NOH: Proposed 2022 Annual Construction Program (ACP)/Six-Year Transportation Improvement Program (TIP) for the years 2022-2027 BEFORE THE BOARD OF COUNTY COMMISSIONERS
LEWIS COUNTY, WASHINGTON
IN THE MATTER OF: RESOLUTION NO. 21-384
NOTICE OF PUBLIC HEARING FOR THE
PROPOSED 2022 ANNUAL CONSTRUCTION
PROGRAM (ACP) AND SIX-YEAR TRANSPORTATION
IMPROVEMENT PROGRAM (TIP) FOR THE YEARS
2022-2027
WHEREAS, RCW 36.81.121 requires the legislative authority of each county
prepare and adopt a TIP that includes proposed road and bridge construction work
for the ensuing six calendar years; and
WHEREAS, WAC 136-16 requires the legislative authority of each county to
prepare and adopt an ACP that includes proposed road and bridge construction
work for the ensuing calendar year, and that said program shall be adopted at
any time prior to the adoption of the budget; and
WHEREAS, on the 27th day of September 2021, the 2022-2027 Six Year TIP and
2022 ACP were submitted to the office of the Lewis County Board of County
Commissioners (BOCC); and
WHEREAS, the 2022-2027 Six Year TIP and 2022 ACP reports and all related
materials have been reviewed by the BOCC and found appropriate for further
proceedings.
NOW THEREFORE BE IT RESOLVED that the 23rd day of November 2021, at or
after the hour of 10:00 a.m. in the Commissioners' Hearing Room on the 2nd floor
of the Historic Courthouse in Chehalis, Washington, has been fixed by the BOCC
as the time and place for the hearing on the 2022-2027 Six Year TIP and 2022
ACP, when and where all persons may appear and be heard upon these programs;
and that the Clerk of the BOCC is hereby instructed to proceed with all necessary
notifications, postings and publications.
DONE IN OPEN SESSION this 9th day of November, 2021.
Page 1 of 2 Res. 21-384
APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS
Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON
Amber Smith Lindsey R. Pollock, DVM
By: Amber Smith, Lindsey R. Pollock, DVM, Chair
Deputy Prosecuting Attorney
ATTEST: •'c°�NTY"AS•. Sean D. Swope
•v�QO�`Rp OF'.'`i
Sean D. Swope, Vice Chair
so
•t 1845 .;'
•• 1''=
fib �tJS�'o:
Rieva Lester '•�sCO> `•
'•yJti(;To>•..
Rieva Lester, Vacant, Commissioner
Clerk of the Lewis County Board of
County Commissioners
Page 2 of 2 Res. 21-384
NOTICE OF HEARING
NOTICE IS HEREBY GIVEN that the Board of County Commissioners, Lewis County,
Washington, proposes to adopt the Comprehensive Road and Bridge Construction
Program for the six calendar years 2022 through 2027, known as the Six-Year
Transportation Improvement Program and the Annual Construction Program for 2022, on
Tuesday, November 23, 2021, on or after 10:00 a.m. at the Lewis County Courthouse,
County Commissioners' Hearing Room, 351 NW North Street, Chehalis, Washington, at
which time and place any person may appear to be heard, either for or against the
adoption of the proposed plan. A draft plan will be available by requesting a copy from
Lewis County Public Works at (360) 740-1123 or at our website at
http://lewiscountywa.gov/.
�..ZOt;4 Y,.....
•vim•0
•4. 'C.
•
SYNC
V; 1845 �;M
DATED: November 9, 2021 V� 5`�%
.sy .,coM�,�o.
Rieva Lester, Clerk of the Lewis County
Board of County Commissioners
Publish: The Chronicle - November 11th and 18th, 2021
Lewis County Web Site: http://Iewiscountywa.gov/
ANNUAL CONSTRUCTION PROGRAM FOR 2022
TOTAL Srs AGENCY ACTION: COUNTY>> LEWIS
(A)TOTAL CONSTRUCTION PROGRAM -columns(14)+(15) S12,612,712 _ ���I ��' DATE RECOMMENDED PROG.SUBMITTED 09/27/2021
(B)PUBLISHED COUNTY FORCES LIMIT --
$1,279,143 DATE OF ENVIRONMENTAL ASSESSMENT
(C)TOTAL COUNTY FORCES CONST PROGRAM-column(15) 6885,000 DATE OF FINAL ADOPTION
ORDINANCE/RESOLUTION NO.
** Line (C) must be smaller than Line (B) " DATE OF AMENDMENT
(1)1 (2) I (3) I (4) I (5) I (6)I (7) I (8) (9) I (10) I (11) (12) I (13) I (14) I (15) I (16)
cc 1 11 _ aF SOURCES OF FUNDS ESTIMATED EXPENDITURES
woo ROAD/PROJECT NAME w(2 z y U in �'.w w
i a Z ROAD AND LOCATION R w 1 Oc4 y u.l w M w COUNTY OTHER FUNDS PRELIM.& RIGHT CONSTRUCTION
wLOG 0-J I z 5 O a}- O w FUNDS CONST. OF GRAND
r m NO. (Include brief termini description 1 12 d F j y AMOUNT PROGRAM ENGRING WAY COUNTY TOTAL
or MP's;Bridge#) (Miles) I w< SOURCE 595.10 595.20 CONTRACT FORCES- ALL 595.
