Loading...
Award contract to Olympic Roofing to remove and replace the Health building roof. BEFORE THE BOARD OF COUNTY COMMISSIONERS LEWIS COUNTY, WASHINGTON IN THE MATTER OF: RESOLUTION NO. 20-087 AWARD CONTRACT TO OLYMPIC ROOFING TO REMOVE AND REPLACE HEALTH BUILDING ROOF WHEREAS, the Health Building roof was in poor condition due to exceeding its expected lifespan. Also, due to years of combined layering, it must be removed prior to adding additional layers; and WHEREAS, Lewis County has requested bids via Small Works bid process for provision of such materials and labor necessary to meet the requirements, scope and specifications of said project and received the following bids from: Olympic Roofing of Federal Way, Wash. $121,650.00 Wright Roofing of Tacoma, Wash. $150,484.00 The Roof Dr. of Chehalis, Wash. S162,500.00 Scholten Roofing Inc of Lynden, Wash. $217,035.00 American Gntd. Roofing Gig Harbor, Wash. $230,558.00 Madsen Roofing Inc. of Lacey, Wash. $253,009.00; and WHEREAS, the bids have been reviewed by Facilities staff and appear to be responsive and meet the requirements of the project. NOW THEREFORE BE IT RESOLVED by the Board of County Commissioners (BOCC), that the County awards the contract for the Health Building Roof Replacement Project to Olympic Roofing of Federal Way, Wash; and NOW THEREFORE BE IT FURTHER RESOLVED that the Chief of Internal Services is hereby authorized to sign said contract on behalf of the BOCC. DONE IN OPEN SESSION this 9th day of March, 2020. APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS Jonathan Meyer, Prosecuting Attorney LEWIS COUNTY, WASHINGTON Kevin McDowell Gary Stamper By: Kevin McDowell, Gary Stamper, Chair Deputy Prosecuting Attorney ATTEST: •'�°°nTv.wqs,.• Edna J . Fund �S PRD OF // Rieva Lester, Clerk of the Board- ,0 'i Edna J. Fund, Vice Chair 'f...• NS° -01 Candace Hallom '•sy�",,Y��o,;.$6j.• Robert C. Jackson By: Candace Hallom Robert C.Jackson, Commissioner Aliiiitik. l Z „ (_,„r t I,z ,I,,r., ,,,,.,„,„...„ , , .<, , _ _ ,,,, . _ „ . 7WL4 !1 4.--- -2.--1111 OM Mg OW _1 ' .111_1:- j--1-1 IL I .._ . _ yq CONTRACT PACKET FOR: Public Health Building Roof Replacement Project Project #31-1909 OFFERED BY: LEWIS COUNTY FACILITIES DEPARTMENT FACILITIES DIVISION 571 NW Prindle Street Chehalis.WA 98532 Mailing Address: 351 NW North Street Chehalis WA 98532 Phone: 360-740-1192 Fax: 360-740-2720 CONTRACT PACKET CONTENTS 1. CHECKLIST 2. PLANS AND SPECIFICATIONS 3. FACILTIES DEPARTEMENT CONTRACT/GENERAL CONDITIONS/SPECIAL CONDITIONS 4. PREVAILING WAGE NOTICE 5. PERFORMANCE BOND 6. CERTIFICATE OF INSURANCE 7. NON COLLUSION AFIDAVIT 8. BID FORM • DOCUMENT CHECK LIST (Lewis County Forms Only) The following items must be returned in the completed bid package: I. Signed Contract 2. Performance Bond 3. Certificate of Insurance 3 • Project Scope and Specifications SCOPE OF WORK 1. Remove old roofing material from roof of Public Health Building and corresponding areas and abate asbestos containing materials(ACM).(See attached drawings).Work shall be in accordance with Manufacturer's Specifications. 2. Remove and repair area roofing for installation of new drains and membrane roofing.Work shall be in accordance with Manufacturer's Specifications and rules,laws and standards regulating the removal and disposal of ACM. Abatement contractor shall supply chain of custody and disposal records. 3. Remove abandoned equipment including satellite dish,accessories and or conduit.(Verify with owner prior to demolition) 4. Repair roof area for safety,and proper installation of membrane. 5. Install insulation board to meet current code requirements. 6. Install new PVC membrane roofing materials according to manufacturer's specifications and guidelines.(See attached generic specifications and drawings for areas to be included in scope) 7. Where necessary install crickets,water bars and other features for roof area for proper drainage,min slope 1/8" per foot. 8. Apply and install new and approved blocking for HVAC units and on other items identified by owner. Contractor must evaluate and determine proper removal of existing roofing system and determine if the existing substrate can be prepared properly for the new roof according to the manufacturer's specification. Before/after photos must be submitted with invoice upon completion. On all bids,there must be deck square footage and a separate line item of parapet square footage.Please provide an Engineered Layout Drawing supplied by Manufacturer Engineering of the proposed section(s)to be completed. Submit photos with bid if possible. Pull out tests are required per manufacturer specifications for wind uplift,proper fastener selection,and spacing. Please provide ASCE7 Calculations completed by Manufacturer Engineering Department with proposal. Properly remove and dispose of existing asphalt roofing system and prepare substrate for new roofing system. Install new 32 Mil Vapor Barrier over properly prepared substrate. Install new Min R-38, ''A"slope,20PSI,Coated Glass Polyisocyanurate Tapered Insulation system adhered over vapor barrier to drain. System to be adhered with 2-part Urethane adhesive set in ribbons or beads per roof membrane manufacturer specifications to roof deck areas. Insulation to be purchase from and part of membrane manufacturer system warranty. Install Vs"Prime,Gypsum Coverboard directly over taper system. To be adhered with 2-part Urethane adhesive set in ribbons or beads per roof membrane manufacturer specifications to roof deck areas. Insulation to be purchase from and part of membrane manufacturer system warranty. Contractor shall furnish and install a white minimum 50 mil,internally reinforced Custom Fabricated Roofing system including all components from Manufacturer. **Install Factory Engineered Deck Sheets to largest size possible relating to project roof deck and to reduce/minimize field welding wherever possible.Membrane to be adhered with approved adhesive to achieve manufacturer 20Y NDL Warranty.Square Footage for Deck and Parapet should be on the bid. On all parapet locations,remove existing coping cap and dispose. If necessary build up perimeter to proper height. Wrap parapet with new pre-manufactured parapet flashings by Manufacturer and terminate up and over exterior of wall. Use new#24 Gauge,Grade 50,ES-1 Compliant,Kynar 500 Coated,Metal Parapet Cap/fascia System Terminations by Manufacturer of Roofing System,color to match existing metal as close as possible,whenever possible. All curbs,deck sheets and parapets must be pulled tight and installed as wrinkle free as possible. Contractor to insure proper drainage of the new roof system,wherever prudent and possible;however,ponding water must not affect the Roof System/Manufacturer Warranty. If necessary to insure proper drainage,contractor should include an alternate price of installing a new tapered insulation system and new drains or scuppers.Clean out and remove any debris to insure through wall drains,gutters and downspouts are free flowing. Install Custom pre-manufactured flashings on all roof penetrations as specified by roof membrane manufacturer, including all through wall drains. All custom curbs,drains,and stack flashings will be made of the same mil thickness and reinforcement as the deck membrane or Vinyl coated metal from membrane manufacturer. Create a plan for walk pad to service center of roof from access door. Furnish and install new 30"x 60"Roof Trac III walkway pads at all serviceable rooftop units and skylights. Install at the entry point(s),and around a serviceable access panel. Manufacturer walk pads should be installed by welding the six inch skirts completely to the deck membrane with a full 1-1/2"weld to prevent the walk pads from dislodging. Inspect all skylights. Provide replacement Alternate option(s)if necessary per IBC 21012 or local codes with Membrane Manufacturer total system options. Furnish and install size compatible membrane manufacturer Custom Fabricated Flashings. Inspect HVAC Screen(s)Communicate with owner's rep to be completed by others. Curbing to be minimum 8"and flash properly to create watertight,Code/Manufacturer approved termination. Install new 4x4 pressure treated wood used for sleepers. E.g.gas pipes,AC units,Etc. if necessary Contractor must install the roofing system and dispose of all debris"OFF SITE"in accordance with all local,state,and federal regulations. Contractor is responsible for locating existing conduit to avoid penetration during installation. Contractor is solely responsible for damage caused to electrical conduit from penetration during roof installation,and related costs of repairing/replacing conduit or related equipment damaged as a result of penetrating electrical conduit. After the installation is complete,a Membrane Manufacturer Technical Representative shall inspect the visible details of the roofing system for acceptability of warranty issuance. Any deficiencies shall be corrected by the Contractor and made ready for re-inspection within five(5)working days. Upon acceptance,the Manufacturer 20 year NDL Workmanship and Material warranty,including"Consequential Damages",shall be promptly issued. One copy to the owner. The contractor selected to complete the re-roofing project will be required to: Set up final inspection with technical and call for any deviations to engineering. Alternate Bids: Include separate alternate bids for any of the following conditions(include pictures of existing conditions that require alternate bids): If the existing substrate requires modification or repair. Please provide time and material line in your proposal for such occurrences. Please provide a contingency within this years' budget. List the height and quantity of any existing curbs that are shorter than eight inches(8")above the deck. Include a cost of raising the curbs to meet roofing manufacturer's specifications. Inspect all HVAC units, including ductwork,and include an alternate bid to repair or replace any HVAC equipment that is allowing water to penetrate the roofing system. Include a price to run all condensate lines to an existing drain or scupper. WARRANTY Manufacturer 20 year NDL Workmanship and Material warranty, including "Consequential Damages". One copy to the owner. 4 . LEWIS COUNTY AGREEMENT GENERAL TERMS AND CONDITIONS AGREEMENT EFFECTIVE DATE: , hereinafter called CONTRACTOR, and LEWIS COUNTY, hereinafter called COUNTY, agree as set forth in this Agreement, including: Scope of Work, Specifications, Compensation, Bid Response forms, General and Special Conditions, copies of which are attached hereto and incorporated herein by this reference as fully as if set forth herein. Project: Health Building Roof Replacement Project Bid Price (with accepted alternates: The term of this Agreement shall commence upon the date of execution as shown above. This agreement may be renewed or terminated upon written notice provided either by the County or the service provider thirty(30) or more days prior to the effective date of renewal or termination. CONTRACTOR acknowledges and by signing this contract agrees that the Indemnification provisions set forth in Paragraphs 5, 14, 20, 21, 24 and 25, are totally and fully part of this contract and have been mutually negotiated by the parties. IN WITNESS WHEREOF, the parties have executed this Agreement this day of 2016. CONTRACTOR: LEWIS COUNTY Steve Wohld Lewis County,Chief of Internal Services Title of Signatory Authorized by the firm By Laws Mailing Address: Approved as to Form Only: Jonathan Meyer, Prosecuting Attorney • By: Deputy Prosecuting Attorney UBI or Contractors License# Federal Business Tax ID No. GENERAL CONDITIONS 1. Scope of Contractors Services: The Contractor agrees to provide to the County services and any material set forth in the project narrative identified as Exhibit"A"during the agreement period. No material,labor,or facilities will be furnished by the County,unless otherwise provided for in the Agreement. 