Adopt 2022-2027 Six-Year Transportation Improvement Program (TIP)/2022 Annual Construction Program (ACP) BEFORE THE BOARD OF COUNTY COMMISSIONERS LEWIS COUNTY, WASHINGTON IN THE MATTER OF: RESOLUTION NO. 21-412 ADOPT THE 2022-2027 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2022 ANNUAL CONSTRUCTION PROGRAM (ACP) WHEREAS, RCW 36.81.121 requires the legislative authority of each county prepare and adopt a Transportation Improvement Program (TIP) that includes proposed road and bridge construction work for the ensuing six calendar years; and WHEREAS, WAC 136-16 requires the legislative authority of each county prepare and adopt an Annual Construction Program (ACP) that includes proposed road and bridge construction work for the ensuing calendar year prior to the County's budget adoption each year; and WHEREAS, the 2022-2027 Six Year TIP and 2022 ACP were prepared at the direction of the Lewis County Board of County Commissioners (BOCC), and a public hearing was held November 23, 2021. NOW THEREFORE BE IT RESOLVED the BOCC hereby certifies that a priority array of potential projects on the County's arterial system and a résumé of bridge inspection findings were prepared by the County Engineer and were available to the BOCC during the preparation of this program, and that the 2022-2027 Six Year TIP and 2022 ACP are hereby adopted. DONE IN OPEN SESSION this 23rd day of November, 2021. Page 1 of 2 Res. 21-412 APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON Amber Smith Lindsey R. Pollock, DVM By: Amber Smith, Lindsey R. Pollock, DVM, Chair Deputy Prosecuting Attorney ATTEST: •'c°"-"-T`-"9s•• Sean D. Swope •` ° e wan D. Swope, Vice Chair CE $q5 x, •gin'sib `o," • •Rieva Lester '4 ' `-°" s;:� F. Lee Grose •'tip;:::; s: Rieva Lester, F. Lee Grose, Commissioner Clerk of the Lewis County Board of County Commissioners Page 2 of 2 Res. 21-412 ANNUAL CONSTRUCTION PROGRAM FOR 2022 TOTAL$'S AGENCY ACTION: COUNTY» LEWIS (A)TOTAL CONSTRUCTION PROGRAM-columns(14)«(15) $12,812,712 DATE RECOMMENDED PROG.SUBMITTED 09/27/2021 (B)PUBLISHED COUNTY FORCES LIMIT $1,279,143 _ DATE OF ENVIRONMENTAL ASSESSMENT (C)TOTAL COUNTY FORCES CONST PROGRAM-column(15) __ S885,000 DATE OF FINAL ADOPTION 11/23/2021 ORDINANCE/RESOLUTION NO. Line (C) must be smaller than Line (B) - DATE OF AMENDMENT (1) (2) I (3) I (4) I (5) I (6)-I (7) I (8) (9) I (10) I (11) (12) I (13) I (14) I (15) I (16) (17) w cii= 'F SOURCES OF FUNDS ESTIMATED EXPENDITURES m 1 0p ROAD/PROJECT NAME w z z w 0 Z ROAD I AND LOCATION O w O y¢I w w N COUNTY OTHER FUNDS PRELIM.& RIGHT CONSTRUCTION Z >d w' LOG a U J I a. 'O w FUNDS CONST. OF GRAND COMMISSIONER w o- NO. (Include brief termini description ILL a"~ 5 co AMOUNT PROGRAM ENGRING WAY COUNTY TOTAL DISTRICT ¢ or MP's;Bridge#) (Miles) w< SOURCE 595.10 595.20 CONTRACT FORCES ALL 595. I $1.279.140 Non-Capital Improvement Projects • 01! 1 - 1Countywide Bridge/Road Bank Protection (Various Roads) - - FA,OTH 100,0001 25,000I'1 75,000 100,000 All 02 1 64000 Stowell Road Bridge Scour(MP 0.57) - ! 09 FA,OTH 1 1 1,0001 STP(BR) 1 1,000 1,000 3 • 03 1 124017 jKing Road Bridge Scour(MP 12.26) j - 09 FA,OTH 25,488 163,3151 STP(BR) 188,803 188,803 2 04 I 1 130501 Sargent Road Bridge Scour(MP 1.33) - 1 09 ! FA,OTH 1 28,6541 183,6001 STP(BR) 212,2541 212,254 2 051 2 - 'Countywide Culvert Replacement(Various Roads) - ' - ' DR 35,000! 30,0001 5,000 35,000 All 06 2 94001 !Centralia Alpha Road Culvert Replacement(MP 15.79) - 07 DR,FP 710,935 FBRB 710,935 710,935 3 07 3 1 - 1FederalForest Road Improvements - 11 - 3R,OTH 100,000: 5,000 95,000 100,000 3 08 4 1 - I FEMA Repair Projects(Various Roads) - - • i 09 4 I 78270 !Carr Road Slide(MP 0.26-0.28) ' 0.02 • 07 OTH 67,500! 472,500' FEMA,DEM 540,000 540,000 3 10 I 4 17190 :Jones Road Culvert(MP 1.71) - 09 DR ! 12,5001 87,500, FEMA,DEM 100,0001 100,000 1 11 4 64022 :Pigeon Springs Road Slide(MP 2.30) - 09 OTH 45,37511 317,625, FEMA,DEM 353,0001 10,000 363,000 3 12 4 63005 Crumb Road Culvert&Road Repair(MP 0.17) - ' 09 OTH 159,750i 1,118,250 FEMA,DEM 'I.• 1,278,000 1,278,000 3 13 4 175992 Kiona Road Hydraulic Study(MP 0.35) • - 09 OTH 1'1 6,250 43,750 FEMA,DEM 50,000 50,000 3 ' 14 I 4 15051 Selzer Valley Road Slide(MP 5.35) - 09 OTH 93,750 656,2501 FEMA,DEM 750,000 750,000 1 15 ( Capital Improvement Projects I I • 161 5 - Countywide 3R Program(Various Roads) - - 3R 1 2,228,29811 436,702! CAPP 60,0001 5,000 1,900,000 700,000 2,665,000 All 17 6 - Countywide Paths&Trails - - P&T 25,000: P&T 5,000! 5,000 5,000 10,000 25,000 All 181 6 162851 Swofford Pedestrian Improvements(Green Mt.Road MP 0.000-1.500) 1.50 09 P&T 130,0001 P&T 10,0001! 10,000 110,000 130,000 3 19 I 7 - Countywide Emergent Construction Projects(Various Roads) - - RC,3R ' 300,000! 50,000 10,000 225,000 15,000 300,000 All 20 8 - Countywide Misc.Safety&Guardrail(Various Roads) III - - SAFETY 300,0001 45,000 5,000 200,000 50,000 300,000 All 1 21 9 1 40098 I Shorey Road Bank Stabilization(MP 0.598-0.618) 0.02 18 OTH 1 335,475i 2,149,525, ER 630,2231I 10,000 1,844,777 2,485,000 2 I 22 10 : 94001 II Centralia Alpha Road Improvements(MP 10.60-11.85) 1.25 07 NA,RC 1,027,1001 3,372,9001 STP(R),RAP 50,0001 50,000 4,300,000 4,400,000 3 23. 11 - 1,2021 County Safety Program - - SAFETY ' 98,000''1 HSIP 98,0001 98,000 All 24 12 79908 ;Skate Creek North Bridge Scour(MP0.91-1.00) 0.09 107 1 FA,OTH 13,500 86,5001 FLAP 100,000! 100,000 3 251 13 91000 [Harrison Avenue Improvements&Planning Study(MP 0.55-2.54) 1.99 16 RC OTH 33,750 216,2501 STP(U) 250,0001 250,000 1 i 26 I 14 17912 Wigley Road Improvements(MP 0.720-1.033) 0.31 09 3R 10,000 Other 5,000 5,000 10,000 1 271 15 162850 (Swofford Road Rehabilitation(MP 0.000-1.777) 1.78 08 NA,RC ' 15,0001 10,000 5,000 15,000 3 28 16 I'I 94006 Rush Road Improvements(MP 2.600-3.164) 0.56 16 1 3R 5,00011 Other 5,0001 5,000 2 29 1 17 161451 I Boyd Road Rehabilitation(MP 0.00-1.14) , 1.14 09 I 3R 10,0001 10,000 10,000 3 30 18 • 61450 1Isbell Road Rehabilitation(MP 0.000-1.41) 1.41 j 09 3R 10,000,I 10,000 10,000 3 31 19 - North County Industrial Access(To Be Determined) j - - NA 20,0001 20,000 20,000 1 • 32 20 1 - Westside Connector - - BR,NA I 10,000 10,000 10,000 1&2 33 21 65605 ',Townsend Bridge No.223 Replacement i 0.22 j - BR ', 1,0001 STP(BR) 1,000 1,000 3 34 I 22 - ,2019 County Safety Program - - 1 SAFETY : 2,0001 HSIP 2,000 2,000 All 36 w. Reconstructs. w. !I • • 371 1 ## Resurface,taw. PAT .Pains A Trails • I FA •r o.a ow 381 swa -a or w . .�M span »r B.. DR 139 iiit SAW I PAGE/PROGRAM TOTALS,CONSTRUCTION . 