Establishment of 2022 county road construction projects by County Forces. BEFORE THE BOARD OF COUNTY COMMISSIONERS
LEWIS COUNTY, WASHINGTON
IN THE MATTER OF: RESOLUTION NO. 21-447
ESTABLISHMENT OF 2022 COUNTY ROAD
CONSTRUCTION PROJECTS BY COUNTY FORCES
WHEREAS, pursuant to RCW 36.77.070 any construction performed by County
Forces where the estimated cost of the work exceeds $10,000 must be published
in one issue of a newspaper of general circulation in the county prior to
construction; and
WHEREAS, the Lewis County 2022-2027 Six Year Transportation Improvement
Program and 2022 Annual Construction Program adopted via Resolution 21-412
on November 23, 2021, lists portions of 2022 construction projects to be
constructed by County Forces.
NOW THEREFORE BE IT RESOLVED by the Board of County Commissioners that
the County Forces project funds, listed in Exhibit A, are to be expended in the
calendar year 2022, for the estimated costs shown and are hereby to be
published in compliance with RCW 36.77.070. Costs shown do not include
engineering, right of way expenses, or County Forces projects less than $10,000
(ten thousand dollars).
DONE IN OPEN SESSION this 21st day of December, 2021.
APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS
Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON
Amber Smith Lindsey R. Pollock, DVM
By: Amber Smith, Lindsey R. Pollock, DVM, Chair
Deputy Prosecuting Attorney
ATTEST: Sean D. Swope
�s o of
j'°� 'dean D. Swope, Vice Chair
SING
vgg5
�N•
,qs -COI�•,cGi
••HEN::::: ..
Rieva Lester F. Lee Grose
Rieva Lester, F. Lee Grose, Commissioner
Clerk of the Lewis County Board of
County Commissioners
Page 1 of 1 Res. 21-447
Exhibit A
1 2 3
CRP COUNTY FORCES
NUMBER NAME OF PROJECT CONSTRUCTION COSTS
2180 Paths & Trails $ 10,000
2180A Swofford Pedestrian Improvements $ 110,000
2181 Countywide Emergent Construction Projects $ 15,000
2194 2022 Countywide 3R Program $ 700,000
2195 2022 Countywide Misc. Safety & Guardrail $ 50,000
TOTAL - $ 885,000
NOTICE OF 2022 COUNTY FORCES ROAD CONSTRUCTION
Notice is hereby given that Lewis County's adopted 2022-2027 Six-Year Transportation
Improvement Program and 2022 Annual Construction Program lists portions of 2022
construction projects to be constructed by County Forces. Any construction performed
by County Forces where the estimated cost of the work exceeds $10,000 must be
published in one issue of a newspaper of general circulation in the county prior to
construction. The Board of County Commissioners has determined that the following
County Forces project funds are to be expended in the calendar year 2022, for the
estimated costs shown and are hereby published in compliance with RCW 36.77.070
C.R.P. COUNTY FORCES
NO. NAME OF PROJECT COSTS
2180 Paths & Trails $10,000
2180A Swofford Pedestrian Improvements $110,000
2181 Countywide Emergent Construction Projects $15,000
2194 2022 Countywide 3R Program $700,000
2195 2022 Countywide Misc. Safety & Guardrail $50,000
TOTAL $885,000
*Costs shown do not include engineering, right of way expenses, or County Forces
projects less than $10,000.
° WAC 136-18-030
Authorization of construction by county forces projects.
Every proposed construction by county forces road project shall be a part of the county's annual construction program as defined in RCW 36.81.130 and WAC 136-16-020.
Additions to the program, and/or substitutions in the program, may be made by unanimous action of the county legislative authority at any time as provided in RCW 36.81.130. No
construction work shall be done on any project until it has been authorized by resolution of said authority.The resolution shall include:
(1)A brief description of the project;
(2)A vicinity map showing the location of the project and its limits, provided that in lieu of individual vicinity maps, a single vicinity map showing the location of all projects may
be included with the resolution adopting the annual program;
(3)Identification of the project in terms of the officially adopted annual program;
(4)The county engineer's estimate of construction costs prepared pursuant to the completion of such preliminary engineering; and
(5)Construction plans as shall be necessary and sufficient.