2. Accounting and Payment for Contractor Services: Payment to the Contractor for services rendered under this Agreement shall be as set forth in Exhibit "B". Where Exhibit "B" requires payments by Lewis County, payment shall be based upon billings, supported unless otherwise provided in Exhibit "B", by documentation of units of work actually performed and amounts earned, including where appropriate,the actual number days worked each month,total number of hours for the month, and total dollar payment requested. Unless specifically stated in Exhibit "B" or approved in writing in advance by the official executing this Agreement for Lewis County (hereinafter referred to as the "Contracting Officer"), the County will not reimburse the Contractor for any costs or expenses incurred by the Contractor in the performance of this contract. Where required,the County shall, upon receipt of appropriate documentation, compensate the Contractor, no more often than weekly; through the County voucher system for the Contractor's service pursuant to the fee schedule set forth in Exhibit"B". 3. Assignment and Subcontracting: No portion of this contract may be assigned or subcontracted to any other individual, firm or entity without the express and prior written approval of the Contracting Officer or as set forth in Exhibit"A". 4. Labor Standards and Contract Assistance: The Contractor shall comply with the provisions of the Lewis County Contract and Procurement Assistance Program as applicable,attached hereto as"Special Conditions". 5. Independent Contractor: The Contractor's services shall be furnished by the Contractor as an independent Contractor and nothing herein contained shall be construed to create a relationship of employer-employee or master-servant, but all payments made hereunder and all services performed shall be made and performed pursuant to this Agreement by the Contractor as an independent Contractor. The Contractor acknowledges that the entire compensation for this Agreement is specified in Exhibit "B" and the Contractor is not entitled to any County benefits including,but not limited to: vacation pay,holiday pay,sick leave pay,medical,dental,or other insurance benefits,or any other rights or privileges afforded to Lewis County employees. Contractor will defend, indemnify and hold harmless the County, its officers, agents or employees from any loss or expense, including but not limited to settlements,judgments, setoffs, attorneys' fees or costs incurred by reason of claims or demands because of breach of the provisions of this paragraph. 6. No Guarantee of Employment: The performance of all or part of this contract by the Contractor shall not operate to vest any employment rights whatsoever and shall not be deemed to guarantee any employment of the Contractor or any employee of the Contractor or any subcontractor or any employee of any subcontractor by the County at the present time or in the future. 7. Taxes: The Contractor understands and acknowledges that the County will not withhold Federal or State income taxes. Where required by State or Federal law,the Contractor authorizes the County to make withholding for any taxes other than income taxes (i.e., Medicare). All compensation received by the Contractor will MOW be reported to the Internal Revenue Service at the end of the calendar year in accordance with the applicable IRS regulations. It is the responsibility of the Contractor to make the necessary estimated tax payments throughout the year,if any,and the Contractor is solely liable for any tax obligation arising from the Contractor's performance of this Agreement. The Contractor hereby agrees to indemnify the County against any demand to pay taxes arising from the Contractor's failure to pay taxes on compensation earned pursuant to this Agreement. The County will pay sales and use taxes imposed on goods or services acquired hereunder as required by law. The Contractor must pay all other taxes including,but not limited to: Business and Occupation Tax, taxes based on the Contractor's gross or net income, or personal property to which the County does not hold title. The County is exempt from Federal Excise Tax. 8. Regulations and Requirement: This Agreement shall be subject to all laws,rules,and regulations of the United States of America,the State of Washington,and political subdivisions of the State of Washington,and to any other provisions set forth in Special Conditions. 9. Prevailing Wages Contractor shall pay the prevailing rate of wages to all workers,laborers,or mechanics employed in the performance of any part of the Work in accordance with RCW 39.12 and the rules and regulations of the Department of Labor and Industries. The schedule of prevailing wage rates for the locality or localities of the Work, is determined by the Industrial Statistician of the Department of Labor and Industries. It is the Contractor's responsibility to verify the applicable prevailing wage rate. Each Application for Payment submitted by Contractor shall state that prevailing wages have been paid in accordance with the pre-filed statement(s)of intent,as approved.Copies of the approved intent statement(s)shall be posted on the job site with the address and telephone number of the Industrial Statistician of the Department of Labor and Industries where a complaint or inquiry concerning prevailing wages may be made. In compliance with chapter 296-127 WAC,Contractor shall pay to the Department of Labor and Industries the currently established fee(s)for each statement of intent and/or affidavit of wages paid submitted to the Department of Labor and Industries for certification. 10. Right to Review: This contract is subject to review by any Federal or State auditor. The County or its designee shall have the right to review and monitor the financial and service components of this program by whatever means are deemed expedient by the Contracting Officer. Such review may occur with or without notice,and may include,but is not limited to,on-site inspection by County agents or employees,inspection of all records or other materials which the County deems pertinent to the Agreement and its performance, and any and all communications with or evaluations by service recipients under this Agreement. The Contractor shall preserve and maintain all financial records and records relating to the performance of work under this Agreement for 3 years after contract termination, and shall make them available for such review, within Lewis County,State of Washington,upon request. 11. Modifications: Either party may request changes in the Agreement. Any and all agreed modifications shall be in writing, signed by each of the parties. 12. Termination for Default: If the Contractor defaults by failing to perform any of the obligations of the contract or cannot perform because of regulatory order or failure to comply with regulatory requirements, including but not limited to applicable licensing laws, or becomes insolvent or is declared bankrupt or commits any act of bankruptcy- or insolvency or make an assignment for the benefit of creditors, the County may, by depositing written notice to the Contractor in the U.S. mail, postage prepaid, terminate the contract, and at the County's option,obtain performance of the work elsewhere. If the contract is terminated for default, the Contractor shall not be entitled to receive any further payments under the contract until work called for, as may be applicable under Exhibit"A", has been fully performed. Any extra cost or damage to the County resulting from such default(s) shall be deducted from any money due or coming due to the Contractor. The Contractor shall bear any extra expenses incurred by the County in completing the work, as may be applicable under Exhibit "A", including all increased costs for completing the work, and all damage sustained,or which may be sustained by the County by reason of such default. If a notice of termination for default has been issued and it is later determined for any reason that the Contractor was not in default, the rights and obligations of the parties shall be the same as if the notice of termination had been issued pursuant to the Termination for Public Convenience paragraph hereof. 13. Termination for Public Convenience: The County may terminate the contract in whole or in part whenever the County determines, in its sole discretion, that such termination is in the interests of the County. Whenever the contract is terminated in { accordance with this paragraph, the Contractor shall be entitled to payment for actual work performed at unit contract prices for completed items of work. An equitable adjustment in the contract price for partially completed items of work will be made,but such adjustment shall not include provision for loss of anticipated profit on deleted or uncompleted work. Termination of this contract by the County at any time during the term, whether for default or convenience, shall not constitute a breach of contract by the County. 14. Defense&Indemnity Agreement. To the fullest extent permitted by Iaw,the Contractor agrees to indemnify,defend and hold the County and its departments,elected and appointed officials,agents,and volunteers,harmless from and against any and all claims,damages,losses and expenses,including but not limited to court costs,attorney's fees and alternative dispute resolution costs,for any personal injury,for any bodily injury,sickness,disease or death and for any damage to or destruction of any property(including the loss of use resulting therefrom) which 1)are caused in whole or in part by any act or omission,negligent or otherwise,of the Contractor, its employees,agents or volunteers,and/or Contractor's subcontractors and their employees,agents or volunteers;or 2)are directly or indirectly arising out of,resulting from or in connection with performance of this Agreement;or 3)are based upon the Contractor's or its subcontractors'use of,presence upon or proximity to the property of the County. This indemnification obligation of the Contractor shall not apply if the claim,damage, loss or expense is caused by the sole negligence of the County. This indemnification obligation shall not be limited in any way by the Washington State Industrial Insurance Act,RCW Title 51,or by application of any other workmen's compensation act,disability benefit act or other employee benefit act,and the Contractor hereby expressly waives any immunity afforded by such acts. The foregoing indemnification obligations of the Contractor are a material inducement to County to enter into this Agreement,are reflected in the Contractor's compensation,and have been mutually negotiated by the Parties. Contractor's initials acknowledging indemnity terms: 15. Participation by County—Right to participate; Survival of Contractor's Indemnity Obligations; Indemnity for Subcontractors. The County reserves the right,but not the obligation,to participate in the defense of any claim,damages, losses or expenses and any such participation shall not constitute a waiver of Contractor's indemnity obligations under this Agreement. The Contractor agrees all Contractor's indemnity obligations shall survive the completion,expiration or termination of this Agreement. In the event the Contractor enters into subcontracts to the extent allowed under this Agreement,the Contractor shall include as a requirement in each such contract that Contractor's subcontractors shall indemnify the County on a basis equal to or exceeding Contractor's indemnity obligations to the County. 