February 1, 2021
TO: Mindy Brooks, Senior Planner
Lewis County Department of Community Development
FROM: Tammy Barraconi, Building & Planning Manager
City of Chehalis
RE: Urban Growth Area Expansion
Parcel #: 017904002002
Acres: 109.8
Proposal Area
The City of Chehalis is presenting an application for expansion of its Urban Growth Area (UGA) in support of
a request by the estate of Virginia Breen. The proposed expansion area is a single parcel located at 259
Hamilton Road. The parcel has historically been agricultural and is located within Lewis County Rural
Development District 1 Unit per 20 Acres (RDD-20). Access is gained from Hamilton Road, and the proposal
area is in close proximity to Interstate 5, via Exit 72. A portion of the parcel – the north and northeastern
parcel boundary - is already in the City of Chehalis UGA. The City of Napavine is to the east, Lewis County
Agricultural Resource Lands (ARL) zone is to the south and west, and Lewis County RDD-20 zone is to the
west.
Breen UGA Expansion
Page 2 of 9
Zoning
Access to the proposal area is from Hamilton Road, which access Interstate 5 just to the south, at exit 72 in
the City of Napavine. City of Chehalis sewer and water are immediately adjacent to the proposal area.
Lewis County has established an application process for UGA expansion requests. The County has
developed a worksheet to guide the preparation of the application, and for an expansion request, the
following items must be addressed:
1. Map of the existing and proposed change to your city’s UGA Boundary
Maps are included in the body of this letter of application and also as attachments.
2. Needs assessment that explains why the change is necessary based on your city’s population
allocation.
The City of Chehalis is unusual in that the need to expand its UGA is not based upon growth within the City
limits, but rather because of growth in the UGAs. Therefore, the population allocation for the City is not
the best metric for understanding the need for additional UGA. The City proper is severely constrained with
respect to population growth, as documented in the City’s Comprehensive Plan:
“The city of Chehalis is virtually built out. Most of the undeveloped land within the city contains
significant constraints to development due to the presence of wetlands, steep slopes, or
floodways. Lesser constraints, such as location within a flood plain, require more costly design
than properties without such constraints. In addition, properties located in proximity to the
airport may face additional restrictions to ensure that future development does not conflict
with current airport uses or activities. Simply put, almost all of the most easily developable
land has already been developed. While the higher densities and intensities of land uses
Breen UGA Expansion
Page 3 of 9
promoted by GMA will result in more compact development patterns, the need to expand
beyond the existing corporate boundaries of the city, especially to accommodate needed
economic expansion, will become clear. In other words, Chehalis will need to continue to annex
additional areas in order to meet projected growth.” (Ch 3, pg. 26)
The Comprehensive Plan Land Use Element states that the City of Chehalis has a total of 3,751 acres.
The 2016 Comprehensive Plan notes that 2,884 acres – or 77% - within the City are encumbered with
critical areas [Ch.3, p.23]. Of the remaining 867 acres, the Comprehensive Plan indicates that only 179
acres remain available for development [Ch.3, p.26] The current revised draft of the Comprehensive
Plan draws upon this information to demonstrate that the City will need at least 200 more acres of
developable residential land if it is to meet is 2040 population allocation of 11,230.
2021 population data show the City’s current population to be 7,350 [OFM]. To achieve the 2040
population allocation of 11,230 will require adding 3,880 new residents. At the current average
household size of 2.46 per household, the number of dwellings to accommodate future growth is
1,577. Finally, based on previous trends of residential development occurring at a rate of 69%, versus
31% for multi-family, the City will need 1,088 single-family lots and 489 multi-family dwelling units.
This analysis also assumes that single-family development will occur at 4 du/acre and multi-family will
occur at 12 du/acre:
1. Average density = 4 du/ac
2. Additional lots for dwelling units needed by 2040 = 1,088
3. Gross amount of land needed (1088/4) = 272 acres
4. Add market factor (283.5 x 1.25) = 340 gross acres of residential land needed
6. Land available (69% of 179 acres) =124 acres
Residential land deficit (124 - 340) = -216 net acres
The same methodology, when applied to the need for land for multi-family development, yields this
result:
1. Average density = 12 du/ac
2. Additional dwelling units needed by 2040 = 489
3. Gross amount of land needed (489/12) = 41 acres
4. Add market factor (42.5 x 1.25) = 51 gross acres needed
5. Land available (31% of 179 acres) = 56 acres
6. Multi-family residential land surplus (56 – 51) = +5 net acres of land
The most recent population data from the State Office of Financial Management show that the majority
of population growth is occurring in the City’s UGA. The City’s population in 2010 was 7,259. As of
2021, OFM estimates the City’s population to be 7,350. This represents a growth rate of 1.25%. Also
according to OFM, the City’s UGA population in 2010 was 1,918. As of 2020 it was estimated to be
2,044, which represents a growth rate of 6.57%.
