,100 $1,100 29 Downie Road Extension 0.000 - $0 $1,200 $1,200 30 Highway 603(4)Rehabilitation 10.900 11.700 $0 $111 $1,000 $1,111 31 SR 505 Corridor Improvements 2.180 5.500 $722 $1,444 $722 $2,888 $0 $0 Misc.Engineering,ROW,&Construction Costs $10,735 I $4,164 $3,926 I $1,757 I $2,150 I $6,061 I $1,650 I $2,620 I $5,404 I $33,584 I $4,677 I $68,647 Construction TOTAL ii Lewis Co.Funds $76,728 Estimated Budget Annual Balance L Total- $14,899 County Forces Construction Limit Page 2 AI Mr «�Statesn Six Year Transportation Improvement Program of Tion From 2022 to 2027 Agency: Lewis Co. County: Lewis D RAF T MPO/RTPO: SWW RTPO N Inside Y Outside m Y ff v 0 A a 'o A.PIN/Project No. B.STIP ID 3 0 3 a. o a Z C.Project Title y m n 0 z e c D.Road Name or Number T. 0. c, S. R C) r d m 0 c E.Begin&End Termini vo Z a ,� E. an d F.Project Description G.Structure ID 2 a o Ire a g a a 00 1 WA-02926 14 C P S T W CE No Countywide Bridge/Road Bank Protection Various Roads to Countywide bank protection on various roads and bridges Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 150,000 150,000 S CN 2022 0 0 450,000 450,000 Totals 0 0 600,000 600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 25,000 25,000 25,000 25,000 50,000 CN 75,000 75,000 75,000 75,000 150,000 Totals 100,000 100,000 100,000 100,000 200,000 Report Date:October 19,2021 Page 1 7 Vfashirtgten Department of,n..�, >n Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '<_ v IT o' 'o c A.PIN/Project No. B.STIP ID ai 3 ° 3 c o m a Z C.Project Title > c ,Z _ p c D.Road Name or Number a o a o' '. 0 , m a m . E.Begin&End Termini v 3 -1 0 3 -I E. H m F.Project Description G.Structure ID ga cr a. o m e s a a 07 1 WA-13833 47 DCE Yes King MP 12.26 Bridge Scour 24017-King Rd 12.26 to N/A Bridge Scour-excavate,install scour countermeasures,replace abutment fill,and 08423800 return stream channel back to the center of the bridge span. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 STP(BR) 163,315 0 25,488 188,803 S RW 2023 STP(BR) 10,000 0 1,561 11,561 S CN 2024 STP(BR) 663,685 0 0 663,685 Totals 837,000 0 27,049 864,049 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 188,803 0 0 0 0 RW 0 11,561 0 0 0 CN 0 0 663,685 0 0 Totals 188,803 11,561 663,685 0 0 Report Date:October 19,2021 Page 2 41111116 Washi gtometo1"`Ti�..aportatron Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside - m v ° < c I. z T A.PIN/Project No. B.STIP ID D p N = 0 3 c Z C.Project Title y a Ft a 4 = , A Q c D.Road Name or Number a a a o n r d 2 m o. E.Begin&End Termini a v° 3 0 1 0 `D c m 1 E. m m F.Project Description G.Structure ID $ a o H 5 a 3 0. 07 1 WA-13838 47 DCE Yes Sargent MP 1.33 Bridge Scour 30501-Sargent Rd 1.33 to N/A Bridge Scour-excavate,install scour countermeasures,and return stream channel 08173000 to original profile. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 STP(BR) 183,600 0 28,654 212,254 S RW 2023 STP(BR) 10,000 0 1,561 11,561 S CN 2024 STP(BR) 724,500 0 0 724,500 Totals 918,100 0 30,215 948,315 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 212,254 0 0 0 0 RW 0 11,561 0 0 0 CN 0 0 724,500 0 0 Totals 212,254 11,561 724,500 0 0 Report Date:October 19,2021 Page 3 TOn Statent el e Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m -0 A ao A.PIN/Project No. B.STIP ID 3 c m o a a Z C.Project Title D ,� M m m o c D.Road Name or Number c a o .'. r m .0 m E.Begin&End Termini d v 3 m 1 0 3 1 E. m F.Project Description G.Structure ID a 00. F. c m m _ s a a 07 1 /2021(055) WA-10887 47 DCE No Stowell MP 0.57 Bridge Scour 64000-Stowell Rd 0.57 to N/A Scour Repair-scour has undermined approach and spread footings. This project is 08137600 I to armor the abutment and spread footings. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 STP(BR) 1,000 0 0 1,000 Totals 1,000 0 0 1,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 1,000 0 0 0 0 Totals 1,000 0 0 0 0 Report Date:October 19,2021 Page 4 «� TM,,, ,�,a, Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 <_' v A o N < C i A.PIN/Project No. B.STIP ID 3 o D = o o o Z C.Project Title D A c 2 , _ a p c D.Road Name or Number m o. o. o — n r = a mE.Begin&End Termini m o. -oo 3 —1 o 1 c. m w m F.Project Description G.Structure ID' S a a o m a g m a. 00 2 WA-04989 44 C P T Yes Countywide Culvert Replacement Various Roads to Remove and replace barrier culverts,provide stream enhancements for fish passage,and replacement of maintenance culverts. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 80,000 80,000 S RW 2022 0 0 5,000 5,000 Totals 0 0 85,000 85,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 30,000 10,000 10,000 10,000 20,000 RW 5,000 0 0 0 0 Totals 35,000 10,000 10,000 10,000 20,000 Report Date:October 19,2021 Page 5 T � °,rt.�t ,o„ Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 _ -I' -0 o a c • A.PIN/Project No. B.STIP ID 3 c 3 c o m Z C.Project Title > m c „ n 3,3 a c D.Road Name or Number = o 0. c a n r E.— .0 d E.Begin&End Termini ` v 3 ' —i o C 1 E. m a m C4 F.Project Description G.Structure ID m' o. a z a a g m o. 05 2 WA-13254 44 CPT 0.040 CE Yes Countywide Culvert Replacement-Centralia Alpha(MP 15.79) 94001-Centralia Alpha Rd 15.77 to 15.81 Title Category-County Culvert Replacement I Replacement of maintenance culvert and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 0 OTHER 710,935 0 710,935 Totals 0 710,935 0 710,935 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 710,935 0 0 0 0 Totals 710,935 0 0 0 0 Report Date:October 19,2021 Page 6 Wt°ft State af ,t Six Year Transportation Improvement Program on From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 y .o A I.?al T A.PIN/Project No. B.STIP ID D c m c o 3 f zC.Project Title D A c m B = xi n a c D.Road Name or Number a o a c c� r m d E.Begin&End Termini v 3 —1 o = 1 E. e m F.Project Description G.Structure ID o z a a a o. 07 2 WA-13255 44 C P T 0.040 CE Yes Countywide Culvert Replacement-Kruger(MP 1.20) 46032-Kruger Rd 1.18 to 1.22 Title Category-County Culvert Replacement Replacement of maintenance culvert and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2024 0 OTHER 814,686 0 814,686 Totals 0 814,686 0 814,686 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 0 0 814,686 0 0 Totals 0 0 814,686 0 0 Report Date:October 19,2021 Page 7 T oWashington i onSt�Transportation Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 < v 'o — A A.PIN/Project No. B.STIP ID 3 c a o m C Z C.Project Title e c 3 c. c D.Road Name or Number 0. 'y c •'. n r d a . E.Begin&End Termini v° 3 ' —1 o = 1 E. an d F.Project Description G.Structure ID a a z a H s a a 00 3 WA-02927 05 P T CE No Federal Forest Road Improvements USFS Roads to Maintenance improvements to access Federal Forest lands. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 30,000 30,000 S CN 2022 0 0 570,000 570,000 Totals 0 0 600,000 600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 5,000 5,000 5,000 10,000 CN 95,000 95,000 95,000 95,000 190,000 Totals 100,000 100,000 100,000 100,000 200,000 Report Date:October 19,2021 Page 8 TWashington iSt'tin.rts�orcnao�, Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 Y a I. O D a < c j 73 A.PIN/Project No. B.STIP ID 3 2 1° a'' o a c Z C.Project Title D a c m m .. 73 c D.Road Name or Number m o. a o` n r m ,n m0 c E.Begin&End Termini m xi 3 -+ O 1 c. a,m • F.Project Description G.Structure ID a ,'. ? m mcia m 2. 00 4 WA-14046 04 P T W CE Yes FEMA Repair Projects Various Countywide to Countywide FEMA repair projects-facilities damaged by disaster events Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 FEMA 939,750 OTHER 156,625 156,625 1,253,000 S RW 2022 FEMA 45,000 OTHER 7,500 7,500 60,000 S CN 2022 FEMA 5,076,000 OTHER 846,000 846,000 6,768,000 Totals 6,060,750 1,010,125 1,010,125 8,081,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 503,000 150,000 150,000 150,000 300,000 RW 10,000 10,000 10,000 10,000 20,000 CN 2,568,000 840,000 840,000 840,000 1,680,000 Totals 3,081,000 1,000,000 1,000,000 1,000,000 2,000,000 Report Date:October 19,2021 Page 9 War". Washingtonrtment ot�,,,, ,t Six Year Transportation Improvement Program on From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 0 7 v - 00 A.PIN/Project No. B.STIP ID 3 CO `5 .