(1) Description (3)Annual Program
p (2)Vicinity Map Identification (4)Construction Estimate (5)Construction Plans
2022 Countywide 3R Program-yearly program Estimated construction costs for
including: base stabilization, chip-sealing,and hot attached Priority No. 5 attached
mix asphalt overlays. this project are$700.000
Countywide Paths&Trails-construction and attached Priority No. 6 Estimated construction costs for Construction Plans are not
preservation of paths and trails at various location. this project are$10,000 completed for this project.
Swofford Pedestrian Improvements-construction Estimated construction costs for Construction Plans are not
of bike andpedestrian facilities. attached Priority No. 6
this project are$120,000 completed for this project.
Countywide Emergent Construction Projects- Estimated construction costs for Construction Plans are not
design and construction of emergent construction attached Priority No. 7 this project are$15,000 completed for this project.
projects,and other related work.
2022 Countywide Misc.Safety&Guardrail-yearly Estimated construction
program, perform various safety projects as needed attached Priority No. 8 costs for Construction Plans are not
this project are$50,000 completed for this project.
and install guardrail at necessary locations.
1
1 2 3 4 5 6 7
Centralia -e `'�'
A y,
r;�� A
t►!. ` c,ia,
3 �Sat ..
1((
rgur► . . _-_..
..--t_
orlon
I.�ii;fii 11au 04.•17
:i...� �1
,' '�� �_1.os yrock i r 'r'�w-
B
r1Yt t+►'iel,
Meier Rd E f 1
1 •
P Ethel
cr
Park Road AA! 2 H % ' Johnson Rd 9
2 < U Tucker Rd
1 - Road i.
r op
` Hanson Rd '`A o cc
-tart Road ILoad
owl /
D
<<`o Gr Rd 8
Q.
p
et Rc
'C c
In rc 41 : 4,0- 9-
_ $
E '
� l ay46 _ .� E
x
c1b
isSQ° it lssier Rd E
`
1 ill ill Al
'a/ to : m 4 ! J
1
,v
i 'po F2oa oc.t. . Hurst Rd
a Fulton Rd Rd
j
Roa ,; Ro LZ
i/7 <j .2 ad c Tem.leton Rd
Toted E c
/ G
G Q-6 -.,�e i! !— fanch R. adoo 3
�. ,� .__ .......State Route 50C I U
Eadon Rd j j
r �1 ,,,
south iv._
�� I � ��../ \
1 2 3 4 5 6 7
County Forces Construction
I\LEWIS CO 56350 - Howe Road (proposed)
Countywide 3R Program, CRP - 2194
COUNTY/
]IMEMBEM1EIRK CTB, Chipseal, & HMA
vicinity map
1 2 3 4 5 6 7
- L
A �
�~
4: ' A
.._._ .emu,
iffkIT...1.40
• i
isfire
,i
7jNaii��R�ar4t� �1 Orton ,
ossyrok
2 �I .01 _ F
d� 4i,
r ;,
.40411.
-n .: ,, C
4
� a I �,
c Road
ii..............____„
j
Alpha Way �•
�� TI A
D C T L/ tart D
q,_rsg�`l ,, Title Burnt Rage
E
r.,, a K . a d hsd 644 51,,,nog
../7 : H 1 r_g I „de:
it m h Jt .
x� ,.«'` c .l cy,d98 Y
4Valhaupt Rd
@ Rogd
FJ ��.1 F
t i'-1----
Birchen rt Road ghankk^ Road
ce
5 -§ ii,,,) 1 ceo/
r
(g L Gore i Road /►
G 3 Schoen Road :° V
R Q a
s x I . n
1 2 3 4 5 6 7
County Forces Construction
64022 - Pigeon Springs (proposed)
-414-----41116-
LEWIS COUNTY Countywide 3R Program, CRP - 2194
CTB, Chipseal, & HMA
J vicinity map
1 2 3 4 5 6 7
- l
Centralia 1- 'v AI.,
ijo-Nij
A atax; �,ar- i A
-- figrArtikk, IWO'
Aerty _di.„., ,a,„,„ .
