Initiate county road construction projects and assigning County Road Project (CRP) numbers. BEFORE THE BOARD OF COUNTY COMMISSIONERS
LEWIS COUNTY, WASHINGTON
IN THE MATTER OF: RESOLUTION NO. 21-441
INITIATE COUNTY ROAD CONSTRUCTION
PROJECTS AND ASSIGN COUNTY ROAD PROJECT
(CRP) NUMBERS
WHEREAS, pursuant to RCW 36.75.050, the powers and duties vested in or
imposed upon the Board of County Commissioners (BOCC) with respect to
establishing, examining, surveying, constructing, altering, repairing, improving,
and maintaining county roads, shall be exercised under the supervision and
direction of the county road engineer; and
WHEREAS, the BOCC shall by resolution, and not otherwise, order the survey,
establishment, construction, alteration, or improvement of county roads; the
county road engineer shall prepare all necessary maps, plans, and specifications
therefore, showing the right-of-way widths, the alignments, gradients, and
standards of construction.
NOW THEREFORE BE IT RESOLVED that the projects listed in Exhibit A be
constructed as shown. These projects are hereby declared to be public necessity
and made part of the of the officially adopted annual road program in accordance
with RCW 36.81.130. The county road engineer is hereby ordered and authorized
to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, &
36.80.070); and
NOW THEREFORE BE IT FURTHER RESOLVED that expenditures from the
officially adopted road fund budget and based on the county road engineer's
estimates are hereby made in the amounts and for the purposes shown in Exhibit
A.
DONE IN OPEN SESSION this 14th day of December, 2021.
Page 1 of 2 Res. 21-441
APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS
Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON
Amber Smith Lindsey R. Pollock, DVM
By: Amber Smith, Lindsey R. Pollock, DVM, Chair
Deputy Prosecuting Attorney
ATTEST: oUNTY,wqs,•
•\S RnUF..ky • Sean D. Swope
can D. Swope, Vice Chair
:o C�
SX�
•.'V ' 4514,
,,,
Rieva Lester '•:Sy�.cso
F. Lee Grose
Rieva Lester, F. Lee Grose, Commissioner
Clerk of the Lewis County Board of
County Commissioners
Page 2 of 2 Res. 21-441
Exhibit A
1 2 3 4 5 6 7 8 9
Type of 0 Cost Estimate Annual
Road Name Road Work .1 o (Thousands) Construction CRP
and/or Bridge Log g (see code) � >, Program No.
o Number No. v = No.
0
M.P. to M.P. v Eng. & R/W Construction
Grant Local Grant Local
2022 Countywide 3R n/a - - ABCDE X X 65 437 2,163 5 2194
Program (Title Category)
2022 Countywide Misc. n/a - - ABH X X 50 250 8 2195
Safety& Guardrail
2021 County Safety n/a - - ABH X 98 809 11 2196
Program
Westside Connector n/a - - ABCDEI X 649 111 3,668 572 20 2197
(4)Type of Work Code (5)The construction is to be accomplished by contract in
accordance with RCW 36.77.020 et. seq.
A. Preliminary Engineering
B. Right of Way
C. Grading, Draining, Surfacing (6)The construction is to be accomplished by county forces
D. Light Bit. Surf. Treatment in accordance with RCW 36.77.065 and WAC 136-18.
E. A.C. or P.C.C. Pavement
F. Curbs and Gutters
G. Sidewalks
H. Traffic Facilities
I. Bridge Construction
J. Paths &Trails (RCW 47.30)
BOCC AGENDA ITEM SUMMARY
Resolution: BOCC Meeting Date: Dec. 14, 2021
Suggested Wording for Agenda Item: Agenda Type: Deliberation
Initiating county road construction projects and assigning County Road Project (CRP) numbers
Contact: Josh Metcalf Phone: 2762
Department: PW - Public Works
Description:
Establish County Road Project (CRP) numbers that authorize the preliminary engineering, right of
way purchase, and construction of projects as part of the 2022 Annual Construction Program (ACP)
and 2022-2027 6-Year Transportation Improvement Program (TIP).
Approvals: Publication Requirements:
Publications:
User Status
PA's Office Pending
Additional Copies: Cover Letter To:
Tim Fife - PW, Geoff Soderquist - PW, Sadie
Rockey - PW, Robin Saline - PW