°i. 3 0c Z C.Project Title D m c 3 . m a A n 2 c D.Road Name or Number o. o, 'o' F. r- = 2 m v E.Begin&End Termini - m ' 3 o C. N m d, F.Project Description G.Structure ID 2 a 0�, o O. s a 00 5 WA-02726 06 P T W CE Yes Countywide 3R Program Various Roads to Countywide preservation activities including:CTB,thin lifts of HMA,BST,pavement markers,and shoulder rock on various roads. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 260,000 260,000 S RW 2022 0 0 15,000 15,000 S CN 2022 0 CRAB 2,620,212 2,729,788 5,350,000 Totals 0 2,620,212 3,004,788 5,625,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 60,000 40,000 40,000 40,000 40,000 RW 5,000 2,000 2,000 2,000 2,000 • CN 2,600,000 550,000 550,000 550,000 550,000 Totals 2,665,000 592,000 592,000 592,000 592,000 Report Date:October 19,2021 Page 10 Washington�of,;,�, ,,ion Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< v v - A a 0 .n o A.PIN/Project No. B.STIP ID 3 c m a o 3 ZC.Project Title y a ca d 73 n a. c D.Road Name or Number a 0. o. o - C1 r F. d c E.Begin&End Termini v 3 ' o i E. H d F.Project Description G.Structure ID 0 o. o a w T a a 00 6 WA-10775 28 P T CE Yes Countywide Paths&Trails Various Locations to Construction and preservation of paths&trails at various locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 20,000 20,000 S RW 2022 0 0 15,000 15,000 S CN 2022 0 0 90,000 90,000 Totals 0 0 125,000 125,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 3,000 3,000 3,000 6,000 RW 5,000 2,000 2,000 2,000 4,000 CN 15,000 15,000 15,000 15,000 30,000 Totals 25,000 20,000 20,000 20,000 40,000 Report Date:October 19,2021 Page 11 T���" Washington State Six Year Transportation Improvement Program ��/ Department of flansportation From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m v 3 '_ A o ,, a A.PIN/Project No. B.STIP ID D c .°i a g Z C.Project Title D a a a a x 2 c D.Road Name or Number a o. o. c r = .0 mc E.Begin&End Termini 13 3an -i o . H m F.Project Description G.Structure ID a o a a s m a 00 6 WA-10776 28 P T W CE Yes Countywide Paths&Trails-Swofford Pedestrian Improvements Swofford Rd&Green Mt.Rd to Construction of bike and pedestrian facilities. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 10,000 10,000 S RW 2022 0 0 10,000 10,000 S CN 2022 0 0 110,000 110,000 Totals 0 0 130,000 130,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 0 0 0 0 RW 10,000 0 0 0 0 CN 110,000 0 0 0 0 Totals 130,000 0 0 0 0 Report Date:October 19,2021 Page 12 T�� Washington State Six Year Trans ion Im rovement Pro ram vI/ Department of Transportation p p g From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '<_ z o o m o A.PIN/Project No. B.STIP ID 3 o 'zt_ o W c C.Project Title m m n F. xt a c D.Road Name or Number A c a o F. n r '_ a d E.Begin&End Termini `: -o 3 o —1' o a 1 c o- m z .c o. m m F.Project Description G.Structure ID m o. - o m m s o. 00 7 WA-10777 06 P T W Yes Countywide Emergent Construction Projects Various Roads to Design and construction of emergent construction projects,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 300,000 300,000 S RW 2022 0 0 60,000 60,000 S CN 2022 0 0 1,440,000 1,440,000 Totals 0 0 1,800,000 1,800,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 50,000 50,000 50,000 50,000 100,000 RW 10,000 10,000 10,000 10,000 20,000 CN 240,000, 240,000 240,000 240,000 480,000 Totals 300,000 300,000 300,000 300,000 600,000 Report Date:October 19,2021 Page 13 T «t TM ,« Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m o '< 3 'o g. a < C 1 o A A.PIN/Project No. B.STIP ID 3 0 3 = 3 Z C.Project Title y m cy m d xi t7 c D.Road Name or Number c •'c, o' a 0 r B. 2 o. E.Begin&End Termini ' 3 ' 1 0 1 E. a F.Project Description G.Structure ID 2 c 0 a o a 2 5 a a 00 8 WA-02925 21 P T W CE Yes Countywide Misc.Safety&Guardrail Various Roads to Perform various safety projects as needed and install guardrail at necessary locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 270,000 270,000 S RW 2022 0 0 30,000 30,000 S CN 2022 0 0 1,500,000 1,500,000 Totals 0 0 1,800,000 1,800,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 45,000 45,000 45,000 45,000 90,000 RW 5,000 5,000 5,000 5,000 10,000 CN 250,000 250,000 250,000 250,000 500,000 Totals 300,000 300,000 300,000 300,000 600,000 Report Date:October 19,2021 Page 14 T Washington Late ot Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< iS zY. '0 0 A.PIN/Project No. B.STIP ID T. a < c o m Z C.Project Title D a c a 2 d c D.Road Name or Number o. n o .'