1 _ $1,279,140
I Non-Capital Improvement Projects
01 1 1 - Countywide Bridge/Road Bank Protection (Various Roads) - - FA,OTH 100,000E 25,000 75,000 100,000
02 1 11 64000 Stowell Road Bridge Scour(MP 0.57) - 09 FA,OTH I 1,000 STP(BR) ' 1,000 1,000
03 1 24017 King Road Bridge Scour(MP 12.26) - ' 08 i FA,OTH 25,4881 163,315 STP(BR) 188,8031 188,803
04 1 1 30501 Sargent Road Bridge Scour(MP 1.33) - 09 FA,OTH 28,654: 183,600 STP(BR) 212,2541 212,254
05 E 2 - Countywide Culvert Replacement(Various Roads) - - DR 35,000! 30,0001 5,000 35,000
06 2 1 94001 Centralia Alpha Road Culvert Replacement(MP 15.79) - 07 DR,FP 710,935 FBRB 710,935 710,935
07' 3 - EFederal Forest Road Improvements - - 3R,OTH 100,0001 5,000I 95,000 100,000
08 4I. - ,FEMA Repair Projects(Various Roads) - - ',,
09 4 78270 1 Carr Road Slide(MP 0.26-0.28) ! 0.02 07 OTH 67,500 472,500 FEMA,DEM 540,000 540,000
10 1 4 1 17190 Jones Road Culvert(MP 1.71) - 09 DR 12,500 87,5001 FEMA,DEM 100,000 100,000
11 E 4 164022 Pigeon Springs Road Slide(MP 2.30) - 09 OTH 45,375 317,625E FEMA,DEM 353,0001 10,000 363,000
12 4 63005 1Crumb Road Culvert&Road Repair(MP 0.17) - 09 OTH 159,750 1,118,2501E FEMA,DEM 1,278,000 1,278,000
13 4 1 75992 IKiona Road Hydraulic Study(MP 0.35) - ' 09 OTH 6,2501 43,7501E FEMA,DEM 50,0001 50,000
14 4 15051 Salzer Valley Road Slide(MP 5.35) 1 - 09 OTH 93,7501 656,250 FEMA,DEM 750,000 750,000
15 I Capital Improvement Projects
16 5 - Countywide 3R Program(Various Roads) - . - 3R 2,228,2981 436,702 CAPP 60,000 5,000 1,900,000 700,000 2,665,000
17 6 - !Countywide Paths&Trails - - '. P&T 25,000; P&T 5,000 5,000 5,000 10,000 25,000
18 6 62851 !Swofford Pedestrian Improvements(Green Mt.Road MP 0.000-1.500) 1.50 . 09 P&T 130,000 P&T 10,000 10,000 110,000 130,000
19 7 ' - !Countywide Emergent Construction Projects(Various Roads) - I - RC,3R 300,00011 50,000 10,000 225,000 15,000 300,000
20 8 - ECountywide Misc.Safety&Guardrail(Various Roads) - - SAFETY E 300,000 45,0001 5,000 200,000 50,000 300,000
21 9 40098 Shorey Road Bank Stabilization(MP 0.598-0.618) 0.02 I 18 OTH 335,475 2,149,525�! ER 630,223. 10,000 1,844,777 2,485,000
22 10 94001 1Centralia Alpha Road Improvements(MP 10.60-11.85) 1.25 07 NA,RC 1 1,027,100 3,372,9001 STP(R),RAP 50,0001 50,000 4,300,000 4,400,000
23 11 - 2021 County Safety Program - - SAFETY 98,000 HSIP 98,000 98,000
24 12 79908 Skate Creek North Bridge Scour(MP0.91-1.00) 0.09 07 , FA,OTH 13,500 86,500 FLAP 100,000 100,000
25 13 91000 Harrison Avenue Improvements&Planning Study(MP 0.55-2.54) 1.99 16 RC OTH 33,750 216,250 STP(U) 250,000 250,000
261 14 ! 17912 Wigley Road Improvements(MP 0.720-1.033) 0.31 09 j 3R 10,000 Other 5,000 5,000 10,000
271 15 62850 Swofford Road Rehabilitation(MP 0.000-1.777) 1.78 08 NA,RC 15,0001 10,000 5,000 15,000
28 1 16 , 94006 Rush Road Improvements(MP 2.600-3.164) 0.56 16 I 3R 5,0001 Other 5,000 5,000
29 17 161451 Boyd Road Rehabilitation(MP 0.00-1.14) 1.14 09 3R 10,000! 10,000 10,000
30 18 61450 Isbell Road Rehabilitation(MP 0.000-1.41) 1.41 09 3R 10,000 10,000 10,000
31 19 - North County Industrial Access(To Be Determined) - - NA 20,000! 20,000 20,000
32 20 - Westside Connector - - BR,NA 10,000! 10,0001
10,000
33 21 1 65605 Townsend Bridge No.223 Replacement 0.22 - BR 1,000 STP(BR) 1,000 1,000
34 22 - 2019 County Safety Program - - I SAFETY '., 2,000 HSIP 2,000 2,000
3511 ""r""v"•
N.: _ Align
ment
!
]R eh-Rehabilitate.Resurface,
.* lit:"-:ray
R. :`'lance '..37!
-N. s..�a. TM
MS. ,....00.. -Omar I
39
1 1 1 L.
PAGE/PROGRAM TOTALS,CONSTRUCTION • 5,147,390 10,117,602 _ 2,332,280 120,000 11,927,712 885,000 15,264,992
Six Year Transportation Improvement Program, 2022 to 2027
inlitAFT
2022 2023 2024 2025-2027 Project
Priority Project BMP EMP PE ROW Constr PE ROW Constr PE ROW Constr PE ROW Constr Total
Non-Capital Improvement Projects
1 Countywide Bridge/Road Bank Protection - - $426 $76 $25 $23 $75 $25 $1,463 $75 $75 $150 $2,413
(King Road,Sargent Road,&Countywide Program)
2 Countywide Culvert Replacement - - $30 $5 $711 $10 $10 $815 $30 $1,611
(Centralia Alpha Road&Countywide Program)
3 Federal Forest Road Improvements - - $5 $95 $5 $95 $5 $95 $15 $285 $600
4 FEMA Repair Projects - - $503 $10 $2,568 $150 $10 $840 $150 $10 $840 $450 $30 $2,520 $8,081
(Carr,Jones,Crumb,Kiona,Salzer Valley,&Pigeon Springs Roads)
Capital Improvement Projects
5 Countywide 3R Program - - $60 $5 $2,600 $40 $2 $550 $40 $2 $550 $120 $6 $1,650 $5,625
6 Countywide Paths&Trails - - $15 $15 $125 $3 $2 $15 $3 $2 $15 $9 $6 $45 $255
7 Countywide Emergent Construction Projects - - $50 $10 $240 $50 $10 $240 $50 $10 $240 $150 $30 $720 $1,800
8 Countywide Misc.Safety&Guardrail - - $45 $5 $250 $45 $5 $250 $45 $5 $250 $135 $15 $750 $1,800
9 Shorey Road Bank Stabilization 0.598 0.618 $630 $10 $1,845 $2,485
10 Centralia Alpha Road Improvements 10.600 11.850 $50 $50 $4,300 $200 $4,600
11 2021 County Safety Program - - $98 $809 $907
12 Skate Creek North Bridge Scour 0.910 1.000 $100 $200 $30 $10 $3,114 $3,454
13 Harrison Avenue Improvements 0.548 2.544 $250 $250 $250 $250 $1,000
14 Wigley Road Improvements 0.720 1.033 $5 $5 $5 $300 $315
15 Swofford Road Rehabilitation 0.000 1.777 $10 $5 $10 $750 $775
16 Rush Road Improvements 2.600 3.164 $5 $75 $100 $50 $50 $2,400 $2,680
17 Boyd Road Rehabilitation 0.000 1.140 $10 $10 $60 $50 $350 $480
18 Isbell Road Rehabilitation 0.000 1.410 $10 $10 $60 $50 $350 $480
19 North County Industrial Access - - $20 $5 $5 $1,000 $1,000 $18,000 $20,030
20 Westside Connector - $10 $50 $200 $100 $250 $150 $4,240 $5,000
21 Townsend Bridge#223 Replacement 0.220 - $1 $1
22 2019 County Safety Program - - $2 $2