Valli►7V_ isi islik Orton
.`„ri�rock f i
441111 C
3 Dodge Road e_4.
Ilphroad
t.
iY
ve„say . _
E "t
t.bssyrotic Rd W - i Rfyo0 k4,�
E Aturrat ad -- .,: Moss• •c. ff , - _ - -,�,f E
Bowen Rd
Rd
a Rd = " o,
st
r O,_' 8 __ tr East p{Wna - - '
Bartlett Rd m 75 12 m Rv Via •. . ,. .,. .
FrFn Naylor Rd
I .rrF
,.?". � ' �� Thor Rd ,,.
a _` S
s
Ad
sw. r
1 2 3 4 5 6 7
r.iiii i
County Forces Construction
LEWIS, couxi Swofford Pedestrian Improvements, CRP - 2180A
1111,.,,.. ,, t
11111 Paths & Trails
vicinity map
1 2 3 4 5 6 7
A - • A
r
�g F ^� t , r Fns 4_all_ { j
' d‘
. , F • `
4' _ � �,
Z / .@+.
B % Y y . :4it ` •,
•
4il ' a., tit 1001: M�
4
2 1 )4iil't.4e ,d
y
l fr- l-e rota._
.d ... i l f f
lt
i- ale. . a�� JS . Li
Road Maintenance Areas
Maintenance Area
D Lewis County, TT''ashiii'gton D
ti `, , 1
**Plans are not completed for these projects** Federal Land
Countywide Program
E Project vicinity determined based on need. Cities E
1 2 3 4 5 6 7
County Forces Construction
;.0 �. Countywide Paths & Trails, CRP - 2180
' ` y. Countywide Emergent Construction Projects, CRP - 2181
`LE'WIS COUNTY
2021 Countywide 3R Program, CRP - 2194
�.• ,,�.,•, 2021 Countywide Misc. Safety & Guardrail, CRP - 2195
vicinity map
1 2 3 4 5 6 7
A A
0 PP-
.,��.� a....SLl r.r.fir... LFSM t,
aii
:off :� : ..111/.
'(1?"--'\ -. - CA616.. D
E E
General Notes:
0. Cement Treoted Base Stabilization - Pulverize roadbed to a depth of approximately 0.70', apply
Portland-Cement at o rote of approximately 6Z of dry weight or 5.00 Lbs/sf, apply water and
mix with pulverized roadbed, blade rood to grade, and roll to achieve compaction.
F0 Crushed Surfacing Top Course - Apply CSTC to a compacted depth of 0.30'. F
0. Bituminous Surface Treatment - Apply two courses of BST.
0. Finished roadway width to match the preexisting roadway. No changes will be mode to the
horizontal or vertical alignment.
G G
1 2 3 4 5 6 7
County Forces Construction
1iOUNTY Countywide 3R Program, CRP - 2194
ydriiin=iiiiik CTB & BST
1 2 3 4 5
6 7
A A
v H
.� . -
B i!x,iT- ,. a!r"�C�A!� .
>.. . .
ipr �Y-•�a�ireiii t +'�reii •6- " e- tiir r�'.�
-lnY.OY. YZIYZiYw 7�iY� Y�iT6,.;AY�!7viraKi:ere„e7� Z.
r v
lb
L
-WON:' .. ' 0 . : : :•
D i D
E E
General Notes;
OCement Treated Bose Stabilization — Pulverize roadbed to o depth of approximately 0.70. apply
Portland—Cement at o rote of approximately 6X of dry weight or 5.00 Lbs/sf, apply water and
mix with pulverized roadbed, blade rood to grade, and roll to achieve compaction.