5,147,3901 10,117,6021 2,332,2801 120,000 11,927,712 885,000 15,264,992 Six Year Transportation Improvement Program, 2022 to 2027 2022 2023 2024 2025-2027 Project Priority Project BMP EMP PE ROW Constr PE ROW Constr PE ROW Constr PE ROW Constr Total Non-Capital Improvement Projects 1 Countywide Bridge/Road Bank Protection - - $426 $76 $25 $23 $75 $25 $1,463 $75 $75 $150 $2,413 (King Road,Sargent Road,&Countywide Program) 2 Countywide Culvert Replacement - - $30 $5 $711 $10 $10 $815 $30 $1,611 (Centralia Alpha Road&Countywide Program) 3 Federal Forest Road Improvements - - $5 $95 $5 $95 $5 $95 $15 $285 $600 4 FEMA Repair Projects - - $503 $10 $2,568 $150 $10 $840 $150 $10 $840 $450 $30 $2,520 $8,081 (Carr,Jones.Crumb,Kiona,Sa/zer Valley,&Pigeon Springs Roads) Capital Improvement Projects 5 Countywide 3R Program - - $60, $5 $2,600 $40 $2 $550 $40 $2 $550 $120 $6 $1,650 $5,625 6 Countywide Paths&Trails - - $15 $15 $125 $3 $2 $15 $3 $2 $15 $9 $6 $45 $255 7 Countywide Emergent Construction Projects - - $50 $10 $240 $50 $10 $240 $50 $10 $240 $150 $30 $720 $1,800 8 Countywide Misc.Safety&Guardrail - - $45 $5 $250 $45 $5 $250 $45 $5 $250 $135 $15 $750 $1,800 9 Shorey Road Bank Stabilization 0.598 0.618 $630 $10 $1,845 $2,485 10 Centralia Alpha Road Improvements 10.600 11.850 $50 $50 $4,300 $200 $4,600 11 2021 County Safety Program - - $98 $809 $907 12 Skate Creek North Bridge Scour 0.910 1.000 $100 $200 $30 $10 $3,114 $3,454 13 Harrison Avenue Improvements 0.548 2.544 $250 $250 $250 $250 $1,000 14 Wigley Road Improvements 0.720 1.033 $5 $5 $5 $300 $315 15 Swofford Road Rehabilitation 0.000 1.777 $10 $5 $10 $750 $775 16 Rush Road Improvements 2.600 3.164 $5 $75 $100 $50 $50 $2,400 $2,680 17 Boyd Road Rehabilitation 0.000 1.140 $10 $10 $60 $50 $350 $480 18 Isbell Road Rehabilitation 0.000 1.410 $10 $10 $60 $50 $350 $480 19 North County Industrial Access - - $20 $5 $5 $1,000 $1,000 $18,000 $20,030 20 Westside Connector - - $10 $50 $200 $100 $250 $150 $4,240 $5,000 21 Townsend Bridge#223 Replacement 0.220 - $1 $1 22 2019 County Safety Program - - $2 $2 23 Reynolds Avenue Improvements 0.099 0.993 $100 $100 $2,000 $2,200 24 Avery Road West Improvements 0.090 2.700 $180 $20 $10 $5 $500 $715 25 Tucker Road Widening 0.000 5.549 $100 $100 $185 $185 $2,280 $2,850 26 Avery Road West/North Military Road Intersection 0.430 0.470 $20 $50 $70 27 Teitzel Road Bridge Approach Repair 0.700 0.990 $30 $170 $200 28 Gallagher Road Extension 0.000 0.970 $100 $30 $970 $1,100 29 Downie Road Extension 0.000 - $100 $20 $1,080 $1,200 30 Highway 603(4)Rehabilitation 10.900 11.700 $120 $40 $951 $1,111 31 SR 505 Corridor Improvements 2.180 5.500 $1,022 $75 $1,791 $2,888 $0 Misc.Engineering,ROW,&Construction Costs $2,332 $120 $12,813_ $943 $152 $3,374 $1,263 $409 $8,118 $4,171 $1,767 $41,266 $76,728 Construction TOTAL $15,265 $4,469 $9,790 $47,204 $76,728 Estimated Budget Annual Balance I ($15,265) I ($4,469) I (59,790) I (j47,204) $76,728 County Forces Construction Limit $1,279 $1,279 $1,279 $3,837 Page 1 Six Year Transportation Improvement Program, 2022 to 2027 Lewis Co.Funds Funding Sources 86.5% 80% 86.5% 87.5% 75%of 100% 90% Matching 13.5% 20% 13.5% 12.5% Project 10% Other Other Total Priority Project BMP EMP Local Funds STP STP(BR) ER FEMA TIB CAPP RAP Fed/State Local Funding Non-Capital Improvement Projects 1 Countywide Bridge/Road Bank Protection - - $600 $57 $1,756 $2,413 (King Road,Sargent Road,&Countywide Program) 2 Countywide Culvert Replacement - - $85 $1,526 $1,611 (Centralia Alpha Road&Countywide Program) 3 Federal Forest Road Improvements - - $600 $600 4 FEMA Repair Projects - $0 $1,010 $6,061 $1,010 (Carr,Jones,Crumb,Kiona,Selzer Valley,&Pigeon Springs Roads) Capital Improvement Projects 5 Countywide 3R Program - - $3,005 $2,620 $5,625 6 Countywide Paths&Trails - - $255 $255 7 Countywide Emergent Construction Projects - - $1,800 $1,800 8 Countywide Misc.Safety&Guardrail - - $1,800 $1,800 9 Shorey Road Bank Stabilization 0.598 0.618 $0 $335 $2,150 $2,485 10 Centralia Alpha Road Improvements 10.600 11.850 $783 $444 $1,534 $1,839 $4,600 11 2021 County Safety Program - - $0 $907 $907 12 Skate Creek North Bridge Scour 0.910 1.000 $0 $466 $2,988 $3,454 13 Harrison Avenue Improvements 0.548 2.544 $0 $135 $865 $1,000 14 Wigley Road Improvements 0.720 1.033 $0 $315 $315 15 Swofford Road Rehabilitation 0.000 1.777 $775 $775 16 Rush Road Improvements 2.600 3.164 $0 $2,680 $2,680 17 Boyd Road Rehabilitation 0.000 1.140 $10 $470 $480 18 Isbell Road Rehabilitation 0.000 1.410 $10 $470 $480 19 North County Industrial Access - - $30 $20,000 $20,030 20 Westside Connector - - $10 $674 $4,316 $5,000 21 Townsend Bridge#223 Replacement 0.220 - $0 $1 $1 22 2019 County Safety Program - - $0 $2 $2 23 Reynolds Avenue Improvements 0.099 0.993 $0 $550 $1,650 $2,200 24 Avery Road West Improvements 0.090 2.700 $0 $97 $618 $715 25 Tucker Road Widening 0.000 5.549 $0 $285 $2,565 $2,850 26 Avery Road West/North Military Road Intersection 0.430 0.470 $50 $20 $70 27 Teitzel Road Bridge Approach Repair 0.700 0.990 $200 $200 28 Gallagher Road Extension 0.000 0.970 $0 $1,100 $1,100 29 Downie Road Extension 0.000 - $0 $1,200 $1,200 30 Highway 603(4)Rehabilitation 10.900 11.700 $0 $111 $1,000 $1,111 31 SR 505 Corridor Improvements 2.180 5.500 $722 $1,444 $722 $2,888 $0 $0 Misc.Engineering,ROW,&Construction Costs $10,735 I $4,164 $3,926 I $1,757 I $2,150 I $6,061 I $1,650 I $2,620 I $5,404I $33,584 I $4,677 I $68,647 Construction TOTAL Lewis Co.Funds $76,728 Estimated Budget Annual Balance Total- $14,899 County Forces Construction Limit Page 2 � , , n Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< 71 v o 4) 'o A.PIN/Project No. B.STIP ID 3 o a C —I 3 Z C.Project Title > m E. a ,g m a g3 .. c D.Road Name or Number a a a. o F. 0 r m a m c E.Begin&End Termini v° Z ,� a ,c S. m m F.Project Description G.Structure ID o �, o y 0 a 00 1 WA-02926 14 C P S T W CE No Countywide Bridge/Road Bank Protection Various Roads to Countywide bank protection on various roads and bridges Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 150,000 150,000 S CN 2022 0 0 450,000 450,000 Totals 0 0 600,000 600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 25,000 25,000 25,000 25,000 50,000 CN 75,000 75,000 75,000 75,000 150,000 Totals 100,000 100,000 100,000 100,000 200,000 Report Date:November 09,2021 Page 1 TaState of n Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside - m v 3 '<_ 0 0 ,1 A.PIN/Project No. B.STIP ID D o 1D o a f c z C.Project Title D A c e _ 0 n c D.Road Name or Number m c a o a n r = a m . E.Begin&End Termini m a 3 b -4 oCO 1 c. m m cr F.Project Description G.Structure ID o, o m 5 o 07 1 WA-13833 47 DCE Yes King MP 12.26 Bridge Scour 24017-King Rd 12.26 to N/A Bridge Scour-excavate,install scour countermeasures,replace abutment fill,and 08423800 return stream channel back to the center of the bridge span. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds 1 State Fund Code State Funds Local Funds Total Funds S PE 2022 STP(BR) 163,315 0 25,488 188,803 S RW 2023 STP(BR) 10,000 0 1,561 11,561 S CN 2024 STP(BR) 663,685 0 0 663,685 Totals 837,000 0 27,049 864,049 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 188,803 0 0 0 0 RW 0 11,561 0 0 0 CN 0 0 663,685 0 0 Totals 188,803 11,561 663,685 0 0 Report Date:November 09,2021 Page 2 WashingtonANIL v7; Department ot Transportation State Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m v0 o ° O a < C 3 aJ m A.PIN/Project No. B.STIP ID D a m = o f Z C.Project Title D A c _ ° p a o D.Road Name or Number m o. n o 2. r E. m= c E.Begin 8 End Termini ,' v Z ,� °o. ,� E. in d ! F.Project Description G.Structure ID 2 o, o a a 5 a o. 07 1 WA-13838 47 DCE Yes Sargent MP 1.33 Bridge Scour 30501-Sargent Rd 1.33 to N/A Bridge Scour-excavate,install scour countermeasures,and return stream channel 08173000 to original profile. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 STP(BR) 183,600 0 28,654 212,254 S RW 2023 STP(BR) 10,000 0 1,561 11,561 S CN 2024 STP(BR) 724,500 0 0 724,500 Totals 918,100 0 30,215 948,315 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 212,254 0 0 0 0 RW 0 11,561 0 0 0 CN 0 0 724,500 0 0 Totals 212,254 11,561 724,500 0 0 Report Date:November 09,2021 Page 3 Ilk Washington st n�,at. Six Year Transportation Improvement Program 7; Department of From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< 3 xi I. A.PIN/Project No. B.STIP ID D c m o Z C.Project Title D cCD tZ d o A 0 c D.Road Name or Number 0- 'o. o a r� r ft d g c E.Begin&End Termini m v0 3 ' 1 0 -1 E. m m F.Project Description G.Structure ID . & _ B. a m m 5 m 0. a 07 1 /2021(055) WA-10887 47 DCE No Stowell MP 0.57 Bridge Scour 64000-Stowell Rd 0.57 to N/A Scour Repair-scour has undermined approach and spread footings. This project is 08137600 to armor the abutment and spread footings. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 STP(BR) 1,000 0 0 1,000 Totals 1,000 0 0 1,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 1,000 0 0 0 0 Totals 1,000 0 0 0 0 Report Date:November 09,2021 Page 4 Washington State „�,�,t Six Year Transportation Improvement Program f. Department ion From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< • A.PIN/Project No. B.STIP ID 3 0 a o 2 c Z C.Project Title D o c . fta p c D.Road Name or Number m a a o tt r p, a do 3 E.Be Begin End Termini m -o 3 ' .1 0 0 1 c N 'm_ a, F.Project Description G.Structure ID ro o a z m s a 00 2 WA-04989 44 C P T Yes Countywide Culvert Replacement Various Roads to Remove and replace barrier culverts,provide stream enhancements for fish passage,and replacement of maintenance culverts. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 80,000 80,000 S RW 2022 0 0 5,000 5,000 Totals 0 0 85,000 85,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 30,000 10,000 10,000 10,000 20,000 RW 5,000 0 0 0 0 Totals 35,000 10,000 10,000 10,000 20,000 Report Date:November 09,2021 Page 5 Washington 11 as;atri,�„ �„ Six Year Transportation Improvement Program 7; Department portat From 2022 to 2027 Agency: Lewis Co. County: Lewis MPOIRTPO: SWW RTPO N Inside Y Outside m 3 v v - o Ei < c ' a A42' .PIN/Project No. B.STIP ID 3 o D .2.. o m Z C.Pt Title Y m = z rojec CI c D.Road Name or Number a n 'a o F. r m a d E.Begin 8 End Termini vo 3 1 0 1 E. LLi a F.Project Description G.Structure ID m' o. o m m - a 05 2 WA-13254 44 C P T 0.040 CE Yes Countywide Culvert Replacement-Centralia Alpha(MP 15.79) 94001-Centralia Alpha Rd 15.77 to 15.81 Title Category-County Culvert Replacement Replacement of maintenance culvert and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 0 OTHER 710,935 0 710,935 Totals 0 710,935 0 710,935 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 710,935 0 0 0 0 Totals 710,935 0 0 0 0 Report Date:November 09,2021 Page 6 ANS Washington ate Six Year Transportation Improvement Program 7-1 Department ol From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside 1 m v A a 'o A.PIN/Project No. B.STIP ID 3 o < Zii a cc Z C.Project Title y a a ,.Z d c D.Road Name or Number m 0. 0. o c� r F. . d v E.Begin 8 End Termini ,' v° 3 S 1 0 0 —1 E. an d F.Project Description G.Structure ID 0 o. c m m o. s CD o. 07 2 WA-13255 44 C P T 0.040 CE Yes Countywide Culvert Replacement-Kruger(MP 1.20) 46032-Kruger Rd 1.18 to 1.22 Title Category-County Culvert Replacement Replacement of maintenance culvert and other related work Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2024 0 OTHER 814,686 0 814,686 Totals 0 814,686 0 814,686 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 0 0 814,686 0 0 Totals 0 0 814,686 0 0 Report Date:November 09,2021 Page 7 Ilk Washington ate Six Year Transportation Improvement Program A/ Department of From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 a v a - a oo A.PIN/Project No. B.STIP ID 3 0 �° o 3 z C.Project Title D a c a 4 n a 23 0 c D.Road Name or Number m o o, o' . c) m 1D d 0 c E.Begin&End Termini m v 3 -1 0 0 -i c. y d F.Project Description G.Structure ID o a a o a a s ,co �, a 00 3 WA-02927 05 P T CE No Federal Forest Road Improvements USFS Roads to Maintenance improvements to access Federal Forest lands. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 30,000 30,000 S CN 2022 0 0 570,000 570,000 Totals 0 0 600,000 600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 5,000 5,000 5,000 10,000 CN 95,000 95,000 95,000 95,000 190,000 Totals 100,000 100,000 100,000 100,000 200,000 Report Date:November 09,2021 Page 8 TWashingtonentStat Transportation Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 v a - 00 A.PIN/Project No. B.STIP ID 3 o m w W c Z C.Project Title D m F. a . E A n c D.Road Name or Number r, a o, c a o r d .0 iu 0 3 E.Begin&End Termini d v° 3 1 0 y E. m m F.Project Description G.Structure ID o .0� c a s a 0. 