23 Reynolds Avenue Improvements 0.099 0.993 $100 $100 $2,000 $2,200
24 Avery Road West Improvements 0.090 2.700 $180 $20 $10 $5 $500 $715
25 Tucker Road Widening 0.000 5.549 $100 $100 $185 $185 $2,280 $2,850
26 Avery Road West/North Military Road Intersection 0.430 0.470 $20 $50 $70
27 Teitzel Road Bridge Approach Repair 0.700 0.990 $30 $170 $200
28 Gallagher Road Extension 0.000 0.970 $100 $30 $970 $1,100
29 Downie Road Extension 0.000 - $100 $20 $1,080 $1,200
30 Highway 603(4)Rehabilitation 10.900 11.700 $120 $40 $951 $1,111
31 SR 505 Corridor Improvements 2.180 5.500 $1,022 $75 $1,791 $2,888
$0
Misc.Engineering,ROW,&Construction Costs $2,332 $120 $12,813 $943 $152 $3,374'$1,263 $409 $8,118 $4,171 $1,767 $41,266 $76,728
Construction TOTAL $15,265 $4,469 $9,790 $47,204 $76,728
Estimated Budget
Annual Balance I ($15,265) I ($4,469)
(S9,790) I_ ($47,204) S76,728
County Forces Construction Limit $1,279 $1,279 $1,279 $3,837
Page 1
Six Year Transportation Improvement Program, 2022 to 2027
Lewis Co.Funds 1MI 1 1 T
Funding Sources
86.5% 80% 86.5% 87.5% 75%of 100% 90%
Matching 13.5% 20% 13.5% 12.5% Project 10% Other Other Total
Priority Project BMP EMP, Local Funds STP STP(BR) ER FEMA TIB CAPP RAP Fed/State Local Funding
Non-Capital Improvement Projects
1 Countywide Bridge/Road Bank Protection - - $600 $57 s $1,756 $2,413
(King Road,Sargent Road,&Countywide Program)
2 Countywide Culvert Replacement - - $85 $1,526 $1,611
(Centralia Alpha Road&Countywide Program)
3 Federal Forest Road Improvements - - $600 $600
4 FEMA Repair Projects - - $0 $1,010 $6,061 $1,010
(Carr,Jones,Crumb,Kiona,Selzer Valley,&Pigeon Springs Roads)
Capital Improvement Projects
5 Countywide 3R Program - - $3,005 $2,620 $5,625
6 Countywide Paths&Trails - - $255 $255
7 Countywide Emergent Construction Projects - - $1,800 $1,800
8 Countywide Misc.Safety&Guardrail - - $1,800 $1,800
9 Shorey Road Bank Stabilization 0.598 0.618 $0 $335 $2,150 $2,485
10 Centralia Alpha Road Improvements 10.600 11.850 $783 $444 $1,534 $1,839 $4,600
11 2021 County Safety Program - - $0 $907 $907
12 Skate Creek North Bridge Scour 0.910 1.000 $0 $466 $2,988 $3,454
13 Harrison Avenue Improvements 0.548 2.544 $0 $135 $865 $1,000
14 Wigley Road Improvements 0.720 1.033 $0 $315 $315
15 Swofford Road Rehabilitation 0.000 1.777 $775 $775
16 Rush Road Improvements 2.600 3.164 $0 $2,680 $2,680
17 Boyd Road Rehabilitation 0.000 1.140 $10 $470 $480
18 Isbell Road Rehabilitation 0.000 1.410 $10 $470 $480
19 North County Industrial Access - - $30 $20,000 $20,030
20 Westside Connector - - $10 $674 $4,316 $5,000
21 Townsend Bridge#223 Replacement 0.220 - $0 $1 $1
22 2019 County Safety Program - - $0 $2 $2
23 Reynolds Avenue Improvements 0.099 0.993 $0 $550 $1,650 $2,200
24 Avery Road West Improvements 0.090 2.700 $0 $97 $618 $715
25 Tucker Road Widening 0.000 5.549 $0 $285 $2,565 $2,850
26 Avery Road West/North Military Road Intersection 0.430 0.470 $50 $20 $70
27 Teitzel Road Bridge Approach Repair 0.700 0.990 $200 $200
28 Gallagher Road Extension 0.000 0.970 $0 $1,100 $1,100
29 Downie Road Extension 0.000 - $0 $1,200 $1,200
30 Highway 603(4)Rehabilitation 10.900 11.700 $0 $111 $1,000 $1,111
31 SR 505 Corridor Improvements 2.180 5.500 $722 $1,444 $722 $2,888
$0 $0
Misc.Engineering,ROW,&Construction Costs $10,735 I $4,164 $3,926 I $1,757 I $2,150 I $6,061 I $1,650 I $2,620 I $5,404 I $33,584 I $4,677 I $68,647
Construction TOTAL ii Lewis Co.Funds $76,728
Estimated Budget
Annual Balance L Total- $14,899
County Forces Construction Limit
Page 2
AI Mr
«�Statesn Six Year Transportation Improvement Program
of Tion
From 2022 to 2027
Agency: Lewis Co.
County: Lewis D RAF T
MPO/RTPO: SWW RTPO N Inside Y Outside
m
Y ff v 0
A a 'o
A.PIN/Project No. B.STIP ID 3 0 3 a. o a
Z C.Project Title y m n 0 z
e c D.Road Name or Number T. 0. c, S. R C) r d
m 0 c E.Begin&End Termini vo Z a ,� E.
an d F.Project Description G.Structure ID 2 a o Ire a g a a
00 1 WA-02926 14 C P S T W CE No
Countywide Bridge/Road Bank Protection
Various Roads
to
Countywide bank protection on various roads and bridges
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 150,000 150,000
S CN 2022 0 0 450,000 450,000
Totals 0 0 600,000 600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 25,000 25,000 25,000 25,000 50,000
CN 75,000 75,000 75,000 75,000 150,000
Totals 100,000 100,000 100,000 100,000 200,000
Report Date:October 19,2021 Page 1
7 Vfashirtgten Department of,n..�, >n Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 '<_
v
IT o' 'o
c A.PIN/Project No. B.STIP ID ai
3 ° 3 c o m
a Z C.Project Title > c ,Z _ p
c D.Road Name or Number a o a o' '. 0 , m a
m . E.Begin&End Termini v 3 -1 0 3 -I E.
H m F.Project Description G.Structure ID ga cr
a. o m e s a a
07 1 WA-13833 47 DCE Yes
King MP 12.26 Bridge Scour
24017-King Rd
12.26 to N/A
Bridge Scour-excavate,install scour countermeasures,replace abutment fill,and 08423800
return stream channel back to the center of the bridge span.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 STP(BR) 163,315 0 25,488 188,803
S RW 2023 STP(BR) 10,000 0 1,561 11,561
S CN 2024 STP(BR) 663,685 0 0 663,685
Totals 837,000 0 27,049 864,049
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 188,803 0 0 0 0
RW 0 11,561 0 0 0
CN 0 0 663,685 0 0
Totals 188,803 11,561 663,685 0 0
Report Date:October 19,2021 Page 2
41111116
Washi gtometo1"`Ti�..aportatron Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
- m
v
° < c I.
z
T A.PIN/Project No. B.STIP ID D p N = 0 3
c Z C.Project Title y a Ft a 4 = , A
Q c D.Road Name or Number a a a o n r d 2
m o. E.Begin&End Termini a v° 3 0 1 0 `D c
m 1 E.
m m F.Project Description G.Structure ID $ a o H 5 a 3
0.