. n p1 2 m c E.Begin&End Termini °+ a A Z ,� a �o ,� c• m F.Project Description G.Structure ID a a P a a g a o. 06 9 WA-14047 04 0.020 CE No Shorey Road Bank Stabilization 40098-Shorey Rd 0.598 to 0.618 Permanent restoration-Bank stabilization will include a combination of a continuous bank roughening Large Woody Material(LWM)jams and LWM barbs. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 ER 545,143 0 85,080 630,223 S RW 2022 ER 8,650 0 1,350 10,000 S CN 2022 ER 1,595,732 0 249,045 1,844,777 Totals 2,149,525 0 335,475 2,485,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th • PE 630,223 0 0 0 0 RW 10,000 0 0 0 0 CN 1,844,777 0 0 0 0 Totals 2,485,000 0 0 0 0 Report Date:October 19,2021 Page 15 i7 Washington State Six Year Trans ortation Improvement Pro ram A; Department of Transportation p p J From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 1' v 0 T A.PIN/Project No. B.STIP ID 3 o < a c 3 Z C.Project Title y a c a m A n 0 c D.Road Name or Number o 'o o r m a o 3 E.Begin&End Termini v 3 ' 1 0 —I E. Fri m m F.Project Description G.Structure ID m' a » o a a s a a 05 10 /H210(008) WA-06389 03 C P T W 1.250 CE Yes Centralia Alpha Road Improvements 94001-Centralia Alpha Rd 10.600 to 11.85 Slope stabilization,intersection improvements,roadway widening,resurfacing with hot mix asphalt,guardrail,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 STP(R) 43,250 0 6,750 50,000 S RW 2022 0 0 50,000 50,000 S CN 2022 STP(R) 1,490,650 CRAB 1,839,000 1,170,350 4,500,000 Totals 1,533,900 1,839,000 1,227,100 4,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 50,000 0 0 0 0 RW 50,000 0 0 0 0 CN 4,300,000 200,000 0 0 0 Totals 4,400,000 200,000 0 0 0 Report Date:October 19,2021 Page 16 A. Washington State Six Year Transportation Improvement Program A. Department et Transportation From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m v o c A.PIN/Project No. B.STIP ID 3 0 1D 0 3e c = C.Project Title c 3 B r�o c D.Road Name or Number m c a o r- m y o a. E.Begin&End Termini v 3 = 1 0 —I E. H m F.Project Description G.Structure ID ,o o. � o m a s m o. 00 11 WA-14048 21 C P T W Yes 2021 County Safety Program Various Roads Countywide to Countywide Upgrade signs,improve clear zone,flatten slopes,add/upgrade barriers,widen shoulders,remove/modify fixed objects,and reduce pavement edge drop-offs. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 HSIP 98,000 0 0 98,000 S CN 2023 HSIP 809,000 0 0 809,000 Totals 907,000 0 0 907,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 98,000 0 0 0 0 CN 0 809,000 0 0 0 Totals 98,000 809,000 0 0 0 Report Date:October 19,2021 Page 17 WIWashington State Six Year Transportation Improvement Program . Department of Transportation p p g From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SVVW RTPO N Inside Y Outside m v v S. A.PIN/Project No. B.STIP ID 3 0 3 ;Im a =a C.Project Title X. w c m ,. Ela A c D.Road Name or Number c n o a r� r n a n- . E.Begin&End Termini v n a ,� oa 0 ,� E. z m m e e. F.Project Description G.Structure ID ro a P ,' a 5 _ a a. • 05 12 WA-14049 14 0.090 CE Yes Skate Creek North Bridge Scour 79908-Skate Creek Rd N 0.91 to 1.00 Bridge and road scour protection,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 WFL 285,450, 0 44,550 330,000 S RW 2024 WFL 8,650 0 1,350 10,000 S CN 2025 WFL 2,693,760 0 420,413 3,114,173 Totals 2,987,860 0 466,313 3,454,173 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 100,000 200,000 30,000 0 0 RW 0 0 10,000 0 0 CN 0 0 0 3,114,173 0 Totals 100,000 200,000 40,000 3,114,173 0 Report Date:October 19,2021 Page 18 411111. Washington shi onSent Trion Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< , I.'o m A.PIN/Project No. B.STIP ID 3 0 < . o a c Z C.Project Title D m m ,g 6 p x c D.Road Name or Number m c a 0 F. r1 107. ° 2 m g cr E.Begin&End Termini a z ,< a ,� S. m m F.Project Description G.Structure ID 0 a P m a g a a 04 13 WA-13259 03 C G P S T 2.150 CE Yes W Harrison Avenue Improvements 91000-Harrison Avenue 0.570 