00 4 WA-14046 04 P T W CE Yes FEMA Repair Projects Various Countywide to Countywide FEMA repair projects-facilities damaged by disaster events Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 FEMA 939,750 OTHER 156,625 156,625 1,253,000 S RW 2022 FEMA 45,000 OTHER 7,500 7,500 60,000 S CN 2022 FEMA 5,076,000 OTHER 846,000 846,000 6,768,000 Totals 6,060,750 1,010,125 1,010,125 8,081,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 503,000 150,000 150,000 150,000 300,000 RW 10,000 10,000 10,000 10,000 20,000 CN 2,568,000 840,000 840,000 840,000 1,680,000 Totals 3,081,000 1,000,000 1,000,000 1,000,000 2,000,000 Report Date:November 09,2021 Page 9 All Ilk Ws; Department ot Wansportation Washington state Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< -0o A.PIN/Project No. B.STIP ID 3 c < c o m Z C.Project Title D c 3 m F p n c D.Road Name or Number o 'a o 3. n r d d c E.Begin&End Termini m v 3 C 1 0 E.B. N m F.Project Description G.Structure ID 2 n 'F.. o a. m N s to ifs 00 5 WA-02726 06 P T W CE Yes Countywide 3R Program Various Roads to Countywide preservation activities including:CTB,thin lifts of HMA,BST,pavement markers,and shoulder rock on various roads. Funding Status Phase Phase Start Year(YYY() Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 260,000 260,000 S RW 2022 0 0 15,000 15,000 S CN 2022 0 CRAB 2,620,212 2,729,788 5,350,000 Totals 0 2,620,212 3,004,788 5,625,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 60,000 40,000 40,000 40,000 40,000 RW 5,000 2,000 2,000 2,000 2,000 CN 2,600,000 550,000 550,000 550,000 550,000 Totals 2,665,000 592,000 592,000 592,000 592,000 Report Date:November 09,2021 Page 10 Ilk T 'gtonstament ofr►�t, nr� Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< 13 xi v 'o m a A.PIN/Project No. B.STIP ID D o '�° 0 3 Z C.Project Title y a ,cy r A 0 c D.Road Name or Number m a. a o CD 0 r = s m g . E.Begin&End Termini m vo 3 -I 0 1 c• a,m cr 4, F.Project Description G.Structure ID 2, o, 0 2. z CD a ? m a 00 6 WA-10775 28 P T CE Yes Countywide Paths&Trails Various Locations to i Construction and preservation of paths&trails at various locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 20,000 20,000 S RW 2022 0 0 15,000 15,000 S CN 2022 0 0 90,000 90,000 Totals 0 0 125,000 125,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 3,000 3,000 3,000 6,000 RW 5,000 2,000 2,000 2,000 4,000 CN 15,000 15,000 15,000 15,000 30,000 Totals 25,000 20,000 20,000 20,000 40,000 Report Date:November 09,2021 Page 11 7 Washington Six Year Transportation Improvement Program Transportation From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< -0 - 4712 A a a A.PIN/Project No. B.STIP ID 3 0a a m a o a Z C.Project Title D a c a 2 p n c D.Road Name or Number a o 0 0 r = $ d o o. E.Begin&End Termini vo 3 1 0 1 c, w F.Project Description G.Structure ID o. F. z m m a a 00 6 WA-10776 28 P T W CE Yes Countywide Paths&Trails-Swofford Pedestrian Improvements Swofford Rd&Green Mt.Rd to Construction of bike and pedestrian facilities. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 10,000 10,000 S RW 2022 0 0 10,000 10,000 S CN 2022 0 0 110,000 110,000 Totals 0 0 130,000 130,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 0 0 0 0 RW 10,000 0 0 0 0 CN 110,000 0 0 0 0 Totals 130,000 0 0 0 0 Report Date:November 09,2021 Page 12 ANIL Washington State .t Six Year Transportation Improvement Program ir- Department al From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside - m v 3 '<_ 3 gf 'o F.A.PIN/Project No. B.STIP ID 3 0 < o A ca Z C.Project Title D F ,s d a, a c D.Road Name or Number m o. a o 0 E. a mc E.Begin&End Termini 0 m a ,• a aO 5. H m F.Project Description G.Structure ID ae .. .'. o g g ? s a 00 7 WA-10777 06 P T W Yes Countywide Emergent Construction Projects Various Roads to Design and construction of emergent construction projects,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 300,000 300,000 S RW 2022 0 0 60,000 60,000 S CN 2022 0 0 1,440,000 1,440,000 Totals 0 0 1,800,000 1,800,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 50,000 50,000 50,000 50,000 100,000 RW 10,000 10,000 10,000 10,000 20,000 CN 240,000 240,000 240,000 240,000 480,000 Totals 300,000 300,000 300,000 300,000 600,000 Report Date:November 09,2021 Page 13 Wi Washington tate.l, ,ciot� Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside - m T '< 1 A 'o v - a -r A.PIN/Project No. B.STIP ID 3 c m o a Z C.Project Title y a c a _ a p �. c D.Road Name or Number m o o' u ' n r m d c E.Begin 8 End Termini ao 3tx z -i o a E. m m s, F.Project Description G.Structure ID � o. 3. o m m s a a 00 8 WA-02925 21 P T W CE Yes Countywide Misc.Safety&Guardrail Various Roads to Perform various safety projects as needed and install guardrail at necessary locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 270,000 270,000 S RW 2022 0 0 30,000 30,000 S CN 2022 0 0 1,500,000 1,500,000 Totals 0 0 1,800,000 1,800,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 45,000 45,000 45,000 45,000 90,000 RW 5,000 5,000 5,000 5,000 10,000 CN 250,000, 250,000 250,000 250,000 500,000 Totals 300,000 300,000 300,000 300,000 600,000 Report Date:November 09,2021 Page 14 AIL � «partmen� ,, Six Year Transportation Improvement Program-74i et ilon From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside I m 3 < T. v - A o' A.PIN/Project No. B.STIP ID 3 0 < c o m Z C.Project Title D m cCD E A n o c D.Road Name or Number X c a o F. C) r - a d 2 cr E.Begin&End Termini m 0 311 a -I 0 a 1 E. H m gl F.Project Description G.Structure ID B. a, o m O. s s a 06 9 WA-14047 04 0.020 CE No Shorey Road Bank Stabilization 40098-Shorey Rd 0.598 to 0.618 Permanent restoration-Bank stabilization will include a combination of a continuous bank roughening Large Woody Material(LWM)jams and LWM barbs. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 ER 545,143 0 85,080 630,223 S RW 2022 ER 8,650 0 1,350 10,000 S CN 2022 ER 1,595,732 0 249,045 1,844,777 Totals 2,149,525 0 335,475 2,485,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 630,223 0 0 0 0 RW 10,000 0 0 0 0 CN 1,844,777 0 0 0 0 Totals 2,485,000 0 0 0 0 Report Date:November 09,2021 Page 15 TWashington State Six Year Trans ortation Pro ram Department of Transportation p Improvementg From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside - — m 33, c 'o c •, A.PIN/Project No. B.STIP ID 3 c fg m . o a Z C.Project Title y A c a d p c D.Road Name or Number m c c. it .'» n r B. a m c E.Begin&End Termini d v 3 a 3 •e E. n m F.Project Description G.Structure ID a z P ail_ a a 05 10 /H210(008) WA-06389 03 C P T W 1.250 CE Yes Centralia Alpha Road Improvements 94001-Centralia Alpha Rd 10.600 to 11.85 Slope stabilization,intersection improvements,roadway widening,resurfacing with hot mix asphalt,guardrail,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 STP(R) 43,250 0 6,750 50,000 S RW 2022 0 0 50,000 50,000 S CN 2022 STP(R) 1,490,650 CRAB 1,839,000 1,170,350 4,500,000 Totals 1,533,900 1,839,000 1,227,100 4,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 50,000 0 0 0 0 RW 50,000 0 0 0 0 CN 4,300,000 200,000 0 0 0 Totals 4,400,000 200,000 0 0 0 Report Date:November 09,2021 Page 16 7WashingtonStent of;},�t, Six Year Transportation Improvement Program portation From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m v ` o D A a c a A T A.PIN/Project No. B.STIP ID in 0 a 0 3 Z C.Project Title X. m i m . B a xi 0 = D.Road Name or Number ,� o a c 3. r d 6 6 c E.Begin&End Termini 3.m v 3 a -1 0 a 1 =. m m LI F.Project Description G.Structure ID ,o a .', z H a' m 0. 