07 1 WA-13838 47 DCE Yes
Sargent MP 1.33 Bridge Scour
30501-Sargent Rd
1.33 to N/A
Bridge Scour-excavate,install scour countermeasures,and return stream channel 08173000
to original profile.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 STP(BR) 183,600 0 28,654 212,254
S RW 2023 STP(BR) 10,000 0 1,561 11,561
S CN 2024 STP(BR) 724,500 0 0 724,500
Totals 918,100 0 30,215 948,315
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 212,254 0 0 0 0
RW 0 11,561 0 0 0
CN 0 0 724,500 0 0
Totals 212,254 11,561 724,500 0 0
Report Date:October 19,2021 Page 3
TOn Statent el e Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
-0
A ao
A.PIN/Project No. B.STIP ID 3 c m o a
a Z C.Project Title D ,� M m m
o c D.Road Name or Number c a o .'. r m .0
m E.Begin&End Termini d v 3 m 1 0 3 1 E.
m F.Project Description G.Structure ID a 00. F. c m m _ s a a
07 1 /2021(055) WA-10887 47 DCE No
Stowell MP 0.57 Bridge Scour
64000-Stowell Rd
0.57 to N/A
Scour Repair-scour has undermined approach and spread footings. This project is 08137600 I
to armor the abutment and spread footings.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2022 STP(BR) 1,000 0 0 1,000
Totals 1,000 0 0 1,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 1,000 0 0 0 0
Totals 1,000 0 0 0 0
Report Date:October 19,2021 Page 4
«� TM,,, ,�,a, Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 <_'
v
A o
N < C i
A.PIN/Project No. B.STIP ID 3 o D = o o
o Z C.Project Title D A c 2 , _ a p
c D.Road Name or Number m o. o. o — n r = a
mE.Begin&End Termini m o. -oo 3 —1 o 1 c.
m
w m F.Project Description G.Structure ID' S a a o m a g m a.
00 2 WA-04989 44 C P T Yes
Countywide Culvert Replacement
Various Roads
to
Remove and replace barrier culverts,provide stream enhancements for fish
passage,and replacement of maintenance culverts.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 80,000 80,000
S RW 2022 0 0 5,000 5,000
Totals 0 0 85,000 85,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 30,000 10,000 10,000 10,000 20,000
RW 5,000 0 0 0 0
Totals 35,000 10,000 10,000 10,000 20,000
Report Date:October 19,2021 Page 5
T � °,rt.�t ,o„ Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 _
-I' -0
o a
c • A.PIN/Project No. B.STIP ID 3 c 3 c o m
Z C.Project Title > m c „ n 3,3
a c D.Road Name or Number = o 0. c a n r E.— .0
d E.Begin&End Termini ` v 3 ' —i o C 1 E.
m
a m C4 F.Project Description G.Structure ID m' o. a z a a g m o.
05 2 WA-13254 44 CPT 0.040 CE Yes
Countywide Culvert Replacement-Centralia Alpha(MP 15.79)
94001-Centralia Alpha Rd
15.77 to 15.81
Title Category-County Culvert Replacement
I Replacement of maintenance culvert and other related work
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2022 0 OTHER 710,935 0 710,935
Totals 0 710,935 0 710,935
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 710,935 0 0 0 0
Totals 710,935 0 0 0 0
Report Date:October 19,2021 Page 6
Wt°ft State af ,t Six Year Transportation Improvement Program
on
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3
y .o
A I.?al
T A.PIN/Project No. B.STIP ID D c m c o 3 f
zC.Project Title D A c m B = xi
n a c D.Road Name or Number a o a c c� r m
d E.Begin&End Termini v 3 —1 o = 1 E.
e m F.Project Description G.Structure ID o z a a a o.
07 2 WA-13255 44 C P T 0.040 CE Yes
Countywide Culvert Replacement-Kruger(MP 1.20)
46032-Kruger Rd
1.18 to 1.22
Title Category-County Culvert Replacement
Replacement of maintenance culvert and other related work
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2024 0 OTHER 814,686 0 814,686
Totals 0 814,686 0 814,686
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 0 0 814,686 0 0
Totals 0 0 814,686 0 0
Report Date:October 19,2021 Page 7
T oWashington
i onSt�Transportation Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 <
v 'o
—
A
A.PIN/Project No. B.STIP ID 3 c a o m
C Z C.Project Title e c 3
c. c D.Road Name or Number 0. 'y c •'. n r d a
. E.Begin&End Termini v° 3 ' —1 o = 1 E.
an d F.Project Description G.Structure ID a a z a H s a a
00 3 WA-02927 05 P T CE No
Federal Forest Road Improvements
USFS Roads
to
Maintenance improvements to access Federal Forest lands.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 30,000 30,000
S CN 2022 0 0 570,000 570,000
Totals 0 0 600,000 600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 5,000 5,000 5,000 5,000 10,000
CN 95,000 95,000 95,000 95,000 190,000
Totals 100,000 100,000 100,000 100,000 200,000
Report Date:October 19,2021 Page 8
TWashington iSt'tin.rts�orcnao�, Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3
Y a I.
O D a < c j 73
A.PIN/Project No. B.STIP ID 3 2 1° a''
o a
c Z C.Project Title D a c m m .. 73
c D.Road Name or Number m o. a o` n r m ,n
m0 c E.Begin&End Termini m xi 3 -+ O 1 c.
a,m • F.Project Description G.Structure ID a ,'. ? m mcia
m 2.
00 4 WA-14046 04 P T W CE Yes
FEMA Repair Projects
Various
Countywide to Countywide
FEMA repair projects-facilities damaged by disaster events
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 FEMA 939,750 OTHER 156,625 156,625 1,253,000
S RW 2022 FEMA 45,000 OTHER 7,500 7,500 60,000
S CN 2022 FEMA 5,076,000 OTHER 846,000 846,000 6,768,000
Totals 6,060,750 1,010,125 1,010,125 8,081,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 503,000 150,000 150,000 150,000 300,000
RW 10,000 10,000 10,000 10,000 20,000
CN 2,568,000 840,000 840,000 840,000 1,680,000
Totals 3,081,000 1,000,000 1,000,000 1,000,000 2,000,000
Report Date:October 19,2021 Page 9
War". Washingtonrtment ot�,,,, ,t Six Year Transportation Improvement Program
on
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 0
7 v -
00
A.PIN/Project No. B.STIP ID 3 CO `5 .°i. 3
0c Z C.Project Title D m c 3 . m a A
n 2 c D.Road Name or Number o. o, 'o' F. r- = 2
m v E.Begin&End Termini - m ' 3 o C.
N m d, F.Project Description G.Structure ID 2 a 0�, o O.
s a
00 5 WA-02726 06 P T W CE Yes
Countywide 3R Program
Various Roads
to
Countywide preservation activities including:CTB,thin lifts of HMA,BST,pavement
markers,and shoulder rock on various roads.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 260,000 260,000
S RW 2022 0 0 15,000 15,000
S CN 2022 0 CRAB 2,620,212 2,729,788 5,350,000
Totals 0 2,620,212 3,004,788 5,625,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 60,000 40,000 40,000 40,000 40,000
RW 5,000 2,000 2,000 2,000 2,000
•
CN 2,600,000 550,000 550,000 550,000 550,000
Totals 2,665,000 592,000 592,000 592,000 592,000
Report Date:October 19,2021 Page 10
Washington�of,;,�, ,,ion Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 '<
v v -
A a 0
.n o A.PIN/Project No. B.STIP ID 3 c m a o 3
ZC.Project Title y a ca d 73
n a. c D.Road Name or Number a 0. o. o - C1 r F.
d c E.Begin&End Termini v 3 ' o i E.