to 2.717 Improvements including:widening of the roadway,sidewalks,street lights,storm water,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 STP(US) 865,000 0 135,000 1,000,000 Totals 865,000 0 135,000 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 250,000 250,000 250,000 250,000 0 Totals 250,000 250,000 250,000 250,000 0 Report Date:October 19,2021 Page 19 °'� , sat Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m I 3 3 v a - xi 0 0 c A.PIN/Project No. B.STIP ID 3 0 3 o a • Z C.Project Title = X. � m = 7 • c D.Road Name or Number a o. o. o n B. m- c E.Begin&End Termini m vo Z •- 0 c- m m F.Project Description G.Structure ID m . P m m s 3 a 09 14 CRP-2155 03 CPT 0.310 CE Yes Wigley Road Improvements 17912-Wigley Rd 0.720 to 1.033 Improve by grading,preleveling with HMA,horizontal and vertical alignments will be improved,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 10,000 10,000 S RW 2022 0 0 5,000 5,000 S CN 2023 0 0 300,000 300,000 Totals 0 0 315,000 315,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 5,000 0 0 0 RW 5,000 0 0 0 0 CN 0 300,000 0 0 0 Totals 10,000 305,000 0 0 0 Report Date:October 19,2021 Page 20 T Washington State .t Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 a I. A a 'o A.PIN/Project No. B.STIP ID 3 c A c o il f Z C.Project Title = y a c m m z c D.Road Name or Number a a a o a r R. 2 m o. E.Begin&End Termini m xi S z ,� ° co .Z 5. ,n m F F.Project Description G.Structure ID m c. P m y g o a 08 15 CRP-2137 03 P T 1.780 CE Yes Swofford Road Rehabilitation 62850-Swofford Rd 0.000 to 1.777 Improve by grading,preleveling with asphalt class A,horizontal and vertical alignments will be improved,intersection realignment,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 20,000 20,000 S RW 2022 0 0 5,000 5,000 S CN 2024 0 0 750,000 750,000 Totals 0 0 775,000 775,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 10,000 0 0 0 RW 5,000 0 0 0 0 CN 0 0 750,000 0 0 Totals 15,000 10,000 750,000 0 0 Report Date:October 19,2021 Page 21 Washington nStateent ot Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 < v v z a 'o r A.PIN/Project No. B.STIP ID D c m o c Z C.Project Title D m S. m ,. d S A 0 c D.Road Name or Number oT o. c, S. rt V, E. a y e . E.Begin&End Termini v 3 ' 1 0 C E. m m ; F.Project Description ' a o a°G.Structure ID a s 5D S. 16 16 CRP-2153 03 C G P S T 0.560 CE Yes W Rush Road Improvements 94006-Rush Rd 2.600 to 3.164 Major widening,possible curb and gutter,sidewalks,base stabilization,HMA,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 130,000 130,000 P RW 2023 0 0 150,000 150,000 P CN 2024 0 0 2,400,000 2.400,000 Totals 0 0 2,680,000 2,680,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 75,000 50,000 0 0 RW 0 100,000 50,000 0 0 CN 0 0 2,400,000 0 0 Totals 5,000 175,000 2,500,000 0 0 Report Date:October 19,2021 Page 22 Washington State .t Six Year Transportation Improvement Program 7i Department From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< -0 - m -- A.PIN/Project No. B.STIP ID D o 0 3 c z C.Project Title D a •cy m 2,^. c D.Road Name or Number m c n B. F. r " a m c E.Begin&End Termini m v 2 Z ,� oa ,a � E. an d LI F.Project Description G.Structure ID m' a F. o m m g m n 09 17 CRP-2151 06 CPT 1.140 CE Yes Boyd Road Rehabilitation 61451-Boyd Rd 0.000 to 1.140 Vertical and horizontal improvements,base stabilization,BST,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 80,000 80,000 P RW 2024 0 0 50,000 50,000 P CN 2024 0 0 350,000 350,000 Totals 0 0 480,000 480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th$6th PE 10,000 10,000 60,000 0 0 RW 0 0 50,000 0 0 CN 0 0 350,000 0 0 Totals 10,000 10,000 460,000 0 0 Report Date:October 19,2021 Page 23 ANL o'� at. Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside 3 '< •0 .0 — a A O C A A.PIN/Project No. B.STIP ID 3 a 3 o W f a Z C.Project Title D o c d F X c D.Road Name or Number a a a o F. n r F. 2 mc E.Begin 8 End Termini �' v m a z ,ic a so ,-c E. m F.Project Description G.Structure ID 0 a R. o m H g m a 09 18 CRP-2152 06 CPT 1.410 CE Yes Isbell Road Rehabilitation 61450-Isbell Rd 0.000 to 1.410 Vertical and horizontal improvements,base stabilization,BST,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 80,000 80,000 P RW 2024 0 0 50,000 50,000 P CN 2024 0 0 350,000 350,000 Totals 0 0 480,000 480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 10,000 60,000 0 0 RW 0 0 50,000 0 0 CN 0 0 350,000 0 0 Totals 10,000 10,000 460,000 0 0 Report Date:October 19,2021 Page 24 7Washington t tat. Six Year Transportation Improvement Program Transportation From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m v a A 0 0 • A.PIN/Project No. B.STIP ID 3 0 3 5 o m Z C.Project Title D m c ,� ,Z i A n c D.Road Name or Number m o. n o c� r F. a a m cr . E.Begin&End Termini ,' v Z ,� a ,c S. m m • F.Project Description G.Structure ID m . o m a o, 00 19 WA-07344 15 CE No North County Industrial Access N/A to N/A Finalize regional design efforts for a direct industrial ingress/egress arterial two-lane, two-way truck route from Interstate 5 to North Lewis County industrial properties. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 30,000 30,000 P PE 2025 0 OTHER 1,000,000 0 1,000,000 P RW 2025 0 OTHER 1,000,000 0 1,000,000 P CN 2025 0 OTHER 18,000,000 0 18,000,000 Totals 0 20,000,000 30,000 20,030,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 20,000 5,000 5,000 1,000,000 0 RW 0 0 0 1,000,000 0 CN 0 0 0 3,000,000 15,000,000 Totals 20,000 5,000 5,000 5,000,000 15,000,000 Report Date:October 19,2021 Page 25 T" Washington State Six Year Transportation Improvement Program Department of Transportation p p g From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 <<_ v A o A.PIN/Project No. B.STIP ID 3 a 3 o Z C.Project Title D m E. m m A c D.Road Name or Number 0 a o, o 2. 0 r- n d o c E.Begin&End Termini v° 3 ' 1 0 1 c g.a m F.Project Description G.Structure ID o ID�, o a s o. a 07 20 WA-14050 08 C P T W CE Yes Westside Connector To be determined to To be determined New bridge and roadways to provide a westside connection over the Chehalis River Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 10,000 10,000 P PE 2023 Discretionary 432,500 0 67,500 500,000 P RW 2024 Discretionary 216,250 0 33,750 250,000 P CN 2026 Discretionary 3,667,600 0 572,400 4,240,000 Totals 4,316,350 0 683,650 5,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 50,000 200,000 200,000 50,000 RW 0 0 100,000 100,000 50,000 CN 0 0 0 0 4,240,000 Totals 10,000 50,000 300,000 300,000 4,340,000 Report Date:October 19,2021 Page 26 TWashingtonent ot to Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 v v A ° 'o .n o A.PIN/Project No. B.STIP ID D c o c Z C.Project Title D E. 3 d a A c D.Road Name or Number m o a o a t7 r d a m c E.Begin&End Termini m ' 3 -i o a 1 c. 0 B. 9, F.Project Description G.Structure ID �o o, o a a s a a 07 21 /2021(056) WA-10885 10 0.010 DCE No Townsend Bridge#223 Replacement 65605-Townsend Rd 0.22 to N/A Bridge replacement. 08294200 Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 STP(BR) 1,000 0 0 1,000 Totals 1,000 0 0 1,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 1,000 0 0 0 0 Totals 1,000 0 0 0 0 Report Date:October 19,2021 Page 27 T Department State Six Year Transportation Improvement Program Wanspartation From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< z ° oa A r A.PIN/Project No. B.STIP ID D o A o zC.Project Title y 3 c a d 5 A n c D.Road Name or Number m °. a o a n r " a 0_, m c E.Begin&End Termini m ' Z ,� n ro ,� E. v,m , F.Project Description G.Structure ID 0 a o a m a a a 00 22 /000S(553) WA-12552 21 C P T W CE Yes 2019 County Safety Program-Phase II Various Roads Countywide to Countywide Upgrade signs,improve clear zone,flatten slopes,add/upgrade barriers,widen shoulders,remove/modify fixed objects,and reduce pavement edge drop-offs. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 HSIP 2,000 0 0 2,000 Totals 2,000 0 0 2,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 2,000 0 0 0 0 Totals 2,000 0 0 0 0 Report Date:October 19,2021 Page 28 Milk Washington , n Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPOIRTPO: SWW RTPO N Inside Y Outside m v27 xi c 0o m A.PINIProject No. B.STIP ID 3 a ET CD 7 xi `° o 2 zC.Project Title D m a = F. A 0. c D.Road Name or Number m o 00. I o F. 0 p1 2 d o c E.Begin&End Termini v0 z n 5. H m F.Project Description G.Structure ID o o m g m o 04 23 WA-13256 03 C P S T W 0.890 CE Yes Reynolds Road Improvements 91011-Reynolds Avenue 0.099 to 0.993 Improvements include widening of the roadway,sidewalks,street lights,storm water, and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 TIB 75,000 25,000 100,000 P RW 2026 0 TIB 75,000 25,000 100,000 P CN 2027 0 TIB 1,500,000 500,000 2,000,000 Totals 0 1,650,000 550,000 2,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 100,000 RW 0 0 0 0 100,000 CN 0 0 0 0 2,000,000 Totals 0 0 0 0 2,200,000 Report Date:October 19,2021 Page 29 �sof, tn Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m v ` z o' 00 -n - A.PIN/Project No. B.STIP ID 3 a c c_ 0 3 C.Project Title m c E. c D.Road Name or Number a a o a o R. n r m 2 m . E.Begin&End Termini -0 3 1 0 1 c. H m z e a c m w F.Project Description G.Structure ID o P a �, a 07 24 WA-02952 03 C G P T 2.610 CE Yes Avery Road West Improvements 30081-Avery Rd W 0.090 to 2.700 Base stabilization and roadway widening for anticipated industrial commercial traffic, and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 STP(R) 164,000 0 26,000 190,000 P RW 2024 STP(R) 21,000 0 4,000 25,000 P CN 2025 STP(R) 433,000 0 67,000 500,000 Totals 618,000 0 97,000 715,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 180,000 10,000 0 RW 0 0 20,000 5,000 0 CN 0 0 0 500,000 0 Totals 0 0 200,000 515,000 0 Report Date:October 19,2021 Page 30 Departmentsport Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 a Y. o — zo ao m o A.PIN/Project No. B.STIP ID a xi D c C a c z C.Project Title D m c� e E. a A 9 c D.Road Name or Number a a a o F. n m ,n mv E.Begin&End Termini d v° a ,x ct E. m m F.Project Description G.Structure ID co E. a . a m g a 05 25 WA-029541 03 C P T 5.550 CE No Tucker Road Improvements 95003-Tucker Rd 0.000 to 5.549 Improvements include widening to current standards,create shoulders,remove obstacles from the clear-zone,ditches,storm water,paved surfacing,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 CRAB 257,000 28,000 285,000 P RW 2024 0. CRAB 257,000 28,000 285,000 P CN 2025 0 CRAB 2,051,000 229,000 2,280,000 Totals 0 2,565,000 285,000 2,850,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 100,000 185,000 0 RW 0 0 100,000 185,000 0 CN 0 0 0 2,280,000 0 Totals 0 0 200,000 2,650,000 0 Report Date:October 19,2021 Page 31 Washington Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 S. a 0 A 'o 0 T o A.PIN/Project No. B.STIP ID D o �° o e c z C.Project Title D m c A ,7 = , A c D.Road Name or Number m 0. a o »- r� r m .2 m c E.Begin&End Termini ,' v 3 0 -I o S. F. B. F.Project Description G.Structure ID c. R. o m a g 0 a 07 26 WA-02955 03 C P T 0.040 CE No Avery Road West/North Military Road Intersection 30081-Avery Rd W&30062-N Military Rd 0.430 to 0.470 Intersection improvements and signalization,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 0 20,000 20,000 P CN 2026 0 0 50,000 50,000 Totals 0 0 70,000 70,0004 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 20,000 0 CN 0 0 0 0 50,000 Totals 0 0 0 20,000 50,000 Report Date:October 19,2021 Page 32 Washing411111. unstaent of }.�ts ,��t, Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside - m „ '0zrt, o 0 m O xi o A.PIN/Project No. B.STIP ID 3 o g 5. o a f zC.Project Title D m m 4 Ti E. A 0 c D.Road Name or Number A a a o a C) r E. a m c E.Begin&End Termini v° 3 ' 1 0 y E. COz y m F.Project Description G.Structure ID 2 at 2. 9 i : 5 0 a 07 27 WA-05043 03 C G P S T 3.320 CE Yes W SR 505 Corridor Improvements. SR 505 Mainline 2.180 to 5.500 Corridor improvements including truck climbing lane,intersection improvements, traffic signals,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 OTHER 511,000 511,000 1,022,000 P RW 2027 0 OTHER 37,500 37,500 75,000 P CN 2026 0 OTHER 895,500 895,500 1,791,000 Totals 0 1,444,000 1,444,000 2,888,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 225,000 797,000 RW 0 0 0 0 75,000 CN 0 0 0 0 1,791,000 Totals 0 0 0 225,000 2,663,000 Report Date:October 19,2021 Page 33 Tonent ``,�t> ,,�, Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 2 v -0 '< - z 'o oo r ' A.PIN/Project