00 11 WA-14048 21 C P T W Yes 2021 County Safety Program Various Roads Countywide to Countywide Upgrade signs,improve clear zone,flatten slopes,add/upgrade barriers,widen shoulders,remove/modify fixed objects,and reduce pavement edge drop-offs. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 HSIP 98,000 0 0 98,000 S CN 2023 HSIP 809,000 0 0 809,000 Totals 907,000 0 0 907,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 98,000 0 0 0 0 CN 0 809,000 0 0 0 Totals 98,000 809,000 0 0 0 Report Date:November 09,2021 Page 17 StateANL „ ,,,� Six Year Transportation Improvement Program 7; Department From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '<_ v v A C A p A O a c A.PIN/Project No. B.STIP ID 3 c 3 o m Z C.Project Title D m c a d pa 2 c D.Road Name or Number a a o a n r- m a m E.Begin&End Termini m o 3 a 1 o i S. N m F.Project Description G.Structure ID_ 2 o, » z m a m a. - 05 12 WA-14049 14 0.090 CE Yes Skate Creek North Bridge Scour 79908-Skate Creek Rd N 0.91 to 1.00 Bridge and road scour protection,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 WFL 285,450 0 44,550 330,000 S RW 2024 WFL 8,650 0 1,350 10,000 S CN 2025 WFL 2,693,760 0 420,413 3,114,173 Totals 2,987,860 0 466,313 3,454,173, Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 100,000 200,000 30,000 0 0 RW 0 0 10,000 0 0 CN 0 0 0 3,114,173 0 Totals 100,000 200,000 40,000 3,114,173 0 Report Date:November 09,2021 Page 18 � Washington State Six Year Trans ortation Im rovement Pro ram 1 Department of Transportation p p 9 From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 -. II -073 o 0. - A.PIN/Project No. B.STIP ID 3 73 c 3 o 0 pa c Z C.Project Title D a c a n E ,3 ,^. c D.Road Name or Number a 0. o. c .'. r m— s d c E.Begin&End Termini m in 3 ' 1 0 a 1 E. n m F.Project Description G.Structure ID a ' o a s a o. 04 13 WA-13259 03 C G P S T 2.150 CE Yes W Harrison Avenue Improvements 91000-Harrison Avenue 0.570 to 2.717 Improvements including:widening of the roadway,sidewalks,street lights,storm water,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 STP(US) 865,000 0 135,000 1,000,000 Totals 865,000 0 135,000 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 250,000 250,000 250,000 250,000 0 Totals 250,000 250,000 250,000 250,000 0 Report Date:November 09,2021 Page 19 ANL T Department Washington otaf,�t> ,�r«. Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< v A o' o o D m 3 A.PIN/Project No. B.STIP ID 3 2 3 _ o a Z C.Project Title > m c a ,- d = p ,n. c D.Road Name or Number m a a o a- n r n a m E.Begin 8 End Terminl vo 3 ' ,� c a ,� c. w d T. F.Project Description G.Structure ID a o, z fD (o a a a S a a 09 14 CRP-2155 03 CPT 0.310 CE Yes Wigley Road Improvements 17912-Wigley Rd 0.720 to 1.033 Improve by grading,preleveling with HMA,horizontal and vertical alignments will be improved,and other related work. I Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 10,000 10,000 S RW 2022 0 0 5,000 5,000 S CN 2023 0 0 300,000 300,000 Totals 0 0 315,000 315,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 5,000 0 0 0 RW 5,000' 0 0 0 0 CN 0 300,000 0 0 0 Totals 10,000 305,000 0 0 0 Report Date:November 09,2021 Page 20 TWashington State Six Year Transportation Improvement Program Department of Transportation p p g From 2022 to 2027 Agency: Lewis Co. County: Lewis MPOIRTPO: SWW RTPO N Inside Y Outside m v ` S. z o' ° r A.PIN/Project No. B.STIP ID D - o '�^ o B C.Project Title D m w m , y o ,^. c D.Road Name or Number m a a o ti r d a c E.Begin&End Termini v 3 Z - E. fm m F.Project Description G.Structure ID 0 o, a o m m S m a 08 15 CRP-2137 03 P T 1.780 CE Yes Swofford Road Rehabilitation 62850-Swofford Rd 0.000 to 1.777 Improve by grading,preleveling with asphalt class A,horizontal and vertical alignments will be improved,intersection realignment,and other related work. 'Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 20,000 20,000 S RW 2022 0 0 5,000 5,000 S CN 2024 0 0 750,000 750,000 Totals 0 0 775,000 775,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 10,000 0 0 0 RW 5,000 0 0 0 0 CN 0 0 750,000 0 0 Totals 15,000 10,000 750,000 0 0 Report Date:November 09,2021 Page 21 Washington State Six Year Transportation Improvement Program Department of From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside l mi T < -0 - o o. A.PIN/Project No. B.STIP ID a xi 3 a 3 c o a Z C.Project Title D m c A .' e+ , p n,n. c D.Road Name or Number c c o n r- °i 2 m c E.Begin 8 End Termini m v 3 1 0 a -I 5. a a m z `c m v m' 0 B F.Project Description G.Structure ID . c » o 0 = a n 16 16 CRP-2153 03 CO P S T 0.560 CE Yes W Rush Road Improvements 94006-Rush Rd 2.600 to 3.164 Major widening,possible curb and gutter,sidewalks,base stabilization,HMA,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 130,000 130,000 P RW 2023 0 0 150,000 150,000 P CN 2024 0 0 2,400,000 2,400,000 Totals 0 0 2,680,000 2,680,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 5,000 75,000 50,000 0 0 RW 0 100,000 50,000 0 0 CN 0 0 2,400,000 0 0 Totals 5,000 175,000 2,500,000 0 0 Report Date:November 09,2021 Page 22 WashingtonMilk st.to Six Year Transportation Improvement Program Afri Department of From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m T '< v — z 'o 'o o > a m S i 3 z m A.PIN/Project No. B.STIP ID o _. o Z C.Project Title D m c m s p c D.Road Name or Number m o. 