H d F.Project Description G.Structure ID 0 o. o a w T a a
00 6 WA-10775 28 P T CE Yes
Countywide Paths&Trails
Various Locations
to
Construction and preservation of paths&trails at various locations.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 20,000 20,000
S RW 2022 0 0 15,000 15,000
S CN 2022 0 0 90,000 90,000
Totals 0 0 125,000 125,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 5,000 3,000 3,000 3,000 6,000
RW 5,000 2,000 2,000 2,000 4,000
CN 15,000 15,000 15,000 15,000 30,000
Totals 25,000 20,000 20,000 20,000 40,000
Report Date:October 19,2021 Page 11
T���" Washington State Six Year Transportation Improvement Program
��/ Department of flansportation
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
v
3 '_
A o
,, a A.PIN/Project No. B.STIP ID D c .°i a g
Z C.Project Title D a a a a x
2 c D.Road Name or Number a o. o. c r = .0
mc E.Begin&End Termini 13 3an -i o .
H m F.Project Description G.Structure ID a o a a s m a
00 6 WA-10776 28 P T W CE Yes
Countywide Paths&Trails-Swofford Pedestrian Improvements
Swofford Rd&Green Mt.Rd
to
Construction of bike and pedestrian facilities.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 10,000 10,000
S RW 2022 0 0 10,000 10,000
S CN 2022 0 0 110,000 110,000
Totals 0 0 130,000 130,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 10,000 0 0 0 0
RW 10,000 0 0 0 0
CN 110,000 0 0 0 0
Totals 130,000 0 0 0 0
Report Date:October 19,2021 Page 12
T�� Washington State Six Year Trans ion Im rovement Pro ram
vI/ Department of Transportation p p g
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 '<_
z o o
m o A.PIN/Project No. B.STIP ID 3 o 'zt_ o W
c C.Project Title m m n F. xt
a c D.Road Name or Number A c a o F. n r '_ a
d E.Begin&End Termini `: -o 3 o —1' o a 1 c
o- m z .c o.
m m F.Project Description G.Structure ID m o. - o m m s o.
00 7 WA-10777 06 P T W Yes
Countywide Emergent Construction Projects
Various Roads
to
Design and construction of emergent construction projects,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 300,000 300,000
S RW 2022 0 0 60,000 60,000
S CN 2022 0 0 1,440,000 1,440,000
Totals 0 0 1,800,000 1,800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 50,000 50,000 50,000 50,000 100,000
RW 10,000 10,000 10,000 10,000 20,000
CN 240,000, 240,000 240,000 240,000 480,000
Totals 300,000 300,000 300,000 300,000 600,000
Report Date:October 19,2021 Page 13
T «t TM ,« Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
o '<
3 'o
g.
a < C 1 o A
A.PIN/Project No. B.STIP ID 3 0 3 = 3
Z C.Project Title y m cy m d xi
t7 c D.Road Name or Number c •'c, o' a 0 r B. 2
o. E.Begin&End Termini ' 3 ' 1 0 1 E.
a F.Project Description G.Structure ID 2 c 0
a o a 2
5 a a
00 8 WA-02925 21 P T W CE Yes
Countywide Misc.Safety&Guardrail
Various Roads
to
Perform various safety projects as needed and install guardrail at necessary
locations.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 270,000 270,000
S RW 2022 0 0 30,000 30,000
S CN 2022 0 0 1,500,000 1,500,000
Totals 0 0 1,800,000 1,800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 45,000 45,000 45,000 45,000 90,000
RW 5,000 5,000 5,000 5,000 10,000
CN 250,000 250,000 250,000 250,000 500,000
Totals 300,000 300,000 300,000 300,000 600,000
Report Date:October 19,2021 Page 14
T Washington
Late ot Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 '<
iS zY. '0 0
A.PIN/Project No. B.STIP ID T.
a < c o m
Z C.Project Title D a c a 2 d
c D.Road Name or Number o. n o .'. n p1 2
m c E.Begin&End Termini °+ a A Z ,� a �o ,� c•
m F.Project Description G.Structure ID a a P a a g a o.
06 9 WA-14047 04 0.020 CE No
Shorey Road Bank Stabilization
40098-Shorey Rd
0.598 to 0.618
Permanent restoration-Bank stabilization will include a combination of a continuous
bank roughening Large Woody Material(LWM)jams and LWM barbs.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 ER 545,143 0 85,080 630,223
S RW 2022 ER 8,650 0 1,350 10,000
S CN 2022 ER 1,595,732 0 249,045 1,844,777
Totals 2,149,525 0 335,475 2,485,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
•
PE 630,223 0 0 0 0
RW 10,000 0 0 0 0
CN 1,844,777 0 0 0 0
Totals 2,485,000 0 0 0 0
Report Date:October 19,2021 Page 15
i7 Washington State Six Year Trans ortation Improvement Pro ram
A; Department of Transportation p p J
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
1' v
0
T A.PIN/Project No. B.STIP ID 3 o < a c 3
Z C.Project Title y a c a m A
n 0 c D.Road Name or Number o 'o o r m a
o 3 E.Begin&End Termini v 3 ' 1 0 —I E.
Fri m m F.Project Description G.Structure ID m' a » o a a s a a
05 10 /H210(008) WA-06389 03 C P T W 1.250 CE Yes
Centralia Alpha Road Improvements
94001-Centralia Alpha Rd
10.600 to 11.85
Slope stabilization,intersection improvements,roadway widening,resurfacing with
hot mix asphalt,guardrail,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 STP(R) 43,250 0 6,750 50,000
S RW 2022 0 0 50,000 50,000
S CN 2022 STP(R) 1,490,650 CRAB 1,839,000 1,170,350 4,500,000
Totals 1,533,900 1,839,000 1,227,100 4,600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 50,000 0 0 0 0
RW 50,000 0 0 0 0
CN 4,300,000 200,000 0 0 0
Totals 4,400,000 200,000 0 0 0
Report Date:October 19,2021 Page 16
A. Washington State Six Year Transportation Improvement Program
A. Department et Transportation
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
v
o
c A.PIN/Project No. B.STIP ID 3 0 1D 0 3e
c = C.Project Title c 3 B
r�o c D.Road Name or Number m c a o r- m
y o a. E.Begin&End Termini v 3 = 1 0 —I E.
H m F.Project Description G.Structure ID ,o o. � o m a s m o.
00 11 WA-14048 21 C P T W Yes
2021 County Safety Program
Various Roads
Countywide to Countywide
Upgrade signs,improve clear zone,flatten slopes,add/upgrade barriers,widen
shoulders,remove/modify fixed objects,and reduce pavement edge drop-offs.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 HSIP 98,000 0 0 98,000
S CN 2023 HSIP 809,000 0 0 809,000
Totals 907,000 0 0 907,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 98,000 0 0 0 0
CN 0 809,000 0 0 0
Totals 98,000 809,000 0 0 0
Report Date:October 19,2021 Page 17
WIWashington State Six Year Transportation Improvement Program
. Department of Transportation p p g
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SVVW RTPO N Inside Y Outside
m
v v S.