No. B.STIP ID D c o c C.Project Title D a a ,Z d a ,� c D.Road Name or Number a °. a o - 117 m 2 mo c E.Begin&End Termini a v a a ,< 5. H m F.Project Description G.Structure ID na c. o a N a- a o, 09 27 WA-02993 04 C P T 0.290 CE No Teitzel Road Bridge Approach Repair 17381-Teitzel Rd 0.700 to 0.990 Reconstruct bridge approaches and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 0 30,000 30,000 P CN 2026 0 0 170,000 170,000 Totals 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 0 0 0 30,000 CN 0 0 0 0 170,000 Totals 0 0 0 0 200,000 Report Date:October 19,2021 Page 34 7t�on� Six Year Transportation Improvement Program ransportation From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside I m 3 -' •v v - A ET o' 'o c A.PINIProject No. B.STIP ID 3 c 3 c o a f C.Project Title D a c E. A ° c D.Road Name or Number c o o. 0 ' n r DC n_. m c E.Begin&End Termini -a 3 Z a ,� E. N d F.Project Description G.Structure ID mo a o a a S a a 19 28 WA-02994 01 C G P S T 0.970 CE Yes W Gallagher Road Extension 11004-Gallagher Rd 0.000 to 0.970 Construct new urban roadway to Harrison Ave.,curb,gutter,sidewalks,illumination, and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 Discretionary 50,000 OTHER 50,000 0 100,000 P RW 2026 Discretionary 15,000 OTHER 15,000 0 30,000 P CN 2026 Discretionary 485,000 OTHER 485,000 0 970,000 Totals 550,000 550,000 0 1,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 100,000 RW 0 0 0 0 30,000 CN 0 0 0 0 970,000 Totals 0 0 0 0 1,100,000 Report Date:October 19,2021 Page 35 WashingtonIli State Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N inside Y Outside m I, ,00 A 0 0 m o A.PIN/Project No. B.STIP ID 3 o �° E.' a a z C.Project Title D m c E A c D.Road Name or Number m c o, iS F. n r n a m 2 c E.Begin&End Termini m v 3 a 1 0 1D 1 E.w Iv 31 F.Project Description G.Structure ID m 0. a 2 m O. s a o. 19 29 WA-02998 01 C G P S T 0.380 CE Yes W Downie Road Extension 40150-Downie Rd 0.000 to Construct new urban road to Maurin Rd.,base stabilization,HMA,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 Discretionary 50,000 OTHER 50,000 0 100,000 P RW 2026 Discretionary 10,000 OTHER 10,000 0 20,000 P CN 2026 Discretionary 540,000 OTHER 540,000 0 1,080,000 Totals 600,000 600,000 0 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 100,000 RW 0 0 0 0 20,000 CN 0 0 0 0 1,080,000 Totals 0 0 0 0 1,200,000 Report Date:October 19,2021 Page 36 ',ngton,t °`,n,�tsportn�r, Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside 3 Tiv 0 ° a < c 1 ' A T A.PIN/Project No. B.STIP ID 3 a 0 _. o a = C.Project Title D A c a3 3 y a D.Road Name or Number a a a o — n r - .0 o . E.Begin&End Termini v 3 1 0 a 1 c. m m m F.Project Description G.Structure ID c o, o a a 0- a o. 07 30 WA-03004 04 C P T 0.800 CE Yes Highway 603(4)Rehabilitation 93006-Hwy 603 10.900 to 11.700 Improve horizontal alignment,widen and reconstruct roadway base,overlay with HMA,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 CRAB 108,000 12,000 120,000 P RW 2026 0 0 40,000 40,000 P CN 2027 0 CRAB 892,000 59,000 951,000 Totals 0 1,000,000 111,000 1,111,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 120,000 RW 0 0 0 0 40,000 CN 0 0 0 0 951,000 Totals 0 0 0 0 1,111,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Lewis Co 22,347,485 34,803,958 19,576,715 76,728,158 Report Date:October 19,2021 Page 37 BOCC AGENDA ITEM SUMMARY Resolution: 21-384 BOCC Meeting Date: Nov. 9, 2021 Suggested Wording for Agenda Item: Agenda Type: Legal Notice Notice of Public Hearing for the proposed 2022 Annual Construction Program (ACP) and Six-Year Transportation Improvement Program (TIP) for the years 2022-2027 Contact: Josh Metcalf Phone: 2762 Department: PW - Public Works Description: This resolution is to give notice of a public hearing on November 23, 2021 for adoption of the 2022-2027 Six Year Transportation Improvement Program (TIP) and 2022 Annual Construction Program (ACP). Approvals: Publication Requirements: Publications: User Status The Chronicle - Thursday November 11th & Thursday November 18th PA's Office Pending Additional Copies: Cover Letter To: Tim Fife - PW Geoff Soderquist - PW Robin Saline - PW