16. Venue and Choice of Law: In the event that any litigation should arise concerning the construction or interpretation of any of the terms of this Agreement, the venue of such action of litigation shall be in the courts of the State of Washington in and for the County of Lewis. This Agreement shall be governed by the law of the State of Washington. 17. Withholding Payment: In the event the Contractor has failed to perform any substantial obligation to be performed by the Contractor under this Agreement and said failure has not been cured within the times set forth in this Agreement, then the County may,upon written notice,withhold all monies due and payable to Contractor, without penalty,until such failure to perform is cured or otherwise adjudicated. 18. Payment and Performance Bond Payment and performance bonds for 100%of the Contract Sum,including all Change Orders and state sales tax,shall be furnished for the Work,and shall be in a form acceptable to the Owner. No payment or performance bond is required if the Contract Sum is S35,000 or less and Contractor agrees that Owner may,in lieu of the bond,retain 50%of the Contract Sum for the period allowed by RCW 39.08.010. 19 Future Non-Allocation of Funds: If sufficient funds are not appropriated or allocated for payment under this contract for any future fiscal period, the County will not be obligated to make payments for services or amounts incurred after the end of the current fiscal period. No penalty or expense shall accrue to the County in the event this provision applies. 20. Contractor Commitments,Warranties and Representations: Any written commitment received from the Contractor concerning this Agreement shall be binding upon the Contractor, unless otherwise specifically provided herein with reference to this paragraph. Failure of the Contractor to fulfill such a commitment shall render the Contractor liable for damages to the County. A commitment includes, but is not limited to any representation made prior to execution of this Agreement, whether or not incorporated elsewhere herein by reference, as to performance of services or equipment,p6ces or options for future acquisition to remain in effect for a fixed period,or warranties. 21. Patent/Copyright Infringement: Contractor will defend and indemnify the County from any claimed action,cause or demand brought against the County,to the extent such action is based on the claim that information supplied by the Contractor infringes any patent or copyright.The Contractor will pay those costs and damages attributable to any such claims that are finally awarded against the County in any action. Such defense and payments are conditioned upon the following: a. That Contractor shall be notified promptly in writing by County of any notice of such claim. b. Contractor shall have the right, hereunder,at its option and expense, to obtain for the County the right to continue using the information in the event such claim of infringement is made, provided no reduction in performance or loss results to the County. 22. Disputes: • A. General Differences between the Contractor and the County, arising under and by virtue of the Contract Documents shall be brought to the attention of the County at the earliest possible time in order that such matters may be settled or other appropriate action promptly taken. Except for such objections as are made of record in the manner hereinafter specified and within the time limits stated, the records, orders, rulings, instructions, and decisions of the Contracting Officer, shall be final and conclusive. • B. Notice of Potential Claims The Contractor shall not be entitled to additional compensation which otherwise may be payable, or to extension of time for(1)any act or failure to act by the Contracting Officer or the County, or (2)the happening of any event or occurrence,unless the Contractor has given the County a written Notice of Potential Claim within 10 days of the commencement of the act,failure, or event giving rise to the claim, and before final payment by the County. The written Notice of Potential Claim shall set forth the reasons for which the Contractor believes additional compensation or extension of time is due, the nature of the cost involved, and insofar as possible, the amount of the potential claim. Contractor shall keep full and complete daily records of the Work performed, Labor and material used,and all costs and additional time claimed to be additional. C. Detailed Claim The Contractor is not entitled to claim any such additional compensation, or extension of time, unless within 30 days of the accomplishment of the portion of the work from which the claim arose, and before final payment by the County, the Contractor has given the County a detailed written statement of each element of cost or other compensation requested and of all elements of additional time required, and copies of any supporting documents evidencing the amount or the extension of time claimed to be due. 23. Ownership of Items Produced: All writings, programs, data, public records or other materials prepared by the Contractor and/or its consultants or subcontractors, in connection with the performance of this Agreement shall be the sole and absolute property of the County. • 24. Confidentiality: In the event that the Contractor comes in contact with or obtains knowledge of confidential information, the Contractor shall maintain the confidentiality of all obtained information provided by the County or acquired by the Contractor in performance of this Agreement,except upon the prior written consent of the Lewis County Prosecuting Attorney or an order entered by a court after having acquired jurisdiction over the County. Contractor shall immediately give to the County notice of any judicial proceeding seeking disclosure of such information. Contractor shall indemnify and hold harmless the County, its officials, agents or employees from all loss or expense, including,but not limited to settlements,judgments,setoffs, attorneys'fees and costs resulting from Contractor's breach of this provision. 25. Notice: Except as set forth elsewhere in the Agreement, for all purposes under this Agreement, except service of process,notice shall be given by the Contractor to the Contract Manager for whom services are rendered, • to wit: Steve Wohld, Chief of Internal Services, 351 NW North Street,Chehalis, Washington 98532-1900. Notice to the Contractor for all purposes under this Agreement shall be given to the address reflected above. Notice may be given by delivery or by depositing in the US Mail,first class,postage prepaid. 26. Severability: If any term or condition of this contract or the application thereof to any person(s)or circumstances is held invalid, such invalidity shall not affect other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this contract are declared severable. 27. Waiver: Waiver of any breach or condition of this contract shall not be deemed a waiver of any prior or subsequent breach. No term or condition of this contract shall be held to be waived,modified or deleted except by an instrument,in writing,signed by the parties hereto. 28. Survival: The provisions of paragraphs 5,7,9, 11, 12, 13, 14, 15, 17, 18, 19,20,21,22,24 and 25,and the provisions of any non-collusion affidavit required by paragraph 4,shall survive,notwithstanding the termination or invalidity of this Agreement for any reason. 29. Entire Agreement: This written contract represents the entire Agreement between the parties and supersedes any prior oral statements,discussions or understandings between the parties. SPECIAL CONDITIONS A. Definitions The COUNTY is the recipient of CONTRACTOR'S services, and at all times acts through its Board of County Commissioners. The Contracting Officer of the COUNTY will be Chief of Internal Services,or his designee. Contractor Registration The CONTRACTOR agrees and covenants to furnish unto the COUNTY proper evidence that the CONTRACTOR has fully complied with the State Licensing Law. CONTRACTOR shall include his contractor's license number in the space provided on the front page of this Agreement. C. Non-Discrimination(Lewis County Funds) The CONTRACTOR should be aware that public funds are being used to assist in this project. During the performance of this contract,the CONTRACTOR agrees as follows: 1. The CONTRACTOR will not discriminate against any employee or applicant for employment because of race, creed, color, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The CONTRACTOR agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this non- discrimination clause. 2. The CONTRACTOR will,in all solicitations or advertisements for employees placed by or on behalf of the CONTRACTOR,state that all qualified applicants will receive consideration for employment without regard to race,creed,color,or national origin. 3. The CONTRACTOR will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, notice to be provided by the agency contracting officer, advising the labor union or worker's representative of the contractor's commitments under Section 202 or Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in a conspicuous place available to employees and applicants for employment. 4. The CONTRACTOR will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules,regulations and relevant orders of the Secretary of Labor. 