A.PIN/Project No. B.STIP ID 3 0 3 ;Im
a =a C.Project Title X. w c m ,. Ela A
c D.Road Name or Number c n o a r� r n a
n- . E.Begin&End Termini v n a ,� oa 0 ,� E.
z m
m e e. F.Project Description G.Structure ID ro a P ,' a 5 _ a a.
•
05 12 WA-14049 14 0.090 CE Yes
Skate Creek North Bridge Scour
79908-Skate Creek Rd N
0.91 to 1.00
Bridge and road scour protection,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 WFL 285,450, 0 44,550 330,000
S RW 2024 WFL 8,650 0 1,350 10,000
S CN 2025 WFL 2,693,760 0 420,413 3,114,173
Totals 2,987,860 0 466,313 3,454,173
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 100,000 200,000 30,000 0 0
RW 0 0 10,000 0 0
CN 0 0 0 3,114,173 0
Totals 100,000 200,000 40,000 3,114,173 0
Report Date:October 19,2021 Page 18
411111.
Washington
shi onSent Trion
Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 '<
, I.'o
m A.PIN/Project No. B.STIP ID 3 0 < . o a
c Z C.Project Title D m m ,g 6 p x
c D.Road Name or Number m c a 0 F. r1 107.
° 2
m g cr E.Begin&End Termini a z ,< a ,� S.
m m F.Project Description G.Structure ID 0 a P m a g a a
04 13 WA-13259 03 C G P S T 2.150 CE Yes
W
Harrison Avenue Improvements
91000-Harrison Avenue
0.570 to 2.717
Improvements including:widening of the roadway,sidewalks,street lights,storm
water,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 STP(US) 865,000 0 135,000 1,000,000
Totals 865,000 0 135,000 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 250,000 250,000 250,000 250,000 0
Totals 250,000 250,000 250,000 250,000 0
Report Date:October 19,2021 Page 19
°'� , sat Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m I
3 3
v a -
xi 0 0
c A.PIN/Project No. B.STIP ID 3 0 3 o a
• Z C.Project Title = X. � m = 7
• c D.Road Name or Number a o. o. o n B.
m- c E.Begin&End Termini m vo Z •- 0 c-
m m F.Project Description G.Structure ID m . P m m s 3 a
09 14 CRP-2155 03 CPT 0.310 CE Yes
Wigley Road Improvements
17912-Wigley Rd
0.720 to 1.033
Improve by grading,preleveling with HMA,horizontal and vertical alignments will be
improved,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 10,000 10,000
S RW 2022 0 0 5,000 5,000
S CN 2023 0 0 300,000 300,000
Totals 0 0 315,000 315,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 5,000 5,000 0 0 0
RW 5,000 0 0 0 0
CN 0 300,000 0 0 0
Totals 10,000 305,000 0 0 0
Report Date:October 19,2021 Page 20
T Washington State .t Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3
a I.
A a 'o
A.PIN/Project No. B.STIP ID 3 c A c o il f
Z C.Project Title = y a c m m z
c D.Road Name or Number a a a o a r R. 2
m o. E.Begin&End Termini m xi S z ,� ° co .Z 5.
,n m F F.Project Description G.Structure ID m c. P m y g o a
08 15 CRP-2137 03 P T 1.780 CE Yes
Swofford Road Rehabilitation
62850-Swofford Rd
0.000 to 1.777
Improve by grading,preleveling with asphalt class A,horizontal and vertical
alignments will be improved,intersection realignment,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 20,000 20,000
S RW 2022 0 0 5,000 5,000
S CN 2024 0 0 750,000 750,000
Totals 0 0 775,000 775,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 10,000 10,000 0 0 0
RW 5,000 0 0 0 0
CN 0 0 750,000 0 0
Totals 15,000 10,000 750,000 0 0
Report Date:October 19,2021 Page 21
Washington
nStateent ot Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 <
v v
z a 'o
r A.PIN/Project No. B.STIP ID D c m o
c Z C.Project Title D m S. m ,. d S A
0 c D.Road Name or Number oT o. c, S. rt V, E.
a
y e . E.Begin&End Termini v 3 ' 1 0 C E.
m m ; F.Project Description ' a o a°G.Structure ID a s 5D S.
16 16 CRP-2153 03 C G P S T 0.560 CE Yes
W
Rush Road Improvements
94006-Rush Rd
2.600 to 3.164
Major widening,possible curb and gutter,sidewalks,base stabilization,HMA,and
other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 130,000 130,000
P RW 2023 0 0 150,000 150,000
P CN 2024 0 0 2,400,000 2.400,000
Totals 0 0 2,680,000 2,680,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 5,000 75,000 50,000 0 0
RW 0 100,000 50,000 0 0
CN 0 0 2,400,000 0 0
Totals 5,000 175,000 2,500,000 0 0
Report Date:October 19,2021 Page 22
Washington State
.t Six Year Transportation Improvement Program 7i Department
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 '<
-0 -
m -- A.PIN/Project No. B.STIP ID D o 0 3
c z C.Project Title D a •cy m
2,^. c D.Road Name or Number m c n B. F. r " a
m c E.Begin&End Termini m v 2 Z ,� oa ,a � E.
an d LI F.Project Description G.Structure ID m' a F. o m m g m n
09 17 CRP-2151 06 CPT 1.140 CE Yes
Boyd Road Rehabilitation
61451-Boyd Rd
0.000 to 1.140
Vertical and horizontal improvements,base stabilization,BST,and other related
work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 80,000 80,000
P RW 2024 0 0 50,000 50,000
P CN 2024 0 0 350,000 350,000
Totals 0 0 480,000 480,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th$6th
PE 10,000 10,000 60,000 0 0
RW 0 0 50,000 0 0
CN 0 0 350,000 0 0
Totals 10,000 10,000 460,000 0 0
Report Date:October 19,2021 Page 23
ANL
o'� at. Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
3 '<
•0 .0 —
a A O C A
A.PIN/Project No. B.STIP ID 3 a 3 o W f
a Z C.Project Title D o c d F X
c D.Road Name or Number a a a o F. n r F. 2
mc E.Begin 8 End Termini �' v m a z ,ic a so ,-c E.
m F.Project Description G.Structure ID 0 a R. o m H g m a
09 18 CRP-2152 06 CPT 1.410 CE Yes
Isbell Road Rehabilitation
61450-Isbell Rd
0.000 to 1.410
Vertical and horizontal improvements,base stabilization,BST,and other related
work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 80,000 80,000
P RW 2024 0 0 50,000 50,000
P CN 2024 0 0 350,000 350,000
Totals 0 0 480,000 480,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 10,000 10,000 60,000 0 0
RW 0 0 50,000 0 0
CN 0 0 350,000 0 0
Totals 10,000 10,000 460,000 0 0
Report Date:October 19,2021 Page 24
7Washington t tat. Six Year Transportation Improvement Program
Transportation
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
v a
A 0 0
• A.PIN/Project No. B.STIP ID 3 0 3 5 o m
Z C.Project Title D m c ,� ,Z i A
n c D.Road Name or Number m o. n o c� r F. a
a
m cr
. E.Begin&End Termini ,' v Z ,� a ,c S.