City Population 2010 City Population 2021 UGA Population 2010 UGA Population 2021
7,259 7,350 1,928 2,044
Breen UGA Expansion
Page 4 of 9
Based on the City’s current population and the growth rates discussed above, the City and UGA
projected populations in 2040 will be 9,307 and 7,298, respectively:
City and UGA Population Projections – 2040
Current Population Rate of Growth 2040 Population
City of Chehalis 7,350 1.25% 9,307
Chehalis UGA 2044 6.57% 7,298
Based on recent growth rates, the City and UGA combined will grow by 7,711 new residents by 2040.
Looking at the City’s UGA as a whole, and not just the southern UGA which would be contiguous to the
proposed UGA expansion areas, the City’s Comprehensive Plan estimates that of the entire 3,750 acres
in the UGA, approximately 497 acres are available for residential development (Land Use Element,
p.22). However, GIS analysis has shown that nearly 85% of the residential zoning in the UGA is
encumbered by critical areas, so that would leave just 75 acres available in the UGA as a whole for
residential development. Assuming there are 75 acres available in the entire UGA for future residential
development, and using the development ratios of single-family and multifamily referenced above,
combined with average household population, yields the following estimates of future capacity in the
UGA:
Residence type Percent of
Development
Acres Units per
Acre
Household Size Growth
Capacity
Single-family .69 51.75 4 2.46 509
Multi-family .31 23.25 12 2.46 686
TOTAL 100 75 N/A 2.46 1,195
The above table shows that the estimated residential land available in the UGA, combined with
development patterns and average household size, can accommodate 1,195 new residents, which
is 6,516 short of the projected growth of 7,711 for the City and UGA.
This proposed UGA expansion would add approximately 110 acres to the existing UGA. After
subtracting out critical areas, approximately 38 acres of the proposal area can be developed.
Assuming a development density of 12 units per acre, an additional 456 residential units could be
added to the housing stock.
Annexation and UGA Expansion Needs
The first obvious mechanism to accommodate future growth and to meet the population allocation,
especially when it is occurring in the UGA, is to annex some or all of the UGA into the City. This would
change the population ratios between the City and the UGA. Currently, the City is in the analysis phase
of completing a large portion of the UGA to the south. This area is comprised of 875 acres, which
represents 29% of the UGA. Although this area represents a significant portion of the City’s UGA, at 150
acres, only a small percentage is zoned for residential use. This is due in large part to the presence of the
Port of Chehalis in this part of the UGA:
Breen UGA Expansion
Page 5 of 9
Potential Annexation Area
150.00
119.00
174.00
128.00
46.00
71.00
23.00
Proposed Annexation Area -Use By Acres
Residential Commercial Retail Industrial Government Transportation Agriculture Undeveloped
Breen UGA Expansion
Page 6 of 9
A review of the Lewis County Assessor’s database shows that 89 acres of available residential acreage in
the southern UGA has already been developed, leaving at most 60 acres available, and it is not known
how much of the remaining acres may be encumbered by critical areas.
Based on the above analysis, while annexation will be a necessary component to accommodate the
City’s future growth, given the current land use designations – particularly the large area devoted to the
Port of Chehalis and land encumbered by critical areas – annexation will not be sufficient to
accommodate that growth. For this reason, UGA expansion is also warranted and necessary to provide
both commercial and residential growth beyond the current southern boundary of the City’s UGA.
More residential development opportunities are necessary to accommodate the 6.57% growth rate in
the UGA. Increased commercial and/or industrial development opportunities are warranted to keep
pace with the consumer demands that will accompany residential growth in the area.
3. If an expansion, indicate the future land uses you intend to incorporate into your city’s
Comprehensive Plan’s Future Land Use map.
The City envisions designating the expanded UGA area with a type of Mixed Use zoning that will
encourage a variety of commercial uses, combined with affordable housing, preferably multi-family.
4. If an expansion, describe your public facilities and services plan to serve the area within the
20-year planning cycle.
Fortunately, both sewer and water infrastructure are immediately adjacent to the site and available for
connection, as depicted on the map, below:
Sewer and Water
Breen UGA Expansion
Page 7 of 9
Water
The City has identified areas within the infrastructure that will be an impediment to providing water to
the Expansion area. There are two areas that need upgrading. The pump station at 18th street as well as
upgrading water lines from the pump station to handle more capacity. We also need to complete a
water main extension along Bishop Road for approximately 1,000 feet.
These necessary improvements are identified in the 2012 Water System Plan and the 2022 Capital
Improvement Plan. The City has also captured these items in the proposed Chehalis Water System Plan
that is currently being reviewed by the Washington Department of Health. The source of funding for
water system upgrades will be covered through the General Fund, grants and loans, and the
developers.