5. The CONTRACTOR will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules,regulations, and orders of the Secretary of Labor,or pursuant thereto, and will permit access to his books and records for purposes of investigation to ascertain compliance with such rules,regulations and orders 6. In the event of the CONTRACTOR'S non-compliance with the non-discrimination clauses of this contract or with any such rules, regulations, or orders, this contract may be canceled,terminated or suspended in whole or in part and the contract may be declared ineligible for further government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order No. 11246 of September 24, 1 965, or by rule,regulation or order of the Secretary of Labor,or as otherwise provided by law. 7. The CONTRACTOR will include the provisions of Paragraphs (1) through (7) in every sub-contract or purchase order unless exempted by rules, regulations or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order No. 11246 of September 24, 1 965, so that such provisions will be binding upon each sub-contract or vendor. The CONTRACTOR will take such action with respect to any sub- contract or purchase order as the contracting agency may direct as a means of enforcing such provisions, including sanctions for non-compliance: Provided, however, that in the event the CONTRACTOR becomes involved in, or is threatened with litigation with a sub-contractor or vendor as a result of such direction by the contracting agency, the CONTRACTOR may request the United States to enter into such litigation to protect the interest of the United States. D. Original Specifications It is hereby expressly agreed by and between the parties involved that in any matter, dispute, suit, or proceedings arising or in any way growing out of this contract in which it may be necessary to introduce into evidence the original of such specifications,that a printed copy thereof may be used in lieu thereof with like force and effect as though the original was produced. E. Eight Hour Law and Payment for Labor The CONTRACTOR agrees to comply with RCW chapter 49.28 providing that no laborer, workman or mechanic in the employ of the CONTRACTOR, sub-contractor, or other person doing or contracting to do the whole or any part of the work contemplated by this contract, shall be permitted or required to work more than eight(8)hours in any one calendar day,provided that, in cases of extraordinary emergency, such danger to life or property,the hours of work may be extended,but in such cases the rate of pay for time employed in excess of eight(8) hours of each calendar day shall not be less than one and one-half times the rate allowed for this same amount of time during eight (8) hours' service. Any work necessary to be performed after regular working hours, or Sunday or legal holidays shall be performed without additional expense to the COUNTY. Notwithstanding the above provisions,a CONTRACTOR may enter into an agreement approved by the employees in which the employees may work up to ten(10)hours in a calendar day for not more than four(4)calendar days in a week. CONTRACTOR further agrees that said contract is terminable in case the CONTRACTOR shall violate the provisions of such act. The CONTRACTOR,and sub-contractors shall further verify that: 1. He had not employed or retained any company or person(other than a full time bona fide employee working solely for the offeror)to solicit or receive this contract;and 2. He has not paid or agreed to pay any company or person(other than a full-time bona.fide employee working solely for the offeror) any fee, commission, percentage, or brokerage fee contingent upon or resulting from the award of this contract;and 3. He has not been asked or otherwise coerced, whether expressed or implied, into contributing funds, for any purpose as a condition to doing business with the COUNTY. It is further agreed that in case any dispute arises as to what are the prevailing wages for the work of a similar nature and such dispute cannot be adjusted by the parties involved, the matter shall be referred for arbitration to the Director of the Department of Labor&Industries of the State and his decision therein shall be final,binding,and conclusive on all parties. F. The parties agree that this agreement and CONTRACTOR'S work does not create or imply a license agreement for the use of software,code, or a computer program. CONTRACTOR agrees that COUNTY shall have the sole and exclusive ownership of all rights, title, and interest in all software,written code, computer programs created or written by CONTRACTOR and that COUNTY has the right of unlimited use of the software,code and programs, including reproduction,modification and sale. CONTRACTOR denies any proprietary rights, including copyrights, trademarks, trade secrets, or intellectual property rights,to any software,code or program. G. Contractor warrants that the computer code, software, or computer program installed by CONTRACTOR is not patented or copyrighted. CONTRACTOR will defend and indemnify the COUNTY from any claim, cause or demand brought against the COUNTY based upon copyright or patent of the software,computer code,or computer program installed by CONTRACTOR. 1 a i 5 • Notice PrevailingWageRequirement This project has been determined to be"Public Works"as defined by RCW 39.04 and WAC 296-127 and is subject to Washington State Prevailing Wage Laws. Current Prevailing Wage Rates for work performed in Lewis County are attached. These rates may not apply to work performed outside Lewis County. In addition, successful Contractor may be required to produce Certified Payroll Records upon request. State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 1/10/2020 County Trade Job Classification Wage Holiday Overtime Note *Risk Class Lewis Asbestos Abatement Journey Level $50.86 5D 1H View Workers Lewis Boilermakers Journey Level $69.04 5N 1C View Lewis Brick Mason Journey Level $58.82 5A 1M View Lewis Brick Mason Pointer-Caulker-Cleaner $58.82 5A 1M View Lewis Building Service Employees Janitor $13.50 1 View Lewis Building Service Employees Shampooer $13.50 1 View Lewis Building Service Employees Waxer $13.50 1 View Lewis Building Service Employees Window Cleaner $13.50 1 View Lewis Cabinet Makers (In Shop) Journey Level $23.17 1 View Lewis Carpenters Acoustical Worker $62.44 7A 4C View Lewis Carpenters Carpenter $62.44 7A 4C View Lewis Carpenters Carpenters on Stationary $62.57 7A 4C View Tools Lewis Carpenters Creosoted Material $62.54 7A 4C View Lewis Carpenters Floor Finisher $62.44 7A 4C View Lewis Carpenters Floor Layer $62.44 7A 4C View Lewis Carpenters Scaffold Erector $62.44 7A 4C View Lewis Cement Masons Application of all $62.97 7A 4U View Composition Mastic Lewis Cement Masons Application of all Epoxy $62.47 7A 4U View Material Lewis Cement Masons Application of all Plastic $62.97 7A 4U View Material Lewis Cement Masons Application of Sealing $62.47 7A 4U View Compound Lewis Cement Masons Application of $62.97 7A 4U View Underlayment Lewis Cement Masons Building General $62.47 7A 4U View Lewis Cement Masons Composition or Kalman $62.97 7A 4U View ` Floors Lewis Cement Masons Concrete Paving $62.47 7A 4U View Lewis Cement Masons Curb Et Gutter Machine $62.97 7A 4U View Lewis Cement Masons Curb Et Gutter. Sidewalks $62.47 7A 4U View Lewis Cement Masons Curing Concrete $62.47 7A 4U View Lewis Cement Masons Finish Colored Concrete $62.97 7A 4U View Lewis Cement Masons Floor Grinding $62.97 7A 4U View Lewis Cement Masons Floor Grinding/Polisher $62.47 7A 4U View (Lewis Cement Masons Green Concrete Saw, $62.97 7A 4U View self-powered Lewis Cement Masons Grouting of all Plates $62.47 7A 4U View Lewis Cement Masons Grouting of all Tilt-up $62.47 7A 4U View Panels Lewis Cement Masons Gunite Nozzleman $62.97 7A 4U View Lewis Cement Masons 'Hand Powered Grinder $62.97 7A 4U View Lewis Cement Masons Journey Level $62.47 7A 4U View Lewis Cement Masons Patching Concrete $62.47 7A 4U View Lewis Cement Masons Pneumatic Power Tools $62.97 7A 4U View Lewis Cement Masons Power Chipping Et $62.97 7A 4U View Brushing Lewis Cement Masons Sand Blasting $62.97 7A 4U View Architectural Finish Lewis Cement Masons Screed Et Rodding $62.97 7A 4U View Machine Lewis Cement Masons Spackling or Skim Coat $62.47 7A 4U View Concrete Lewis Cement Masons Troweling Machine $62.97 7A 4U View Operator Lewis Cement Masons Troweling Machine $62.97 7A 4U View Operator on Colored Slabs Lewis Cement Masons Tunnel Workers $62.97 7A 4U View Lewis Divers a Tenders Bell/Vehicle or $116.20 7A 4C View Submersible Operator (Not Under Pressure) Lewis Divers a Tenders Dive Supervisor/Master $79.23 7A 4C View Lewis Divers Et Tenders Diver $116.20 7A 4C 8V View Lewis Divers Et Tenders Diver On Standby $74.23 7A 4C View Lewis Divers Et Tenders Diver Tender $67.31 7A 4C View Lewis Divers Et Tenders Manifold Operator $67.31 7A 4C View Lewis Divers Et Tenders Manifold Operator Mixed $72.31 7A 4C View Gas Lewis Divers & Tenders Remote Operated Vehicle $67.31 7A 4C View Operator/Technician Lewis Divers & Tenders Remote Operated Vehicle $62.69 7A 4C View Tender Lewis Dredge Workers Assistant Engineer $56.44 5D 3F View Lewis Dredge Workers Assistant Mate $56.00 5D 3F View (Deckhand) Lewis Dredge Workers Boatmen $56.44 5D 3F View Lewis Dredge Workers Engineer Welder $57.51 5D 3F View Lewis Dredge Workers Leverman, Hydraulic $58.67 5D 3F View Lewis Dredge Workers Mates $56.441' 5D 3F View Lewis Dredge Workers Oiler $56.00 5D 3F View Lewis Drywall Applicator Journey Level $62.447 5D 1H View Lewis Drywall Tapers Journey Level $62.94 5P 1E View Lewis Electrical Fixture Journey Level $13.50 1 View Maintenance Workers Lewis Electricians - Inside Cable Splicer $74.69 5C 1G View Lewis Electricians - Inside Journey Level $69.96 5C 1G View Lewis Electricians - Inside Lead Covered Cable $79.41 5C 1G View Splicer Lewis Electricians - Inside Welder $74.69 5C 1G View Lewis Electricians - Motor Shop Craftsman $15.37 1 View Lewis Electricians Motor Shop Journey Level $14.69 1 View Lewis Electricians - Powerline Cable Splicer $79.60 5A 4D View Construction Lewis Electricians - Powerline Certified Line Welder $72.98 5A 4D View Construction Lewis Electricians - Powerline Groundperson $47.94 5A 4D View Construction Lewis Electricians - Powerline Heavy Line Equipment $72.981 5A 4D View Construction Operator Lewis Electricians - Powerline Journey Level Lineperson $72.981 5A 4D View Construction Lewis Electricians - Powerline Line Equipment Operator $62.06 5A 4D View Construction Lewis Electricians - Powerline Meter Installer $47.94 5A 4D 8W View Construction Lewis Electricians - Powerline Pole Sprayer $72.98 5A 4D View Construction Lewis Electricians - Powerline Powderperson $54.55 5A 4D View Construction Lewis Electronic Technicians Journey Level $44.70 6Z 1 B View Lewis Elevator Constructors Mechanic $94.22 7D 4A View Lewis Elevator Constructors Mechanic In Charge $101.73 7D 4A View Lewis Fabricated Precast Journey Level $13.50 1 View Concrete Products Lewis Fabricated Precast Journey Level - In- $13.50 1 View Concrete Products Factory Work Only Lewis Fence Erectors Fence Erector $43.11 7A 4V 8Y View Lewis Fence Erectors Fence Laborer $43.11 7A 4V 8Y View Lewis Flaggers Journey Level $43.11 7A 4V 8Y View Lewis Glaziers Journey Level $66.51 7L 1Y View Lewis Heat a Frost Insulators And Journeyman $76.61 5J 4H View Asbestos Workers Lewis Heating Equipment Journey Level $85.88 7F 1E View Mechanics Lewis Hod Carriers a Mason Journey Level $52.44 7A 4V 8Y View Tenders Lewis Industrial Power Vacuum Journey Level S13.50 1 View Cleaner Lewis Inland Boatmen Boat Operator $61.41 5B 1K View Lewis Inland Boatmen Cook $56.48 5B 1K View Lewis Inland Boatmen Deckhand $57.48 5B 1K View Lewis Inland Boatmen Deckhand Engineer $58.81 5B 1K View Lewis Inland Boatmen Launch Operator $58.89 5B 1K View Lewis