m m • F.Project Description G.Structure ID m . o m a o,
00 19 WA-07344 15 CE No
North County Industrial Access
N/A to N/A
Finalize regional design efforts for a direct industrial ingress/egress arterial two-lane,
two-way truck route from Interstate 5 to North Lewis County industrial properties.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 30,000 30,000
P PE 2025 0 OTHER 1,000,000 0 1,000,000
P RW 2025 0 OTHER 1,000,000 0 1,000,000
P CN 2025 0 OTHER 18,000,000 0 18,000,000
Totals 0 20,000,000 30,000 20,030,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 20,000 5,000 5,000 1,000,000 0
RW 0 0 0 1,000,000 0
CN 0 0 0 3,000,000 15,000,000
Totals 20,000 5,000 5,000 5,000,000 15,000,000
Report Date:October 19,2021 Page 25
T" Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 <<_
v
A o
A.PIN/Project No. B.STIP ID 3 a 3 o
Z C.Project Title D m E. m m A
c D.Road Name or Number 0 a o, o 2. 0 r- n
d o c E.Begin&End Termini v° 3 ' 1 0 1 c
g.a m F.Project Description G.Structure ID o ID�, o a s o.
a
07 20 WA-14050 08 C P T W CE Yes
Westside Connector
To be determined to To be determined
New bridge and roadways to provide a westside connection over the Chehalis River
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2022 0 0 10,000 10,000
P PE 2023 Discretionary 432,500 0 67,500 500,000
P RW 2024 Discretionary 216,250 0 33,750 250,000
P CN 2026 Discretionary 3,667,600 0 572,400 4,240,000
Totals 4,316,350 0 683,650 5,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 10,000 50,000 200,000 200,000 50,000
RW 0 0 100,000 100,000 50,000
CN 0 0 0 0 4,240,000
Totals 10,000 50,000 300,000 300,000 4,340,000
Report Date:October 19,2021 Page 26
TWashingtonent ot to Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3
v v
A ° 'o
.n o A.PIN/Project No. B.STIP ID D c o
c Z C.Project Title D E. 3 d a A
c D.Road Name or Number m o a o a t7 r d a
m c E.Begin&End Termini m ' 3 -i o a 1 c.
0 B. 9, F.Project Description G.Structure ID �o o, o a a s a a
07 21 /2021(056) WA-10885 10 0.010 DCE No
Townsend Bridge#223 Replacement
65605-Townsend Rd
0.22 to N/A
Bridge replacement. 08294200
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2022 STP(BR) 1,000 0 0 1,000
Totals 1,000 0 0 1,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 1,000 0 0 0 0
Totals 1,000 0 0 0 0
Report Date:October 19,2021 Page 27
T Department State Six Year Transportation Improvement Program
Wanspartation
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 '<
z ° oa A
r A.PIN/Project No. B.STIP ID D o A o
zC.Project Title y 3 c a d 5 A
n c D.Road Name or Number m °. a o a n r " a
0_,
m c E.Begin&End Termini m ' Z ,� n ro ,� E.
v,m , F.Project Description G.Structure ID 0 a o a m a a a
00 22 /000S(553) WA-12552 21 C P T W CE Yes
2019 County Safety Program-Phase II
Various Roads
Countywide to Countywide
Upgrade signs,improve clear zone,flatten slopes,add/upgrade barriers,widen
shoulders,remove/modify fixed objects,and reduce pavement edge drop-offs.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2022 HSIP 2,000 0 0 2,000
Totals 2,000 0 0 2,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 2,000 0 0 0 0
Totals 2,000 0 0 0 0
Report Date:October 19,2021 Page 28
Milk
Washington
, n Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPOIRTPO: SWW RTPO N Inside Y Outside
m
v27 xi
c 0o
m A.PINIProject No. B.STIP ID 3 a ET CD 7 xi
`° o 2
zC.Project Title D m a = F. A
0. c D.Road Name or Number m o 00. I o F. 0 p1 2
d o c E.Begin&End Termini v0 z n 5.
H m F.Project Description G.Structure ID o o m g m o
04 23 WA-13256 03 C P S T W 0.890 CE Yes
Reynolds Road Improvements
91011-Reynolds Avenue
0.099 to 0.993
Improvements include widening of the roadway,sidewalks,street lights,storm water,
and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 TIB 75,000 25,000 100,000
P RW 2026 0 TIB 75,000 25,000 100,000
P CN 2027 0 TIB 1,500,000 500,000 2,000,000
Totals 0 1,650,000 550,000 2,200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 100,000
RW 0 0 0 0 100,000
CN 0 0 0 0 2,000,000
Totals 0 0 0 0 2,200,000
Report Date:October 19,2021 Page 29
�sof, tn Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
v `
z o' 00
-n - A.PIN/Project No. B.STIP ID 3 a
c c_ 0 3
C.Project Title m c
E. c D.Road Name or Number a a o a o R. n r m 2
m . E.Begin&End Termini -0 3 1 0 1 c.
H m z e a c
m w F.Project Description G.Structure ID o P a �, a
07 24 WA-02952 03 C G P T 2.610 CE Yes
Avery Road West Improvements
30081-Avery Rd W
0.090 to 2.700
Base stabilization and roadway widening for anticipated industrial commercial traffic,
and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2024 STP(R) 164,000 0 26,000 190,000
P RW 2024 STP(R) 21,000 0 4,000 25,000
P CN 2025 STP(R) 433,000 0 67,000 500,000
Totals 618,000 0 97,000 715,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 180,000 10,000 0
RW 0 0 20,000 5,000 0
CN 0 0 0 500,000 0
Totals 0 0 200,000 515,000 0
Report Date:October 19,2021 Page 30
Departmentsport Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 a
Y. o —
zo ao
m o A.PIN/Project No. B.STIP ID a xi
D c C a
c z C.Project Title D m c� e E. a A
9 c D.Road Name or Number a a a o F. n m ,n
mv E.Begin&End Termini d v° a ,x ct E.
m m F.Project Description G.Structure ID co E. a . a m g a
05 25 WA-029541 03 C P T 5.550 CE No
Tucker Road Improvements
95003-Tucker Rd
0.000 to 5.549
Improvements include widening to current standards,create shoulders,remove
obstacles from the clear-zone,ditches,storm water,paved surfacing,and other
related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2024 0 CRAB 257,000 28,000 285,000
P RW 2024 0. CRAB 257,000 28,000 285,000
P CN 2025 0 CRAB 2,051,000 229,000 2,280,000
Totals 0 2,565,000 285,000 2,850,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 100,000 185,000 0
RW 0 0 100,000 185,000 0
CN 0 0 0 2,280,000 0
Totals 0 0 200,000 2,650,000 0
Report Date:October 19,2021 Page 31
Washington
Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
3 S.
a 0
A 'o 0
T o A.PIN/Project No. B.STIP ID D o �° o e
c z C.Project Title D m c A ,7 = , A
c D.Road Name or Number m 0. a o »- r� r m .2
m c E.Begin&End Termini ,' v 3 0 -I o S.