'a o ... r - .0 IC! . E.Begin&End Termini m co 3 a _ o 1 c, cr a m SI F.Project Description G.Structure ID m . ,F F., o a a O. s a a 09 17 CRP-2151 06 C P T 1.140 CE Yes Boyd Road Rehabilitation 61451-Boyd Rd 0.000 to 1.140 Vertical and horizontal improvements,base stabilization,BST,and other related • work. i Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds . S PE 2022 0 0 80,000 80,000 P RW 2024 0 0 50,000 50,000 P CN 2024 0 0 350,000 350,000 Totals 0 0 480,000 480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 10,000 60,000 0 0 RW 0 0 50,000 0 0 CN 0 0 350,000 0 0 Totals 10,000 10,000 460,000 0 0 Report Date:November 09,2021 Page 23 T/ilk Washington State Six Year Transportation Improvement Program Deportment of Transportation p p g From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m v 3 A o 0 5 H < c - a xi r A.PIN/Project No. B.STIP ID 3 o 3 = 0 e f Z C.Project Title D a c a d n c D.Road Name or Number m a as o a 0 r n a n 5 5 E.Begin 8,End Termini d o ' 3 ' 1 0 a 1 S. m mcr F.Project Description G.Structure ID m' o. a Z m a O. s a a. 09 18 CRP-2152 06 CPT 1.410 CE Yes Isbell Road Rehabilitation 61450-Isbell Rd 0.000 to 1.410 Vertical and horizontal improvements,base stabilization,BST,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 80,000 80,000 P RW 2024 0 0 50,000 50,000 P CN 2024 0 0 350,000 350,000 Totals 0 0 480,000 480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th S 6th • PE 10,000 10,000 60,000 0 0 RW 0 0 50,000 0 0 CN 0 0 350,000. 0 0 Totals 10,000 10,000 460,000 0 0 Report Date:November 09,2021 Page 24 Washington st Transportation at. Six Year Transportation Improvement Program Department el From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 << z a 0 A.PIN/Project No. B.STIP ID 3 c < c o f c Z C.Project Title D a c a . t= p n,^., c D.Road Name or Number ,� o 'a c ,�. r d- .0 m c E.Begin 8 End Termini - v 3 l 0 1 E. m m F.Project Description G.Structure ID mo 0. z .2 0 = m o. 00 19 WA-07344 15 CE No North County Industrial Access N/A to N/A Finalize regional design efforts for a direct industrial ingress/egress arterial two-lane, I two-way truck route from Interstate 5 to North Lewis County industrial properties. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds • S PE 2022 0 0 30,000 30,000 P PE 2025 0 OTHER 1,000,000 0 1,000,000 P RW 2025 0 OTHER 1,000,000 0 1,000,000 P CN 2025 0 OTHER 18,000,000 0 18,000,000 Totals 0 20,000,000 30,000 20,030,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8,6th PE 20,000 5,000 5,000 1,000,000 0 RW 0 0 0 1,000,000 0 CN 0 0 0 3,000,000 15,000,000 Totals 20,000 5,000 5,000 5,000,000 15,000,000 Report Date:November 09,2021 Page 25 otof Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< v I. 73 m o A.PIN/Project No. B.STIP ID D o < o 3 c Z C.Project Title D m c a er a p a c D.Road Name or Number o. 0. E. — ff r d 2 m= c E.Begin&End Termini v 3 .c 0 1 S. m m F.Project Description G.Structure ID a a * . m H s o a 07 20 WA-14050 08 C P T W CE Yes Westside Connector To be determined to To be determined New bridge and roadways to provide a westside connection over the Chehalis River Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 0 0 10,000 10,000 P PE 2023 Discretionary 432,500 0 67,500 500,000 P RW 2024 Discretionary 216,250 0 33,750 250,000 P CN 2026 Discretionary 3,667,600 0 572,400 4,240,000 Totals 4,316,350 0 683,650 5,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 10,000 50,000 200,000 200,000 50,000 RW 0 0 100,000 100,000 50,000 CN 0 0 0 0 4,240,000 Totals 10,000 50,000 300,000 300,000 4,340,000 Report Date:November 09,2021 Page 26 t on Cato t Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m a ` F. 'o A.PIN/Project No. B.STIP ID 3 2 �° c o m c Z C.Project Title D a c a ,7 i1 p 0. c D.Road Name or Number m o. 'a o a n r F. a d o v E.Begin&End Termini m v 3 -4 o 1 s. d 11 F.Project Description G.Structure ID 2 o,11 ' o ,i a ID a n 07 21 /2021(056) WA-10885 10 0.010 DCE No Townsend Bridge#223 Replacement 65605-Townsend Rd 0.22 to N/A Bridge replacement. 08294200 Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 STP(BR) 1,000 0 0 1,000 Totals 1,000 0 0 1 1,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 1,000 0 0 0 0 Totals 1,000 0. 0 0 0 Report Date:November 09,2021 Page 27 Washington WA; Transportation Stat Six Year Transportation Improvement Program Department of From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 5 mi za 0o A.PIN/Project No. B.STIP ID 3 0 c o o Z C.Project Title D c a 4 _ a p 9 c D.Road Name or Number a a n o— 3• n r d a m 0 v E.Begin&End Termini v0 3 1 00. 1 E. m m F.Project Description G.Structure ID m a '. o m a 00 22 /000S(553) WA-12552 21 C P T W CE Yes 2019 County Safety Program-Phase II Various Roads Countywide to Countywide Upgrade signs,improve clear zone,flatten slopes,add/upgrade barriers,widen shoulders,remove/modify fixed objects,and reduce pavement edge drop-offs. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 HSIP 2,000 0 0 2,000 • Totals 2,000 0 0 2,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 2,000 0\ 0 0 0 Totals 2,000 0 0 0 0 Report Date:November 09,2021 Page 28 Allk Washington Late Six Year Transportation Improvement Program-7; Department From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m • 3 '< v a a — aa A A.PIN/Project No. B.STIP ID 3 a < c o a a Z C.Project Title D c E. g A n,o_. c D.Road Name or Number m c a o ' r1 r a a_ udi c E.Begin&End Termini v 3 Z ,� a a S. y m F.Project Description G.Structure ID a a a o m N s n a 04 23 WA-13256 03 C P S T W 0.890 CE Yes Reynolds Road Improvements 91011-Reynolds Avenue 0.099 to 0.993 Improvements include widening of the roadway,sidewalks,street lights,storm water, and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 TIB 75,000 25,000 100,000 P RW 2026 0 TIB 75,000 25,000 100,000 P CN 2027 0 TIB 1,500,000 500,000 2,000,000 Totals 0 1,650,000 550,000 2,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 100,000 RW 0 0 0 0 100,000 CN 0 0 0 0 2,000,000 Totals 0 0 0 0 2,200,000 Report Date:November 09,2021 Page 29 MIL on tent at.Transportation Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 76. v z 'o A.PIN/Project No. B.STIP ID 3 c c F a Z C.Project Title D m m . A ^. c D.Road Name or Number a Qg. c '» (-) r 3 a m cr . xi E.Begin&End Termini 0 a °o. S. m m F.Project Description G.Structure ID �'o o, o m m =. a a 07 24 WA-02952 03 C G P T 2.610 CE Yes Avery Road West Improvements 30081-Avery Rd W 0.090 to 2.700 Base stabilization and roadway widening for anticipated industrial commercial traffic, and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 STP(R) 164,000` 0 26,000 190,000 P RW 2024 STP(R) 21,000 0 4,000 25,000 P CN 2025 STP(R) 433,000 0 67,000 500,000 Totals 618,000 0 97,000 715,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 180,000 10,000 0 RW 0 0 20,000 5,000 0 CN 0 0 0 500,000 0 Totals 0 0 200,000 515,000 0 Report Date:November 09,2021 Page 30 Washington State > n Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside - m 3 S. v A e