Inland Boatmen Mate $57.31 5B 1K View Lewis Inspection/Cleaning/Sealing Cleaner Operator, $13.50 1 View Of Sewer Et Water Systems Foamer Operator By Remote Control Lewis Inspection/Cleaning/Sealing Grout Truck Operator $13.50 1 View Of Sewer I* Water Systems By Remote Control Lewis Inspection/Cleaning/Sealing Head Operator $13.50 1 View Of Sewer Ft Water Systems By Remote Control Lewis Inspection/Cleaning/Sealing Technician $13.50 1 View Of Sewer a Water Systems By Remote Control Lewis Inspection/Cleaning/Sealing Tv Truck Operator $13.50 1 View Of Sewer 8 Water Systems By Remote Control Lewis Insulation Applicators Journey Level $62.44 7A 4C View Lewis Ironworkers Journeyman $72.18 7N 10 View Lewis Laborers Air, Gas Or Electric $50.86 7A 4V 8Y View Vibrating Screed Lewis Laborers Airtrac Drill Operator $52.44 7A 4V 8Y View Lewis Laborers Ballast Regular Machine $50.86 7A 4V 8Y View Lewis Laborers Batch Weighman $43.11 7A 4V 8Y View Lewis Laborers Brick Pavers $50.86 7A 4V 8Y View Lewis Laborers Brush Cutter $50.86 7A 4V 8Y View Lewis Laborers Brush Hog Feeder $50.86 7A 4V 8Y View Lewis Laborers Burner $50.86 7A 4V 8Y View Lewis Laborers Caisson Worker $52.44 7A 4V 8Y View Lewis Laborers Carpenter Tender $50.86 7A 4V 8Y View Lewis Laborers Cement Dumper-paving $51.80 7A 4V 8Y View Lewis Laborers Cement Finisher Tender $50.86 7A 4V 8Y View Lewis Laborers Change House Or Dry $50.86 7A 4V 8Y View Shack Lewis Laborers Chipping Gun (30 Lbs. $51.80 7A 4V 8Y View And Over) Lewis Laborers Chipping Gun (Under 30 $50.86 7A 4V 8Y View Lbs.) Lewis Laborers Choker Setter $50.86 7A 4V 8Y View Lewis Laborers Chuck Tender $50.86 7A 4V 8Y View Lewis Laborers Clary Power Spreader $51.80 7A 4V 8Y View Lewis Laborers Clean-up Laborer $50.86 7A 4V 8Y View Lewis Laborers Concrete Dumper/Chute $51.80 7A 4V 8Y View Operator Lewis Laborers Concrete Form Stripper $50.86 7A 4V 8Y View Lewis Laborers Concrete Placement Crew $51.80 7A 4V 8Y View Lewis Laborers Concrete Saw $51.80 7A 4V 8Y View Operator/Core Driller Lewis Laborers Crusher Feeder $43.11 7A 4V 8Y View Lewis Laborers Curing Laborer $50.86 7A 4V 8Y View Lewis Laborers Demolition: Wrecking Ft $50.86 7A 4V 8Y View Moving (Incl. Charred Material) Lewis Laborers Ditch Digger $50.86 7A 4V 8Y View Lewis Laborers Diver $52.44 7A 4V 8Y View Lewis Laborers Drill Operator (Hydraulic, $51.80 7A 4V 8Y View Diamond) Lewis Laborers Dry Stack Walls $50.86 7A 4V 8Y View Lewis Laborers Dump Person $50.86 7A 4V 8Y View Lewis Laborers Epoxy Technician $50.86 7A 4V 8Y View Lewis Laborers Erosion Control Worker $50.86 7A 4V 8Y View Lewis Laborers Faller a Bucker Chain $51.80 7A 4V 8Y View Saw Lewis Laborers Fine Graders $50.86 7A 4V 8Y View Lewis Laborers Firewatch $43.11 7A 4V 8Y View Lewis Laborers Form Setter $50.86 7A 4V 8Y View Lewis Laborers Gabian Basket Builders $50.86 7A 4V 8Y View Lewis Laborers General Laborer $50.86 7A 4V 8Y View Lewis Laborers Grade Checker Et Transit $52.44 7A 4V 8Y View Person Lewis Laborers Grinders $50.86 7A 4V 8Y View Lewis Laborers Grout Machine Tender $50.86 7A 4V 8Y View Lewis Laborers Groutmen (Pressure) $51.80 7A 4V 8Y View Including Post Tension Beams Lewis Laborers Guardrail Erector $50.86 7A 4V 8Y View Lewis Laborers Hazardous Waste Worker $52.44 7A 4V 8Y View (Level A) Lewis Laborers Hazardous Waste Worker $51.80 7A 4V 8Y View (Level B) Lewis Laborers Hazardous Waste Worker $50.86 7A 4V 8Y View (Level C) Lewis Laborers High Scaler $52.44 7A 4V 8Y View Lewis Laborers Jackhammer $51.80 7A 4V 8Y View Lewis Laborers Laserbeam Operator $51.80 7A 4V 8Y View Lewis Laborers Maintenance Person $50.86 7A 4V 8Y View Lewis Laborers Manhole Builder-Mudman $51.80 7A 4V 8Y View Lewis Laborers Material Yard Person $50.86 7A 4V 8Y View Lewis Laborers Motorman-Dinky $51.80 7A 4V 8Y View Locomotive Lewis Laborers Nozzleman (Concrete $51.80 7A 4V 8Y View Pump, Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete & Rock, Sandblast, Gunite, Shotcrete, Water Blaster, Vacuum Blaster) Lewis Laborers Pavement Breaker $51.80 7A 4V 8Y View Lewis Laborers Pilot Car $43.11 7A 4V 8Y View Lewis Laborers Pipe Layer Lead $52.44 7A 4V 8Y View Lewis Laborers Pipe Layer/Tailor $51.80 7A 4V 8Y View Lewis Laborers Pipe Pot Tender $51.80 7A 4V 8Y View Lewis Laborers Pipe Reliner $51.80 7A 4V 8Y View Lewis Laborers Pipe Wrapper $51.801 7A 4V 8Y View Lewis Laborers Pot Tender $50.86 7A 4V 8Y View Lewis Laborers Powderman $52.44 7A 4V 8Y View Lewis Laborers Powderman's Helper $50.86 7A 4V 8Y View Lewis Laborers Power Jacks $51.80 7A 4V 8Y View Lewis Laborers Railroad Spike Puller - $51.80 7A 4V 8Y View Power Lewis Laborers Raker - Asphalt $52.44 7A 4V 8Y View Lewis Laborers Re-timberman S52.44 7A 4V 8Y View Lewis Laborers Remote Equipment $51.80 7A 4V 8Y View Operator Lewis Laborers Rigger/Signal Person S51.80 7A 4V 8Y View Lewis Laborers Rip Rap Person j $50.86 7A 4V 8Y View Lewis Laborers Rivet Buster $51.80 7A 4V 8Y View Lewis Laborers Rodder $51.80 7A 4V 8Y View Lewis Laborers Scaffold Erector $50.86 7A 4V 8Y View Lewis Laborers Scale Person $50.86 7A 4V 8Y View Lewis Laborers Sloper (Over 20") $51.80 7A 4V 8Y View Lewis Laborers Sloper Sprayer $50.86 7A 4V 8Y View Lewis Laborers Spreader (Concrete) $51.80 7A 4V 8Y View Lewis Laborers Stake Hopper $50.86 7A 4V 8Y View Lewis Laborers Stock Piler $50.86 7A 4V 8Y View Lewis Laborers Swinging $43.11 7A 4V 8Y View Stage/Boatswain Chair Lewis Laborers Tamper a Similar $51.80 7A 4V 8Y View Electric, Air& Gas Operated Tools Lewis Laborers Tamper (Multiple Et Self- $51.80 7A 4V 8Y View propelled) Lewis Labcrers Timber Person - Sewer $51.80 7A 4V 8Y View (Lagger, Sharer Et Cribber) Lewis Laborers Toolroom Person (at $50.86 7A 4V 8Y View Jobsite) Lewis Laborers Topper $50.86 7A 4V 8Y View Lewis Laborers Track Laborer $50.86 7A 4V 8Y View Lewis Laborers Track Liner (Power) $51.80 7A 4V 8Y View Lewis Laborers Traffic Control Laborer $46.10 7A 4V 9C View Lewis Laborers Traffic Control Supervisor $46.10 7A 4V 9C View Lewis Laborers Truck Spotter $50.86 7A 4V 8Y View Lewis Laborers Tugger Operator $51.80 7A 4V 8Y View Lewis Laborers Tunnel Work-Compressed S120.61 7A 4V 9B View Air Worker 0-30 psi Lewis Laborers Tunnel Work-Compressed S125.64 7A 4V 9B View Air Worker 30.01-44.00 psi Lewis Laborers Tunnel Work-Compressed S129.32 7A 4V 9B View Air Worker 44.01-54.00 psi Lewis Laborers Tunnel Work-Compressed S135.02 7A 4V 9B View Air Worker 54.01-60.00 psi Lewis Laborers Tunnel Work-Compressed S137.14 7A 4V 9B View Air Worker 60.01-64.00 psi Lewis Laborers Tunnel Work-Compressed 5142.24 7A 4V 9B View Air Worker 64.01-68.00 psi Lewis Laborers Tunnel Work-Compressed $144.14 7A 4V 9B View Air Worker 68.01-70.00 psi Lewis Laborers Tunnel Work-Compressed $146.14 7A 4V 9B View Air Worker 70.01-72.00 psi Lewis Laborers Tunnel Work-Compressed S148.14 7A 4V 9B View Air Worker 72.01-74.00 psi Lewis Laborers Tunnel Work-Guage and $52.54 7A 4V 8Y View Lock Tender Lewis Laborers Tunnel Work-Miner $52.54 7A 4V 8Y View Lewis Laborers Vibrator $51.80 7A 4V 8Y View Lewis Laborers Vinyl Seamer $50.86 7A 4V 8Y View Lewis Laborers Watchman $39.18 7A 4V 8Y View Lewis Laborers Welder $51.80 7A 4V 8Y View Lewis Laborers Well Point Laborer $51.80 7A 4V 8Y View Lewis Laborers Window Washer/Cleaner $39.18 7A 4V 8Y View Lewis Laborers - Underground General Laborer a $50.86 7A 4V 8Y View Sewer Et Water Topman Lewis Laborers - Underground Pipe Layer $51.80 7A 4V 8Y View Sewer Et Water Lewis Landscape Construction Landscape $39.18 7A 4V 8Y View Construction/Landscaping Or Planting Laborers Lewis Landscape Construction Landscape Operator $65.71 7A 3K 8X View Lewis Landscape Maintenance Groundskeeper $13.50 1 View Lewis Lathers Journey Level $62.44 5D 1H View Lewis Marble Setters Journey Level $58.82 5A 1M View Lewis Metal Fabrication (In Shop) Fitter $15.16 1 View Lewis Metal Fabrication (In Shop) Laborer S13.50 1 View Lewis Metal Fabrication (In Shop) Machine Operator $13.50 1 View Lewis Metal Fabrication (In Shop) Painter S13.50 1 View Lewis Metal Fabrication (In Shop) Welder $15.16 1 View Lewis Millwright Journey Level $63.94 7A 4C View Lewis Modular Buildings Cabinet Assembly $13.50 1 View Lewis Modular Buildings Electrician $13.50 1 View Lewis Modular Buildings Equipment Maintenance $13.50 1 View Lewis Modular Buildings Plumber $13.50 1 View Lewis Modular Buildings Production Worker $13.50 1 View Lewis Modular Buildings Tool Maintenance $13.50 1 View Lewis Modular Buildings Utility Person $13.50 1 View Lewis Modular Buildings Welder $13.50 1 View Lewis Painters Journey Level $43.40 6Z 2B View Lewis Pile Driver Crew Tender $67.31 7A 4C View Lewis Pile Driver Crew Tender/Technician $67.31 7A I 4C I View Lewis Pile Driver Hyperbaric Worker - $77.93 7A 4C View Compressed Air Worker 0- 30.00 PSI Lewis Pile Driver Hyperbaric Worker - $82.93 7A 4C View Compressed Air Worker 30.01 - 44.00 PSI Lewis Pile Driver Hyperbaric Worker - $86.93 7A 4C View Compressed Air Worker 44.01 - 54.00 PSI Lewis Pile Driver Hyperbaric Worker - $91.93 7A 4C View Compressed Air Worker 54.01 - 60.00 PSI Lewis Pile Driver Hyperbaric Worker - $94.43 7A 4C View Compressed Air Worker 60.01 - 64.00 PSI Lewis Pile Driver Hyperbaric Worker - $99.43 7A 4C View Compressed Air Worker 64.01 - 68.00 PSI Lewis Pile Driver Hyperbaric Worker - S101.43 7A 4C View Compressed Air Worker 68.01 - 70.00 PSI Lewis Pile Driver Hyperbaric Worker - S103.43 7A 4C View Compressed Air Worker 70.01 - 72.00 PSI Lewis Pile Driver Hyperbaric Worker - S105.43 7A 4C View Compressed Air Worker 72.01 - 74.00 PSI Lewis Pile Driver Journey Level $62.69 7A 4C View Lewis Plasterers Journey Level $59.42 7� 1R View Lewis Playground Et Park Journey Level $13.50 1 View Equipment Installers Lewis Plumbers Et Pipefitters Journey Level $74.72 5A 1G View Lewis Power Equipment Operators Asphalt Plant Operator $66.81 7A 3K 8X View Lewis Power Equipment Operators Assistant Engineers $62.85 7A 3K 8X View Lewis Power Equipment Operators Barrier Machine (zipper) $66.22 7A 3K 8X View Lewis Power Equipment Operators Batch Plant Operator: $66.22 7A 3K 8X View Concrete Lewis Power Equipment Operators Bobcat $62.85 7A 3K 8X View Lewis Power Equipment Operators Brokk - Remote $62.85 7A 3K 8X View Demolition Equipment Lewis Power Equipment Operators Brooms $62.85 7A 3K 8X View Lewis Power Equipment Operators Bump Cutter $66.22 7A 3K 8X View Lewis Power Equipment Operators Cableways $66.81 7A 3K 8X View Lewis Power Equipment Operators Chipper $66.22 7A 3K 8X View Lewis Power Equipment Operators Compressor $62.85 7A 3K 8X View Lewis Power Equipment Operators Concrete Pump: Truck $66.81 7A 3K 8X View Mount With Boom Attachment Over 42m Lewis Power Equipment Operators Concrete Finish Machine - $62.85 7A 3K 8X View laser Screed Lewis Power Equipment Operators Concrete Pump - Mounted $65.71 7A 3K 8X View Or Trailer High Pressure Line Pump, Pump High Pressure Lewis Power Equipment Operators Concrete Pump: Truck $66.22 7A 3K 8X View Mount With Boom Attachment Up To 42m Lewis Power Equipment Operators Conveyors $65.71 7A 3K 8X View Lewis Power Equipment Operators Cranes, 100 Tons - 199 $67.49 7A 3K 8X View Tons, Or 150 Ft Of Boom (including Jib With Attachments) Lewis Power Equipment Operators Cranes: 20 