F 0 Crushed Surfacing Top Course — Apply CSTC to a compacted depth of 0.30'. F
0 Hot Mix Asphalt — One Course 0.20' HMA
CI Finished roadway width to match the preexisting roadway. No changes will be mode to the
horizontal or vertical alignment.
G G
1 2 3 4 5 6 7
County Forces Construction
.1446-
,LE�4ISCOUNTY� Countywide 3R Program, CRP - 2194
CTB & HMA
BOCC AGENDA ITEM SUMMARY
Resolution: BOCC Meeting Date: Dec. 21, 2021
Suggested Wording for Agenda Item: Agenda Type: Legal Notice
Establishment of 2022 county road construction projects by County Forces
Contact: Josh Metcalf Phone: 2762
Department: PW - Public Works
Description:
Establishment of 2022 county road construction projects by County Forces
Approvals: Publication Requirements:
Publications:
User Status The Chronicle on Thursday, December 23,
2021
PA's Office Pending
Additional Copies: Cover Letter To:
Tim Fife-PW, Geoff Soderquist-PW, Robin
Saline-PW, Sadie Rockey-PW, Tina Hemphill -
PW
AFFIDAVIT
OF PUBLICATION
STATE OF WASHINGTON
COUNTY OF LEWIS 120686 County Forces 2195
Road Construction NAME OF PROJECT
Paths&Trails
Kailyn Sawyer,and/or Cindy Thayer,and/or Heather Bryant, Swofford Pedestrian
and/or Ronda Pogorelc says that she is the legal clerk of NOTICE OF 2022 Improvements
COUNTY FORCES Countywide Emergent
ROAD CONSTRUCTION Construction Projects
TO Notice is hereby given that 2022 Countywide 3R
I1jroiittti Lewis County's adopted pro ram
2022-2027 Six-Year Trans- 2022 Countywide Misc.
portation Improvement Safety&Guardrail
a semi-weekly newspaper,which has been established,published Program and 2022 Annual COUNTY FORCES
in the English language,and circulated continuouslyas a Construction Program lists COSTS
g portions of 2022 construc- $10,000
semi-weekly newspaper in the City of Centralia,and in Lewis tion projects to be con- $110,000
stCounty,Washington,general circulation in Lewis County for Anyructed oby County Forces.pr- $15,0000,
construction per- $700,000
more than six(6)months prior to the date of the first publication formed by County Forces $50,000
of the notice hereto attached,and that the said Chronicle was on where the estimated cost TOTAL$885,000
the 7th day of July 1941,approved as a legal newspaper by the of the work exceeds *Costs shown do not in-
$10,000Su Superior Court of said Lewis County.And that the attached is a must be published clude engineering, right of
Pe in one issue of a newspa- way expenses, or County
true copy and was published in regular issues(and not in per of general circulation in Forces projects less than
supplement form)of said newspaper as LEGAL#120686 the county prior to con- $10,000.
The Board of
RE:County Forces Road Construction Countystructio Commissioners Y Published:The Chronicle
has determined that the December 23,2021
once each 'L ,, for a period of 1 following County Forces
project funds are to be
expended in the calendar
commencing on 12/23/2021 and ending on 12/23/2021 year 2022, for the estima-
ted costs shown and are
and both regularly distributed to its subscribers during all of said hereby published in com-
pliance Th. the full amount of the fee charged for the foregoing3 7 n 7 with R C W
period. � 36.77.070
. .Iication is f- s 25.08 C.R.P.
NO.
-i /)l/ _ �1-*1 i _I, 2180
2180A
u.•r ..d and sworn t. 'do.I me 12/23/2021 2181
2194
41 0 ‘1 . ‘
Notary Public in and or the State of Washington, _,� �t, i p
resi• gat \\\\`\\\\\\\\I I I I <:rd o►County Commissioners
�� �t�, .z. p,I,CHEL(Fs///f r'^IIntl)Washington
r ..4 ,< .3 t 012r92121
21010903 `'= r
j /'/i A v8 LAC' 1 Z
c?
y///1'O t\WA\k-`�."
i2,Q,Q, at-LIU