O A m e A.PIN/Project No. B.STIP ID 3 c o C Z C.Project Title y m F. m ,7 d Z A n c D.Road Name or Number o. a o a 0 r m m E.Begin&End Termini m3. m 3 ti o 1° S. 1 m W F.Project Description G.Structure ID m a ems, z 1g o e a 05 25 WA-02954 03 C P T 5.550 CE No Tucker Road Improvements 95003-Tucker Rd 0.000 to 5.549 Improvements include widening to current standards,create shoulders,remove obstacles from the clear-zone,ditches,storm water,paved surfacing,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 CRAB 257,000 28,000 285,000 P RW 2024 0 CRAB 257,000 28,000 285,000 P CN 2025 0 CRAB 2,051,000 229,000 2,280,000 Totals 0 2,565,000 285,000 2,850,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 100,000 185,000 0 RW 0 0 100,000 185,000 0 CN 0 0 0 2,280,000 0 Totals 0 0 200,000 2,650,000 0 Report Date:November 09,2021 Page 31 T Depart t olVan ation Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m T -11 -0 O 2 < C -1 3 71 A.PIN/Project No. B.STIP ID 3 D = o m = C.Project Title y c a 4 - r' c D.Road Name or Number a a m 2 n_. o a o c) r iu 3 c E.Begin&End Termini v 3 a _ 0 -i S. an d T. F.Project Description G.Structure ID ro o, P. z a a J m a 07 26 WA-02955 03 C P T 0.040 CE No Avery Road West/North Military Road Intersection 30081-Avery Rd W&30062-N Military Rd 0.430 to 0.470 Intersection improvements and signalization,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 0 20,000 20,000 P CN 2026 0 0 50,000 50,000 Totals 0 0 70,000 70,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 20,000 0 CN 0 0 0 0 50,000 Totals 0 0 0 20,000 50,000 Report Date:November 09,2021 Page 32 ,,Washington Stat�y°,,,, ,o,� Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< za 'o , A.PIN/Project No. B.STIP ID 3 a m c o m g Z C.Project Title D a c a . m A n^_. c D.Road Name or Number a a a S. T r N a c E.Begin&End Termini m v° A a c E. v,S. gi F.Project Description G.Structure ID m a 5. P m H s a n 07 27 WA-05043 03 C G P S T 3.320 CE Yes W SR 505 Corridor Improvements. SR 505 Mainline 2.180 to 5.500 Corridor improvements including truck climbing lane,intersection improvements, traffic signals,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 OTHER 511,000 511,000 1,022,000 P RW 2027 0 OTHER 37,500 37,500 75,000 P CN 2026 0 OTHER 895,500 895,500 1,791,000 Totals 0 1,444,000 1,444,000 2,888,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 225,000 797,000 RW 0 0 0 0 75,000 CN 0 0 0 0 1,791,000 Totals 0 0 0 225,000 2,663,000 Report Date:November 09,2021 Page 33 T «nort►ansportation Six Year Transportation Improvement Program From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 7 3 '_< 00 m ' A.PIN/Project No. B.STIP ID D o . c 3 c Z C.Project Title D m m S. y^ a A 0 c D.Road Name or Number n a a o F. 0 r m a a E.Begin&End Termini v m Z 0 E. an d i F.Project Description G.Structure ID 2 a - a o o R. s ,�, a 09 27 WA-02993 04 C P T 0.290 CE No Teitzel Road Bridge Approach Repair 17381-Teitzel Rd 0.700 to 0.990 Reconstruct bridge approaches and other related work. Funding Status ' Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 0 30,000 30,000 P CN 2026 0 0 170,000 170,000 Totals 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 30,000 CN 0 0 0 0 170,000 Totals 0 0 0 0 200,000 Report Date:November 09,2021 Page 34 T %Washington State Six Year Transportation Improvement Program Department of Transportation p p g From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 '< 'o A.PIN/Project No. B.STIP ID 3 c a c m Z C.Project Title > c a l = A n c D.Road Name or Number a o. o, 0 3 n r n H cr . E.Begin&End Termini m vo m Z a E. n m F.Project Description G.Structure ID a o m s a 19 28 WA-02994 01 C G P S T 0.970 CE Yes W Gallagher Road Extension 11004-Gallagher Rd 0.000 to 0.970 Construct new urban roadway to Harrison Ave.,curb,gutter,sidewalks,illumination, and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 Discretionary 50,000 OTHER 50,000 0 100,000 P RW 2026 Discretionary 15,000 OTHER 15,000 0 30,000 P CN 2026 Discretionary 485,000 OTHER 485,000 0 970,000 Totals 550,000 550,000 0 1,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 100,000 RW 0 0 0 0 30,000 CN 0 0 0 0 970,000 Totals 0 0 0 0 1,100,000 Report Date:November 09,2021 Page 35 ANL an Six Year Transportation Improvement Program 71 Department From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 7 30 5 z o A.PIN/Project No. B.STIP ID 3 c CD o 3 g Z C.Project Title a 3 n CD 73 c D.Road Name or Number a 'a o' F- 0 r m 2 d o 3 E.Begin&End Termini m mi 3 1 0 1 E. a m F.Project Description G.Structure ID m a FF. o m N 5 D 0. 19 29 WA-02998 01 C G P S T 0.380 CE Yes W Downie Road Extension 40150-Downie Rd 0.000 to Construct new urban road to Maurin Rd.,base stabilization,HMA,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 Discretionary 50,000 OTHER 50,000 0 100,000 P RW 2026 Discretionary 10,000 OTHER 10,000 0 20,000 P CN 2026 Discretionary 540,000 OTHER 540,000 0 1,080,000 Totals 600,000 600,000 0 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 100,000 RW 0 0 0 0 20,000 CN 0 0 0 0 1,080,000 Totals 0 0 0 0 1,200,000 Report Date:November 09,2021 Page 36 T onsent � n Six Year Transportation Improvement Program tansportion From 2022 to 2027 Agency: Lewis Co. County: Lewis MPO/RTPO: SWW RTPO N Inside Y Outside m 3 < v -a — o m o a A c A.PIN/Project No. B.STIP ID 3 c < c 3 c Z C.Project Title D m c 3 m 3 is c D.Road Name or Number a a a. o .'. n r m a 0 3 E.Be in&End Termini m a 3 ' .4 G m E. H'm_ m F.Project Description G.Structure ID ro a a o A m s a a 07 30 WA-03004 04 C P T 0.800 CE Yes Highway 603(4)Rehabilitation 93006-Hwy 603 10.900 to 11.700 Improve horizontal alignment,widen and reconstruct roadway base,overlay with HMA,and other related work. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 CRAB 108,000 12,000 120,000 P RW 2026 0 0 40,000 40,000 P CN 2027 0 CRAB 892,000 59,000 951,000 Totals 0 1,000,000 111,000 1,111,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 120,000 RW 0 0 0 0 40,000 CN 0 0 0 0 951,000 Totals 0 0 0 0 1,111,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Lewis Co. 22,347,485 34,803,958 19,576,715 76,728,158 Report Date:November 09,2021 Page 37 Lewis County, Washington Annual Construction Progran ' by:.,, ,L `i Distri .�- . -� _ ,,,ram _ iii R m W c2 m L R_ c' Galvin 2'5 LL Tty I NI,' ` •... 