Tons Through $66.22 7A 3K 8X View 44 Tons With Attachments Lewis Power Equipment Operators Cranes: 200 tons to 299 $68.17 7A 3K 8X View tons, or 250' of boom (including jib with attachments) Lewis Power Equipment Operators Cranes: 300 tons and $68.84 7A 3K 8X View over, or 300' of boom (including jib with attachments) Lewis Power Equipment Operators Cranes: 45 Tons Through $66.81 7A 3K 8X View 99 Tons, Under 150' Of Boom (including Jib With Attachments) Lewis Power Equipment Operators Cranes: A-frame - 10 $62.85 7A 3K 8X View Tons And Under Lewis Power Equipment Operators Cranes: Friction 200 tons $68.84 7A 3K 8X View and over. Tower Cranes: over 250' in height from base to boom. Lewis Power Equipment Operators Cranes: Friction cranes $68.17 7A 3K 8X View through 199 tons Lewis Power Equipment Operators Cranes: Through 19 Tons $65.71 7A 3K 8X View With Attachments A- frame Over 10 Tons Lewis Power Equipment Operators Crusher $66.22 7A 3K 8X View Lewis Power Equipment Operators Deck Engineer/deck $66.22 7A 3K 8X View Winches (power) Lewis Power Equipment Operators Derricks, On Building $66.81 7A 3K 8X View Work Lewis Power Equipment Operators Dozers D-9 Ft Under $65.71 7A 3K 8X View Lewis Power Equipment Operators Drill Oilers: Auger Type, $65.71 7A 3K 8X View Truck Or Crane Mount Lewis Power Equipment Operators Drilling Machine $67.49 7A 3K 8X View Lewis Power Equipment Operators Elevator And Man-lift: $62.85 7A 3K 8X View Permanent And Shaft Type Lewis Power Equipment Operators Finishing Machine, $66.22 7A 3K 8X View Bidwell And Gamaco Et Similar Equipment Lewis Power Equipment Operators Forklift: 3000 Lbs And $65.71 7A 3K 8X View Over With Attachments Lewis Power Equipment Operators Forklifts: Under 3000 Lbs. $62.85 7A 3K 8X View With Attachments Lewis Power Equipment Operators Grade Engineer: Using $66.22 7A 3K 8X View Blueprints, Cut Sheets,etc. Lewis Power Equipment Operators Gradechecker/stakeman $62.85 7A 3K 8X View Lewis Power Equipment Operators Guardrail punch/Auger $66.22 7A 3K 8X View Lewis Power Equipment Operators Hard Tail End Dump $66.81 7A 3K 8X View Articulating Off- Road Equipment 45 Yards. a Over Lewis Power Equipment Operators Hard Tail End Dump $66.22 7A 3K 8X View Articulating Off-road Equipment Under 45 Yards Lewis Power Equipment Operators Horizontal/directional $65.71 7A 3K 8X View Drill Locator Lewis Power Equipment Operators Horizontal/directional $66.22 7A 3K 8X View Drill Operator Lewis Power Equipment Operators Hydralifts/Boom Trucks $65.71 7A 3K 8X View Over 10 Tons Lewis Power Equipment Operators Hydralifts/boom Trucks, $62.85 7A 3K 8X View 10 Tons And Under Lewis Power Equipment Operators Loader, Overhead 8 $67.49 7A 3K 8X View Yards. Et Over Lewis Power Equipment Operators Loader, Overhead, 6 $66.81 7A 3K 8X View Yards. But Not Including 8 Yards Lewis Power Equipment Operators Loaders, Overhead Under $66.22 7A 3K 8X View 6 Yards Lewis Power Equipment Operators Loaders, Plant Feed $66.22 7A 3K 8X View Lewis Power Equipment Operators Loaders: Elevating Type $65.71 7A 3K 8X View Belt Lewis Power Equipment Operators Locomotives, All $66.22 7A 3K 8X View Lewis Power Equipment Operators Material Transfer Device $66.22 7A 3K 8X View Lewis Power Equipment Operators Mechanics, All (Leadmen $67.49 7A 3K 8X View - $0.50 Per Hour Over Mechanic) Lewis Power Equipment Operators Motor patrol graders $66.81 7A l 3K 8X View Lewis Power Equipment Operators Mucking Machine, Mole, $66.81 7A 3K 8X View Tunnel Drill, Boring, Road Header And/or Shield Lewis Power Equipment Operators Oil Distributors, Blower $62.85 7A 3K 8X View Distribution Et Mulch Seeding Operator Lewis Power Equipment Operators Outside Hoists (elevators $65.71 7A 3K 8X View And Manlifts), Air Tuggers,strato Lewis Power Equipment Operators Overhead, Bridge Type $66.22 7A 3K 8X View 1 Crane: 20 Tons Through 44 Tons Lewis Power Equipment Operators Overhead, Bridge Type: $67.49 7A 3K 8X View 100 Tons And Over Lewis Power Equipment Operators Overhead, Bridge Type: $66.81 7A 3K 8X View 45 Tons Through 99 Tons Lewis Power Equipment Operators Pavement Breaker $62.85 7A 3K 8X View Lewis Power Equipment Operators Pile Driver (other Than $66.22 7A 3K 8X View Crane Mount) Lewis Power Equipment Operators Plant Oiler - Asphalt, $65.71 7A 3K 8X View Crusher Lewis Power Equipment Operators Posthole Digger, $62.85 7A 3K 8X View Mechanical Lewis Power Equipment Operators Power Plant $62.85 7A 3K J 8X View Lewis Power Equipment Operators Pumps - Water $62.85 7A 3K 8X View Lewis Power Equipment Operators Quad 9, HD 41, D10 And $66.81 7A 3K 8X View Over Lewis Power Equipment Operators Quick Tower - No Cab, $62.85 7A 3K 8X View Under 100 Feet In Height Based To Boom Lewis Power Equipment Operators Remote Control Operator $66.81 7A 3K 8X View On Rubber Tired Earth Moving Equipment Lewis Power Equipment Operators Rigger And Bellman $62.85 7A 3K 8X View Lewis Power Equipment Operators Rigger/Signal Person, $65.71 7A 3K 8X View Bellman (Certified) Lewis Power Equipment Operators Rollagon $66.81 7A 3K 8X View Lewis Power Equipment Operators Roller, Other Than Plant $62.85 7A 3K 8X View Mix Lewis Power Equipment Operators Roller, Plant Mix Or Multi- $65.71 7A 3K 8X View lift Materials Lewis Power Equipment Operators Roto-mill, Roto-grinder $66.22 7A 3K 8X View Lewis Power Equipment Operators Saws - Concrete $65.71 7A 3K 8X View Lewis Power Equipment Operators Scraper, Self Propelled $66.22 7A 3K 8X View Under 45 Yards Lewis Power Equipment Operators Scrapers - Concrete Et $65.71 7A 3K 8X View Carry All Lewis Power Equipment Operators Scrapers, Self-propelled: $66.81 7A 3K 8X View 45 Yards And Over Lewis Power Equipment Operators Service Engineers - $65.71 7A 3K 8X View Equipment Lewis Power Equipment Operators Shotcrete/gunite $62.85 7A 3K 8X View Equipment Lewis Power Equipment Operators Shovel, Excavator, $65.71 7A 3K 8X View Backhoe, Tractors Under 15 Metric Tons Lewis Power Equipment Operators Shovel, Excavator, $66.81 7A 3K 8X View Backhoe: Over 30 Metric Tons To 50 Metric Tons Lewis Power Equipment Operators Shovel, Excavator, $66.22 7A 3K 8X View Backhoes, Tractors: 15 To 30 Metric Tons Lewis Power Equipment Operators Shovel, Excavator, $67.49 7A 3K 8X View Backhoes: Over 50 Metric Tons To 90 Metric Tons Lewis Power Equipment Operators Shovel, Excavator, $68.17 7A 3K 8X View Backhoes: Over 90 Metric Tons Lewis Power Equipment Operators Slipform Pavers $66.81 7A 3K 8X View Lewis Power Equipment Operators Spreader, Topsider Et $66.81 7A 3K 8X View Screedman Lewis Power Equipment Operators Subgrader Trimmer $66.22 7A 3K 8X View Lewis Power Equipment Operators Tower Bucket Elevators $65.71 7A 3K 8X View Lewis Power Equipment Operators Tower crane over 175' $68.17 7A 3K 8X View through 250'in height, base to boom Lewis Power Equipment Operators Tower Crane Up: To 175' $67.49 7A 3K 8X View In Height, Base To Boom Lewis Power Equipment Operators Transporters, All Track Or $66.81 7A 3K 8X View Truck Type Lewis Power Equipment Operators Trenching Machines $65.71 7A 3K 8X View Lewis Power Equipment Operators Truck Crane Oiler/driver $66.22 7A 3K 8X View - 100 Tons And Over Lewis Power Equipment Operators Truck Crane Oiler/driver $65.71 7A 3K 8X View Under 100 Tons Lewis Power Equipment Operators Truck Mount Portable $66.22 7A 3K 8X View Conveyor Lewis Power Equipment Operators Welder $66.81 7A 3K 8X View Lewis Power Equipment Operators Wheel Tractors, Farman $62.85 7A 3K 8X View Type Lewis Power Equipment Operators Yo Yo Pay Dozer $66.22 7A 3K 8X View Lewis Power Equipment Asphalt Plant Operator $66.81 7A 3K 8X View Operators- Underground Sewer a Water Lewis Power Equipment Assistant Engineers $62.85 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Barrier Machine (zipper) $66.22 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Batch Plant Operator: $66.22 7A 3K 8X View Operators- Underground Concrete Sewer & Water Lewis Power Equipment Bobcat $62.85 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Brokk - Remote $62.85 7A 3K 8X View Operators- Underground Demolition Equipment Sewer Et Water Lewis Power Equipment Brooms $62.85 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Bump Cutter $66.22 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Cableways $66.81 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Chipper $66.22 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Compressor $62.85 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Concrete Pump: Truck $66.81 7A 3K 8X View Operators- Underground Mount With Boom Sewer& Water Attachment Over 42m Lewis Power Equipment Concrete Finish Machine - $62.85 7A 3K 8X View Operators- Underground laser Screed Sewer & Water Lewis Power Equipment Concrete Pump - Mounted $65.71 7A 3K 8X View Operators- Underground Or Trailer High Pressure Sewer& Water Line Pump, Pump High Pressure Lewis Power Equipment Concrete Pump: Truck $66.22 7A 3K 8X View Operators- Underground Mount With Boom Sewer & Water Attachment Up To 42m Lewis Power Equipment Conveyors $65.71 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Cranes, 100 Tons - 199 $67.49 7A 3K 8X View Operators- Underground Tons, Or 150 Ft Of Boom Sewer & Water (including Jib With Attachments) Lewis Power Equipment Cranes, 200 tons to 299 $68.17 7A 3K 8X View Operators- Underground tons, or 250' of boom Sewer& Water (including jib with attachments) Lewis Power Equipment Cranes, Over 300 Tons, $68.84 7A 3K 8X View Operators- Underground Or 300' Of Boom Including Sewer & Water Jib With Attachments Lewis Power Equipment Cranes: 20 Tons Through $66.22 7A 3K 8X View Operators- Underground 44 Tons With Sewer & Water Attachments Lewis Power Equipment cranes: 300 tons and $68.84 7A 3K 8X View Operators- Underground over, or 300' of boom Sewer & Water (including jib with attachments) Lewis Power Equipment Cranes: 45 Tons Through $66.81 7A 3K 8X View Operators- Underground 99 Tons, Under 150'Of Sewer &Water Boom (including Jib With Attachments) Lewis Power Equipment Cranes: A-frame - 10 $62.85 7A 3K 8X View Operators- Underground Tons And Under Sewer & Water Lewis Power Equipment Cranes: Friction 200 tons $68.84 7A 3K 8X View Operators- Underground and over. Tower Cranes: Sewer & Water over 250' in height from base to boom. Lewis Power Equipment Cranes: Friction cranes $68.17 7A 3K 8X View Operators- Underground through 199 tons Sewer & Water Lewis Power Equipment Cranes: Through 19 Tons $65.71 7A 3K 8X View Operators- Underground With Attachments A- Sewer & Water frame Over 10 Tons Lewis Power Equipment Crusher $66.22 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Deck Engineer/deck $66.22 7A 3K 8X View Operators- Underground Winches (power) Sewer & Water Lewis Power Equipment Derricks, On Building $66.81 7A 3K 8X View Operators- Underground Work Sewer & Water Lewis Power Equipment Dozers D-9 & Under $65.71 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Drill Oilers: Auger Type, $65.71 7A 3K 8X View Operators- Underground Truck Or Crane Mount Sewer & Water Lewis Power Equipment Drilling Machine $67.49 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Elevator And Man-lift: $62.85 7A 3K 8X View Operators- Underground Permanent And Shaft Sewer a Water Type Lewis