Under extreme ideal conditions, the City’s current water treatment plant is designed to produce 4.8
million gallons per day (MGD) during extremely favorable conditions, which are determined by water
flow and water quality. Typically, we draw 1.37 MGD. This leaves 3.4 MGD for growth.
While water capacity is not an issue for this Expansion area, to accommodate growth within the next
twenty years, the City is currently working with the City of Centralia and TransAlta to procure three (3)
MGD water rights to serve the community. The City is also in the process of purchasing water rights
from the Marwood Estate for .91 MGD. Both of these new water rights will require improvements to
our current infrastructure which is currently being examined by staff. Funding for this upgrade in
capacity and infrastructure has yet to be determined.
Sewer
The City of Chehalis serves sewer needs throughout the City and UGA under the Chehalis, Napavine,
Lewis County Sewer District #1 General Sewer Plan, 2001. This plan is slated to be updated in 2025. The
City has sufficient capacity within the treatment plant to serve the Expansion area. If development
triggers the need for infrastructure improvements, the developer will be responsible for paying and
installing it.
Chehalis Regional Water Reclamation Facility (CRWRF) has a maximum average monthly effluent water
reuse discharge of 3.5 million gallons per day (MGD) during “dry weather” when the Chehalis River is
below 1000 cubic feet per second on a 7-day average. The average annual flow in dry weather during
2020 was 1.36 MGD, serving 2950 households. This leaves 2.13 MGD dry weather discharge which is
“1.612 MGD” before a design upgrade is required. Plans to upgrade the current system will be triggered
if any of the design criteria exceed 85% for 3 consecutive months or is predicted within the next 5 years
to exceed 85%, as per DOE standards.
The City sewer main extends ‘to and through’ the proposed Expansion area where there is an inter tie
with the Napavine sewer system.
5. If an expansion, describe your transportation improvement plan to serve the area within the
20-year planning cycle.
Since the proposed UGA expansion area is currently in the County, the City of Chehalis has not been the
responsible entity for transportation planning. However, if the UGA request is granted, and when the
Breen UGA Expansion
Page 8 of 9
City annexes these areas, the transportation network will be folded into the City’s current
transportation planning and maintenance framework. This would include prioritizing any needed
improvements through the City’s annually adopted 6-year Transportation Improvement Plan, and
through the goals and objectives laid out in the City’s Comprehensive Plan Transportation Element.
The following response was provided by the City’s Public Works Department:
• The city’s list of arterials/collectors, roads that require frontage improvements inside city
limits, will need to be updated to include those roadways, if any, that will be annexed in to
city limits.
• If the road is inside the UGA, but not inside city limits, this is still legally a county road. The
county has jurisdiction over ROW permits and improvement requirements.
• The needs of any given roadway will be assessed by each project individually, where the
proposed project takes into account all development vested prior to their date of complete
application.
• Initially, a trip generation study is needed, if the average daily trips in the peak hour & the
peak direction are greater than 10, then a Traffic Impact Analysis is required. If the level of
service is negatively affected beyond an already established limit, then mitigation
measures are required for development.
• Mitigation measures can come in the form of stop lines, left turn lanes, right turn lanes, a
3rd middle turn lane, road widening, speed limit lowering, stop sign installation, traffic
signal installation, crosswalk delineation, the installation of curb/gutter/sidewalk.
• Because each and every project submitted presents their own unique set of challenges,
these mitigation measures must be considered individually for every project as it
specifically applies to the proposal brought forth.
It should be noted that the proposed UGA expansion area is in an area that is already well-
served by a transportation network suited to handle a high volume of traffic, with close access
to Interstate 5.
6. If an expansion, what environmental constraints exist within the area and how does the
City intend to address those within the 20-year planning cycle?
As depicted on the following map, the proposed UGA expansion area is partially encumbered
by wetlands and the floodplain of the Chehalis River.
NEXT PAGE
Breen UGA Expansion
Page 9 of 9
If the UGA expansion proposal is granted, the UGA will comply with WAC 365-196-310, which
provides limited allowances for the expansion of a UGA into a floodplain, including when:
“(C) The land is owned by a jurisdiction planning under this chapter or the rights to the
development of the land have been permanently extinguished, and the following criteria
are met:
(I) The permissible use of the land is limited to one of the following: Outdoor recreation;
environmentally beneficial projects including, but not limited to, habitat enhancement or
environmental restoration; stormwater facilities; flood control facilities; and
(II) The development and use of such facilities or projects will not decrease flood storage,
increase stormwater runoff, discharge pollutants to fresh or salt waters during normal
operations or floods, or increase hazards to people and property.” [WAC 365-196-310
(C)(I)(II)]
As a condition of UGA expansion, the City of Chehalis will be requiring all areas within the
floodplain to comply with the restrictions on development by requiring a conservation easement.
The conservation easement will distinguish development rights and only allow activities that are
provided for under the WAC, as listed above.