1, _ e li no . ---Y ' 'T d��, ' , gym_ ��.. Priority Project i G � 10 Jones Road Culvert(MP 1.71) . c 4-' .. ,,, .. ,,, ._ - 14 Salzer Valley Road Slide (MP 5.35) b. ir r J 25 Harrison Avenue Improvements & Planning Study (MP 0.55- 2.54) 26 Wigley Road Improvements (MP 0.720 - 1.033) 'k. /II Chehalis 31 North County Industrial Access (To Be Determined) r 1 i Ilk / N N fir' IN handler-. O���Gi�. r'�1@ if .ems kerCr., •d Chi O ` . � ,, '� Dryad IMO � � DoryP. ',, Y C ad Leudin.haus Rd i mo4 Adna Elk•'i ',i` ry Ri� _. --._` re x r � 1 ll I ritem Project ' �� ` r. Ceres MII Rd Ny o � _ 1‘1961. . .\. 10 Jones Road Culvert (MP 1.71) �' aks /L— 32 W 14 Salzer Valley Road Slide (MP 5.35) lea E s s a i _. 25 Harrison Avenue Improvements & Planning Study (MP 0.55 - 2.54) �� - i ill Rd cc m J P Lewis County, Washington Annual Construction Program For 2022 by Commissioner District e lfl i eek R,, - ----,: . �,,�. r� -- e — cc L � �. � �� .6 k 2V B �'O 0.d ' .01.. N Galvin 25 7 31_0 ) i '"tY . -i.,. . Central'. r. 4 „viiii#6,,, ,, . . E ''' . ...ii ` Chehalis r �. carom„•aphe Rd • Ik...,,•i•' o.a"iTr 'R'' Y-- - �. l� 4sliat - (sir (" x 1 i 4 1 t.--- "Rl' 1.II 'lir .-keikkialli, r .1,1 it R6 _ , , .......... t • gRd Vela. ` ,�,�'� d Iy qa tie ''' IF,anima AimA P' ,a eoa.trort _ , .0 'c ..:dw E.1 i zandec , ki .1= 32 `1 11[191 Psnriid 111 ..J ' , Rape !�� mom. . , .t , A L c x0... !Emir (� Toledo in 0. 3 ?c R. Lewis County i r i en ` Commissioner Districts ' 'f.� r `+ fr,_ir -AO Distant Matrix! Priority Project 2 3 3 ICng Road Bridge Scour(MP 12.26) o 4 6 4 Sargent Road Bridge Scour(MP 1.33) 21 Shorey Road Bank Stabizetion(MP0.598-0.618) Mlles 28 Rush Road Improvements(M.2.600-3.164) Item Project • . .� Commission 3 �srIIR12M3, #2 l 21 BMeY Riad Bank Sleh.anon(WO eve o 1ew'n COUNTY' Construction projects 1,5,7,8,16, 2e f0'"wetlnprp'ene1',"*'280-'", sented on the map;these projects are.r..,.a., .. ,........ : Construction Projects (1)Countywide Bridge/Road Bank Protection (Various Roads) labeled by priority This map was created by Leans County Geographic (5)Countywide Culvert Replacement(Various Roads) • Information Services.The accuracy of the map has (7)Federal Forest Road Improvements riot been verified,and it should be used for informational purposes only.A,possible discrepancies (8)FEMA Repair Projects(Various Roads) rb.r deyACPIMm Na m.. should he brought to the attention of Leal.County (16)Countywide 3R Program(Various Roads) 8� c g<'pm`Information se.ei`e'. (17)Countywide Paths&Trails Prcieceiun:lembert Conformal Conic (19)Countywide Emergent Construction Projects(Various Roads) Datum:1983 North American Datum Coownam system:sate Plane Washington south 4602 Fee (20)Countywide Misc.Safety&Guardrail(Various Roads) O.\maps\mg\AnnualConetProg_CommDiat2.mxd (23)2021 County Safety Program September 2021 Annual Construction Program For 2022 Lewis County Commissioner Districts by ,,tr IC Priority Project District District -- . 2 Stow ell Road Bridge Scour(NIP 0.57) Commissioner District 3 6 Centralia Alpha Road Culvert Replacement(RP 15,79) -------- 9 Carr Road Slide(AP 0.26-028) •.._�1 11 Rgeon Springs Road Side(MP 2.30) " -,.sr�r-1�__� ` 12 Crumb Road Advert&Road Repair(kP 0.17) F- �.n_� r' 13 Kiona Road Fydrauic Study(RRP0.35) - '— „- �, < - "K `�Y�4 ro 1 18 Swofford Pedestrian irproverrents(Green M.Road MP 0.000-1.600) MP" t' i o.o«�, a --ti 22 Centralia Alpha Road Improvements(M1P 10.60-11.65) .•A 1 24 Skate Creek North Bridge Scour(MR0.91-1.00) a • 27 Ssv°fiord Road Rehableal'on(MP 0.000-1.777) xt �; ''�\ V v ' 29 Boyd Road Rehabilitation(M.0.00-1,14) ;'i 8-'- ) r `' 1 ,®i„�.. \ . e, 30 Isbell Road Rehabilitation(MP0.000-1.41) ) \ Mount Baker l �� ' p, _,..0 ,� L Sno ualmie �. Project6) q © Mount _I �""""°�°°." 05J Natl Forest 6Ni,i.Maw R.Gaen Noncom.lwts n) . 1'I ^..4 _ L — l R ` J 9 6rt Rad aWlwa16026) it Re Oan.ana eb,(w330) t tr cant aWrWH3R.alYpa(w9tr) e. Park [fy/ Natl � 13 iw.w,.aara.aos Ntwo,ssl ) \ �' I re C o Coo..wa^vw b,r^«r^+r(v^a ee.Road 06) -aedo 3,: m ow,r eon.Rod nnw,.w,) toss Des) i J' N 84.Crackletln Bridge Scow ilNl9 100i ' Tr awmaams Nu.o.iemilw0.non tin) al IlayelIBM Road iila9Y.mn 1.000-1.1 FA m� Ce i-1 efkalli- ��� _J ;36 }30 Yb,Ilataa NlaEY0wi1w Oro0 m4 4 31 Toiawq: No.213 R.p.rriw `� q A • • w Lemon Morton s u. , 4 S .: _ . 6 -pe 41 _‘-ziiiii-mitv, 15,:xiii. ,,,, .. - _ EE; 4oniand'''' Llii - --, daa: w R. 27 a n �:W, 13 14111 m 1 , 29 • �i� .: 1 7 .a r 1179ream Rd d. � - te ''re5 18 f And.." .c i Gifford .. , tur . Pinchot ics - r„E.d. "�, b ;( --- Natl K- Commissioner District #3 Construction projects 1,5,7,8,16,19 1e ')A .^A"3 are not represented o 1 2 4 6 on the map;these projects are.M6...'a6y��. w°e�:der of priority: Construction Projects 11 (1)Countywide Bridge/Road Bank Protection (Various Roads) labeled by priority Miles (5)Countywide Culvert Replacement(Various Roads) • (7)Federal Forest Road Improvements This map was created by Lewis County Geographic Information Services. The accuracy of the map ha,not been verified,and it should be used for _- (8)FEMA Repair Projects(Various Roads) informational purposes only.Any possible discrepancies should be brought (16)Countywide 3R Program(Various Roads) to attention attemn of Lewis county Geographic information Service. (17)Countywide Paths Trails fsris cou oiecti wrr; & Pron:Lambert Conformal conic (19)Countywide Emergent Construction Projects(Various Roads) Datum 1983 North American Datum '' 20 Countywide Misc.Safety&Guardrail(Various Coordinate system:State Plane Wulungton south 4602 Feet ( ) tyw' Roads) °:\maps\erg\AnnualConstProg_CommDl,i3.mad (23)2021 County Safety Program September 2021 BOCC AGENDA ITEM SUMMARY �l Resolution: BOCC Meeting Date: Nov. 23, 2021 Suggested Wording for Agenda Item: Agenda Type: Hearing - Resolution Adoption of the 2022-2027 Six Year Transportation Improvement Program (TIP) and 2022 Annual Construction Program (ACP) Contact: Josh Metcalf Phone: 2762 Department: PW - Public Works Description: Adoption of the 2022-2027 Six Year Transportation Improvement Program (TIP) and 2022 Annual Construction Program (ACP), after a public hearing was held November 23, 2021 pursuant to notice published in The Chronicle on November 11th and 18th, 2021. Copies of these programs will be furnished to the Washington State Department of Transportation (WSDOT), County Road Administration Board (CRAB), and the Transportation Improvement Board (TIB) not more than thirty days after its adoption by the legislative authority. Approvals: Publication Requirements: Publications: User Status PA's Office Pending Additional Copies: Cover Letter To: Tim Fife - PW, Geoff Soderquist - PW, Robin Saline - PW d of County Commissioners Lewis County Washington NOV 13221