F. B. F.Project Description G.Structure ID c. R. o m a g 0 a
07 26 WA-02955 03 C P T 0.040 CE No
Avery Road West/North Military Road Intersection
30081-Avery Rd W&30062-N Military Rd
0.430 to 0.470
Intersection improvements and signalization,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 0 20,000 20,000
P CN 2026 0 0 50,000 50,000
Totals 0 0 70,000 70,0004
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 20,000 0
CN 0 0 0 0 50,000
Totals 0 0 0 20,000 50,000
Report Date:October 19,2021 Page 32
Washing411111.
unstaent of }.�ts ,��t, Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
- m
„ '0zrt, o 0
m O xi
o A.PIN/Project No. B.STIP ID 3 o g 5. o a f
zC.Project Title D m m 4 Ti E. A
0 c D.Road Name or Number A a a o a C) r E. a
m c E.Begin&End Termini v° 3 ' 1 0 y E.
COz
y m F.Project Description G.Structure ID 2 at 2. 9 i : 5 0 a
07 27 WA-05043 03 C G P S T 3.320 CE Yes
W
SR 505 Corridor Improvements.
SR 505 Mainline
2.180 to 5.500
Corridor improvements including truck climbing lane,intersection improvements,
traffic signals,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 OTHER 511,000 511,000 1,022,000
P RW 2027 0 OTHER 37,500 37,500 75,000
P CN 2026 0 OTHER 895,500 895,500 1,791,000
Totals 0 1,444,000 1,444,000 2,888,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 225,000 797,000
RW 0 0 0 0 75,000
CN 0 0 0 0 1,791,000
Totals 0 0 0 225,000 2,663,000
Report Date:October 19,2021 Page 33
Tonent ``,�t> ,,�, Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
m
2
v -0 '<
-
z 'o oo
r ' A.PIN/Project No. B.STIP ID D c o
c C.Project Title D a a ,Z d a ,�
c D.Road Name or Number a °. a o - 117
m 2
mo c E.Begin&End Termini a v a a ,< 5.
H m F.Project Description G.Structure ID na c. o a N a- a o,
09 27 WA-02993 04 C P T 0.290 CE No
Teitzel Road Bridge Approach Repair
17381-Teitzel Rd
0.700 to 0.990
Reconstruct bridge approaches and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 0 30,000 30,000
P CN 2026 0 0 170,000 170,000
Totals 0 0 200,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th 8 6th
PE 0 0 0 0 30,000
CN 0 0 0 0 170,000
Totals 0 0 0 0 200,000
Report Date:October 19,2021 Page 34
7t�on� Six Year Transportation Improvement Program
ransportation
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
I m
3 -'
•v v -
A ET
o' 'o
c A.PINIProject No. B.STIP ID 3 c 3 c o a f
C.Project Title D a c E. A
° c D.Road Name or Number c o o. 0 ' n r DC
n_.
m c E.Begin&End Termini -a 3 Z a ,� E.
N d F.Project Description G.Structure ID mo a o a a S a a
19 28 WA-02994 01 C G P S T 0.970 CE Yes
W
Gallagher Road Extension
11004-Gallagher Rd
0.000 to 0.970
Construct new urban roadway to Harrison Ave.,curb,gutter,sidewalks,illumination,
and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 Discretionary 50,000 OTHER 50,000 0 100,000
P RW 2026 Discretionary 15,000 OTHER 15,000 0 30,000
P CN 2026 Discretionary 485,000 OTHER 485,000 0 970,000
Totals 550,000 550,000 0 1,100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 100,000
RW 0 0 0 0 30,000
CN 0 0 0 0 970,000
Totals 0 0 0 0 1,100,000
Report Date:October 19,2021 Page 35
WashingtonIli
State Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N inside Y Outside
m
I, ,00
A 0 0
m o A.PIN/Project No. B.STIP ID 3 o �° E.'
a
a z C.Project Title D m c E A
c D.Road Name or Number m c o, iS F. n r n a
m 2 c E.Begin&End Termini m v 3 a 1 0 1D 1 E.w Iv 31 F.Project Description G.Structure ID m 0. a 2 m O.
s a o.
19 29 WA-02998 01 C G P S T 0.380 CE Yes
W
Downie Road Extension
40150-Downie Rd
0.000 to
Construct new urban road to Maurin Rd.,base stabilization,HMA,and other related
work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 Discretionary 50,000 OTHER 50,000 0 100,000
P RW 2026 Discretionary 10,000 OTHER 10,000 0 20,000
P CN 2026 Discretionary 540,000 OTHER 540,000 0 1,080,000
Totals 600,000 600,000 0 1,200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 100,000
RW 0 0 0 0 20,000
CN 0 0 0 0 1,080,000
Totals 0 0 0 0 1,200,000
Report Date:October 19,2021 Page 36
',ngton,t °`,n,�tsportn�r, Six Year Transportation Improvement Program
From 2022 to 2027
Agency: Lewis Co.
County: Lewis
MPO/RTPO: SWW RTPO N Inside Y Outside
3 Tiv 0
° a < c 1 ' A
T A.PIN/Project No. B.STIP ID 3 a 0 _. o a
= C.Project Title D A c a3 3 y
a D.Road Name or Number a a a o — n r - .0
o . E.Begin&End Termini v 3 1 0 a 1 c.
m
m m F.Project Description G.Structure ID c o, o a a 0- a o.
07 30 WA-03004 04 C P T 0.800 CE Yes
Highway 603(4)Rehabilitation
93006-Hwy 603
10.900 to 11.700
Improve horizontal alignment,widen and reconstruct roadway base,overlay with
HMA,and other related work.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 CRAB 108,000 12,000 120,000
P RW 2026 0 0 40,000 40,000
P CN 2027 0 CRAB 892,000 59,000 951,000
Totals 0 1,000,000 111,000 1,111,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 120,000
RW 0 0 0 0 40,000
CN 0 0 0 0 951,000
Totals 0 0 0 0 1,111,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Lewis Co 22,347,485 34,803,958 19,576,715 76,728,158
Report Date:October 19,2021 Page 37
BOCC AGENDA ITEM SUMMARY
Resolution: 21-384 BOCC Meeting Date: Nov. 9, 2021
Suggested Wording for Agenda Item: Agenda Type: Legal Notice
Notice of Public Hearing for the proposed 2022 Annual Construction Program (ACP) and Six-Year
Transportation Improvement Program (TIP) for the years 2022-2027
Contact: Josh Metcalf Phone: 2762
Department: PW - Public Works
Description:
This resolution is to give notice of a public hearing on November 23, 2021 for adoption of the
2022-2027 Six Year Transportation Improvement Program (TIP) and 2022 Annual Construction
Program (ACP).
Approvals: Publication Requirements:
Publications:
User Status The Chronicle - Thursday November 11th &
Thursday November 18th
PA's Office Pending
Additional Copies: Cover Letter To:
Tim Fife - PW
Geoff Soderquist - PW
Robin Saline - PW