Power Equipment Finishing Machine, $66.22 7A 3K 8X View Operators- Underground Bidwell And Gamaco a Sewer a Water Similar Equipment Lewis Power Equipment Forklift: 3000 Lbs And $65.71 7A 3K 8X View Operators- Underground Over With Attachments Sewer a Water Lewis Power Equipment Forklifts: Under 3000 Lbs. $62.85 7A 3K 8X View Operators- Underground With Attachments Sewer Et Water Lewis Power Equipment Grade Engineer: Using $66.22 7A 3K 8X View Operators- Underground Blueprints, Cut Sewer Et Water Sheets,etc. Lewis Power Equipment Gradechecker/stakeman $62.85 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Guardrail punch/Auger $66.22 7A 3K 8X View Operators- Underground Sewer & Water Lewis Power Equipment Hard Tail End Dump $66.81 7A 3K 8X View Operators- Underground Articulating Off- Road Sewer & Water Equipment 45 Yards. & Over Lewis Power Equipment Hard Tail End Dump $66.22 7A 3K 8X View Operators- Underground Articulating Off-road Sewer a Water Equipment Under 45 Yards Lewis Power Equipment Horizontal/directional $65.71 7A 3K 8X View Operators- Underground Drill Locator Sewer a Water Lewis Power Equipment Horizontal/directional $66.22 7A 3K 8X View Operators- Underground Drill Operator Sewer a Water Lewis Power Equipment Hydralifts/Boom Trucks $65.71 7A 3K 8X View Operators- Underground Over 10 Tons Sewer a Water Lewis Power Equipment Hydralifts/boom Trucks, $62.85 7A 3K 8X View Operators- Underground 10 Tons And Under Sewer a Water Lewis Power Equipment Loader, Overhead 8 $67.49 7A 3K 8X View Operators- Underground Yards. & Over Sewer a Water Lewis Power Equipment Loader, Overhead, 6 $66.81 7A 3K 8X View Operators- Underground Yards. But Not Including 8 Sewer a Water Yards Lewis Power Equipment Loaders, Overhead Under $66.22 7A 3K 8X View Operators- Underground 6 Yards Sewer a Water Lewis Power Equipment Loaders, Plant Feed $66.22 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Loaders: Elevating Type $65.71 7A 3K 8X View Operators- Underground Belt Sewer Et Water Lewis Power Equipment Locomotives, All $66.22 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Material Transfer Device $66.22 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Mechanics, All (Leadmen $67.49' 7A 3K 8X View Operators- Underground - $0.50 Per Hour Over Sewer Et Water Mechanic) Lewis Power Equipment Motor patrol graders $66.81 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Mucking Machine, Mole, $66.81 7A 3K 8X View Operators- Underground Tunnel Drill, Boring, Road Sewer Et Water Header And/or Shield Lewis Power Equipment Oil Distributors, Blower $62.85 7A 3K 8X View Operators- Underground Distribution Et Mulch Sewer Et Water Seeding Operator Lewis Power Equipment Outside Hoists (elevators $65.71 7A 3K 8X View Operators- Underground And Manlifts), Air Sewer Et Water Tuggers,strato Lewis Power Equipment Overhead, Bridge Type $66.22 7A 3K 8X View Operators- Underground Crane: 20 Tons Through Sewer Et Water 44 Tons Lewis Power Equipment Overhead, Bridge Type: $67.49 7A 3K 8X View Operators- Underground 100 Tons And Over Sewer & Water Lewis Power Equipment Overhead, Bridge Type: $66.81 7A 3K 8X View Operators- Underground 45 Tons Through 99 Tons Sewer Et Water Lewis Power Equipment Pavement Breaker $62.85 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Pile Driver (other Than $66.22 7A 3K 8X View Operators- Underground Crane Mount) Sewer Et Water Lewis Power Equipment Plant Oiler - Asphalt, $65.71 7A 3K 8X View Operators- Underground Crusher Sewer Et Water Lewis Power Equipment Posthole Digger, $62.85 7A 3K 8X View Operators- Underground Mechanical Sewer Et Water Lewis Power Equipment Power Plant $62.85 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Pumps - Water 1 562.85 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Quad 9, HD 41, D10 And $66.81 7A 3K 8X View Operators- Underground Over Sewer Et Water Lewis Power Equipment Quick Tower - No Cab, $62.85 7A 3K 8X View Operators- Underground Under 100 Feet In Height Sewer Et Water Based To Boom Lewis Power Equipment Remote Control Operator $66.81 7A 3K 8X View Operators- Underground On Rubber Tired Earth Sewer Et Water Moving Equipment Lewis Power Equipment Rigger And Bellman $62.85 7A 3K 8X View Operators- Underground Sewer a Water Lewis Power Equipment Rigger/Signal Person, $65.71 7A 3K 8X View Operators- Underground Bellman (Certified) Sewer Et Water Lewis Power Equipment Rollagon $66.81 7A 3K 8X View Operators- Underground Sewer a Water Lewis Power Equipment Roller, Other Than Plant $62.85 7A 3K 8X View Operators- Underground Mix Sewer Et Water Lewis Power Equipment Roller, Plant Mix Or Multi- $65.71 7A 3K 8X View Operators- Underground lift Materials Sewer Et Water Lewis Power Equipment Roto-mill, Roto-grinder $66.22 7A 3K 8X View Operators- Underground Sewer 8 Water Lewis Power Equipment Saws - Concrete $65.71 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Scraper, Self Propelled $66.22 7A 3K 8X View Operators- Underground Under 45 Yards Sewer Et Water Lewis Power Equipment Scrapers - Concrete Et $65.71 7A 3K 8X View Operators- Underground Carry All Sewer Et Water Lewis Power Equipment Scrapers, Self-propelled: $66.81 7A 3K 8X View Operators- Underground 45 Yards And Over Sewer Et Water Lewis Power Equipment Service Engineers - $65.71 7A 3K 8X View Operators- Underground Equipment Sewer Et Water Lewis Power Equipment Shotcrete/gunite $62.85 7A 3K 8X View Operators- Underground Equipment Sewer Et Water Lewis Power Equipment Shovel, Excavator, $65.71 7A 3K 8X View Operators- Underground Backhoe, Tractors Under Sewer a Water 15 Metric Tons Lewis Power Equipment Shovel, Excavator, $66.81 7A 3K 8X View Operators- Underground Backhoe: Over 30 Metric Sewer a Water Tons To 50 Metric Tons Lewis Power Equipment Shovel, Excavator, $66.22 7A 3K 8X View Operators- Underground Backhoes, Tractors: 15 To Sewer a Water 30 Metric Tons Lewis Power Equipment Shovel, Excavator, $67.49 7A 3K 8X View Operators- Underground Backhoes: Over 50 Metric Sewer Et Water Tons To 90 Metric Tons Lewis Power Equipment Shovel, Excavator, $68.17 7A 3K 8X View Operators- Underground Backhoes: Over 90 Metric Sewer Et Water Tons Lewis Power Equipment Slipform Pavers $66.81 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Spreader, Topsider Et $66.81 7A 3K 8X View Operators- Underground Screedman Sewer a Water Lewis Power Equipment Subgrader Trimmer $66.22 7A 3K 8X View Operators- Underground Sewer a Water Lewis Power Equipment Tower Bucket Elevators $65.71 7A 3K 8X View Operators- Underground Sewer a Water Lewis Power Equipment Tower crane over 175' $68.17 7A 3K 8X View Operators- Underground through 250' in height, Sewer Et Water base to boom Lewis Power Equipment Tower Crane: Up To 175' $67.49 7A 3K 8X View Operators- Underground In Height, Base To Boom Sewer Et Water Lewis Power Equipment Transporters, All Track Or $66.81 7A 3K 8X View Operators- Underground Truck Type Sewer Et Water Lewis Power Equipment Trenching Machines $65.71 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Truck Crane Oiler/driver $66.22 7A 3K 8X View Operators- Underground - 100 Tons And Over Sewer a Water Lewis Power Equipment Truck Crane Oiler/driver $65.71 7A 3K 8X View Operators- Underground Under 100 Tons Sewer Et Water Lewis Power Equipment Truck Mount Portable $66.22 7A 3K 8X View Operators- Underground Conveyor Sewer Et Water Lewis Power Equipment Welder $66.81 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Equipment Wheel Tractors, Farmatl $62.85 7A 3K 8X View Operators- Underground Type Sewer Et Water Lewis Power Equipment Yo Yo Pay Dozer $66.22 7A 3K 8X View Operators- Underground Sewer Et Water Lewis Power Line Clearance Tree Journey Level In Charge S50.96 5A 4A View Trimmers Lewis Power Line Clearance Tree Spray Person $48.35 5A 4A View Trimmers Lewis Power Line Clearance Tree Tree Equipment Operator $50.96 5A 4A View Trimmers Lewis Power Line Clearance Tree Tree Trimmer $45.54 5A 4A View Trimmers Lewis Power Line Clearance Tree Tree Trimmer $34.51 5A 4A View Trimmers Groundperson Lewis Refrigeration Et Air Journey Level $74.71 5A 1G View Conditioning Mechanics Lewis Residential Brick Mason Journey Level $21.96 1 View Lewis Residential Carpenters Journey Level $24.89 1 View Lewis Residential Cement Masons Journey Level $16.79 1 View Lewis Residential Drywall Journey Level $36.07 1 View Applicators Lewis Residential Drywall Tapers Journey Level $24.48 1 View Lewis Residential Electricians Journey Level $34.53 5A 1 B View Lewis Residential Glaziers Journey Level $25.40 1 View Lewis Residential Insulation Journey Level $17.05 1 View Applicators Lewis Residential Laborers Journey Level $23.10 1 View Lewis Residential Marble Setters Journey Level $21.96 1 View Lewis Residential Painters Journey Level $18.76 1 View Lewis Residential Plumbers Et Journey Level $26.35 1 View Pipefitters Lewis Residential Refrigeration Et Journey Level $32.14 1 View Air Conditioning Mechanics Lewis Residential Sheet Metal Journey Level $33.28 1 View Workers Lewis Residential Soft Floor Journey Level $14.86 1 View Layers Lewis Residential Sprinkler Fitters Journey Level $20.28 1 View (Fire Protection) Lewis Residential Stone Masons Journey Level $21.96 1 View Lewis Residential Terrazzo Journey Level $14.86 1 View Workers Lewis Residential TerrazzoTile Journey Level $14.86 1 View Finishers Lewis Residential Tile Setters Journey Level $14.86 1 View Lewis Roofers Journey Level $52.87 5A 20 View Lewis Roofers Using Irritable Bituminous $55.87 5A 20 View Materials Lewis Sheet Metal Workers Journey Level (Field or $85.88 7F 1E View Shop) Lewis Sign Makers a Installers Journey Level $18.04 1 View (Electrical) Lewis Sign Makers Et Installers Journey Level $50.86 7A 4V 8Y View (Non-Electrical) Lewis Soft Floor Layers Journey Level $51.07 5A 3J View Lewis Solar Controls For Windows Journey Level $13.50 1 View Lewis Sprinkler Fitters (Fire Journey Level $61.68 7J 1 R View Protection) Lewis Stage Rigging Mechanics Journey Level $13.50 1 View (Non Structural) Lewis Stone Masons Journey Level $58.82 5A 1M View Lewis Street And Parking Lot Journey Level $16.00 1 View Sweeper Workers Lewis Surveyors Chain Person $65.11 7A 3K View Lewis Surveyors Instrument Persion $65.71 7A 3K View Lewis Surveyors Party Chief $66.81 7A 3K View Lewis Telecommunication Journey Level $44.70 6Z 1 B View Technicians Lewis Telephone Line Cable Splicer $41.81 5A 2B View Construction - Outside Lewis Telephone Line Hole Digger/Ground $23.53 5A 2B View Construction - Outside Person Lewis Telephone Line Installer (Repairer) $40.09 5A 2B View Construction - Outside Lewis Telephone Line Special Aparatus Installer $41.81 5A 2B View Construction - Outside I Lewis Telephone Line Special Apparatus $40.99 5A 2B View Construction - Outside Installer II Lewis Telephone Line Telephone Equipment $41.81 5A 2B View Construction - Outside Operator (Heavy) Lewis Telephone Line Telephone Equipment $38.92 5A 2B View Construction - Outside Operator (Light) Lewis Telephone Line Telephone Lineperson $38.92 5A 2B View Construction - Outside Lewis Telephone Line Television Groundperson $22.32 5A 2B View Construction - Outside Lewis Telephone Line Television $29.60 5A 2B View Construction - Outside Lineperson/Installer Lewis Telephone Line Television System $35.20 5A 2B View Construction - Outside Technician Lewis Telephone Line Television Technician $31.67 5A 2B View Construction - Outside Lewis Telephone Line Tree Trimmer $38.92 5A 2B View Construction - Outside Lewis Terrazzo Workers Journey Level $54.06 5A 1M View Lewis Tile Setters Journey Level $54.06 5A 1M View Lewis Tile, Marble & Terrazzo Finisher $44.89 5A 18 View Finishers Lewis Traffic Control Stripers Journey Level $47.68 7A 1K View Lewis Truck Drivers Asphalt Mix Over 16 Yards $60.84 5D 4Y 8L View Lewis Truck Drivers Asphalt Mix To 16 Yards $60.00 5D 4Y 8L View Lewis Truck Drivers Dump Truck $60.00 5D 4Y 8L View Lewis Truck Drivers Dump Truck & Trailer $60.84 5D 4Y 8L View Lewis Truck Drivers Other Trucks $60.84 5D 4Y 8L View Lewis Truck Drivers - Ready Mix Transit Mix $60.84 5D 4Y 8L View Lewis Well Drillers & Irrigation Irrigation Pump Installer $18.18 1 View Pump Installers Lewis Well Drillers & Irrigation Oiler $13.50 1 View Pump Installers Lewis Well Drillers & Irrigation Well Driller $18.00 1 View Pump Installers 6 . PERFORMANCE BOND PERFORMANCE BOND FOR Bond No. LEWIS COUNTY, WASHINGTON WE, dibla I,Insert legal name of Contractor) (Insert trade name of Contractor.if any) (hereinafter"Principal"),and (hereinafter "Surety"), are held and firmly bound unto LEWIS COUNTY, WASHINGTON (hereinafter "County"), as Obligee, in an amount (in lawful money of the United States of America)equal to the total compensation and expense reimbursement payable to Principal for satisfactory completion of Principal's work under Contract No. between Principal and County, which total is initially Dollars(S ), for the payment of which sum Principal and Surety bind themselves, their executors, administrators, legal representatives, successors and assigns,jointlyand severally, firmlybythesepresents.. Said contract(hereinafter referred to as"the Contract" 8n > ) is for and is made a part hereof by this reference. The Contract includes the original agreement as well as all documents attached thereto or made a part thereof and amendments, change orders,and any other document modifying,adding to or deleting from said Contract any portion thereof. This Bond is executed in accordance with the laws of the State of Washington, and is subject to all provisions thereof and the ordinances of County insofar as they are not in conflict therewith, and is entered into for the use and benefit of County, and all laborers, mechanics,subcontractors,and materialmen,and all persons who supply such person or persons,or subcontractors,with provisions or supplies for the carrying on of the work covered by Contract No. between the below- named Contractor and County for , a copy of which Contract, by this reference is made a part hereof and is hereinafter referred to as "the Contract." (The Contract as defined herein includes the aforesaid agreement together with all of the Contract documents including addenda, exhibits, attachments, modifications, alterations, and additions thereto, deletions therefrom, amendments and any other document or provision attached to or incorporated into the Contract) THE CONDITION OF THIS OBLIGATION is such that if Contractor shall promptly and faithfully performs the Contract, then this obligation shall be null and void;otherwise it shall remain in full force and effect. THE PARTIES FURTHER ACKNOWLEDGE&AGREE AS FOLLOWS: (1) Surety hereby consents to,and waives notice of, any alteration, change order, or other modification of the Contract and any extension of time made by County,except that any single or cumulative change order amounting to more than twenty-five percent(25%)of the penal sum of this bond shall require Surety's written consent. (2) Surety recognizes that the Contract includes provisions for additions,deletions,and modifications to the work or Contract Time and the amounts payable to Contractor. Subject to the limitations contained in paragraph(1)above,no such change or any combination thereof,shall void or impair Surety's obligation hereunder. (3) Surety shall indemnify, defend and protect County against any claim of direct or indirect loss resulting from the failure: (a) Of the Contractor (or any of the employees, subcontractors, or lower tier subcontractors of the Contractor)to faithfully perform the Contract,or (b) Of the Contractor (or the subcontractors or lower tier subcontractors of the Contractor) to pay all laborers, mechanics, subcontractors, lower tier subcontractors, material person, or any other person who provides supplies or provisions for carrying out the work. (4) Whenever County has declared Contractor to be in default and County has given Surety written notice of such declaration, Surety shall promptly (in no event more than thirty [30] days following receipt of such notice), specify, in written notice to County,which of the following actions Surety intends to take to remedy such default,and thereafter shall: (a) Remedy the default within fifteen(15)days after its notice to County,as stated in such notice;or (b) Assume within fifteen(15)days following its notice to County,full responsibility for the completion of the Contract in accordance with all of its provisions, as stated in such notice, and become entitled to payment of the balance of the Contract sum as provided in the Contract;or (c) Pay County upon completion of the Contract, in cash,the cost of completion together with all other reasonable costs and expenses incurred by County as a result of Contractor's default, including but not limited to those incurred by County to mitigate its losses,which may include but are not limited to attorneys'fees and the cost of efforts to complete the work prior to Surety's exercising any option available to it under this Bond;or (d) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions,and upon a determination by County and Surety jointly of the lowest responsible bidder, arrange for one or more agreements between such bidder and County, and make available as work progresses (even though there is a default or a succession of defaults under such agreement(s) for completion arranged for under this paragraph)sufficient funds to pay the cost of completion less the balance of the Contract price,but not exceeding,including other costs and damages for which Surety may be liable hereunder,the penal sum of this Bond. The term"balance of the Contract price,"as used in this paragraph,shall mean the total amount payable by County to Contractor under the Contract,less the amount properly paid by County to Contractor. (5) If County commences suit and obtains judgment against Surety for recovery hereunder, then Surety, in addition to such judgment, shall pay all costs and attorneys' fees incurred by County in enforcement of County's rights hereunder. The venue for any action arising out of or in connection with this bond shall be in Lewis County,Washington. (6) No right or action shall accrue on this Bond to or for the use of any person or corporation other than Lewis County,except as herein provided. (7) No.rider, amendment or other document modifies this Bond except as follows, which by this reference is incorporated herein: SURETY'S QUALIFICATIONS:Every Surety named on this bond must appear on the United States Treasury Department's most current list(Circular 570 as amended or superseded)and be authorized by the Washington State Insurance Commissioner to transact business as a surety in the State of Washington. In addition,the Surety must have a current rating of at least A-:VII in A.M.Best's Key Rating Guide. INSTRUCTIONS FOR SIGNATURES: This bond must be signed by the president or a vice-president of a corporation;the managing general partner of a partnership;managing joint venturer of a joint venture;manager of a limited liability company or,if no manager has been designated, a member of such LLC;a general partner of a limited liability partnership;or the owner(s)of a sole proprietorship. If the bond is signed by any other representative, the Principal must attach currently-dated, written proof of that signer's authority to bind the Principal, identifying and quoting the provision in the corporate articles of incorporation,bylaws,Board resolution,partnership agreement,certificate of formation,or'other document authorizing delegation of signature authority to such signer, and confirmation acceptable to the County that such delegation was in effect on the date the bond was signed. A NOTARY PUBLIC MUST ACKNOWLEDGE EACH SIGNATURE BELOW. FOR THE SURETY: FOR THE PRINCIPAL: By By: (Signature of Attorney-in-Fact) (Signature of authorized signer for Contractor) (Type or print name of Attorney-in-Fact) (Type or print name of signer for Contractor) (Type or print telephone number for Attorney-in-Fact) (Type or print title of signer for Contractor) STATE OF ) ss: ACKNOWLEDGMENT FOR CONTRACTOR COUNTY OF ) On this day of , ,before me a notary public in and for the State of ,duly commissioned and sworn, personally appeared ,the person described in and who executed the foregoing bond,and acknowledged to me that signed and sealed said bond as the free and voluntary act and deed of the Contractor so identified in the foregoing bond for the uses and purposes therein mentioned,and on oath stated that is authorized to execute said bond for the Contractor named therein. WITNESS my hand and official seal hereto affixed the day and year in this certificate first above written. -- (Signature of Notary Public) (Print or type name of Notary Public) Notary Public in and for the State of residing at My commission expires SEAL 4 STATE OF ) ss: ACKNOWLEDGMENT FOR SURETY COUNTY OF ) On this day of , ,before me a notary public in and for the State of ,duly commissioned and sworn, personally appeared ,Attorney-in-Fact for the Surety that executed the foregoing bond,and acknowledged said bond to be the free and voluntary act and deed of the Surety for the uses and purposes therein mentioned,and on oath stated that is authorized to execute said bond on behalf of the Surety,and that the seal affixed on said bond or the annexed Power of Attorney is the corporate seal of said Surety.WITNESS my band and official seal hereto affixed the day and year in this certificate first above written. (Signature of Notary Public) (Print or type name of Notary Public) Notary Public in and for the State of residing at My commission expires SEAL 4 7 . CERTIFICATE OF INSURANCE EXHIBIT 1 --INSURANCE COVERAGE REQUIREMENTS ✓ INDICATES WHAT TYPE OF INSURANCE IS REQUIRED TYPE OF INSURANCE LIMITS OF LIABILITY Each Aggregate Occurrence GENERAL LIABILITY ✓ Comprehensive Form Bodily Injury $1,000,000 $1,000,000 ✓ Premises-Operations Property Damage S1,000,000 $1,000,000 Explosion&Collapse Hazard Underground Hazard OR ✓ Products/Completed Operations Hazard ✓ Contractual Insurance Bodily Injury and Property Damage $1,000,000 $1,000,000 Combined Single Limit ✓ Broad Form Property Damage, Incl. Care,Custody Control ✓ Independent Contractors ✓ Personal Injury Personal Injury $1,000,000 $1,000,000 AUTOMOBILE LIABILITY ✓ Comprehensive Form Bodily Injury(Each Person) $500,000 ✓ Owned Bodily Injury(Each Accident) $500,000 ✓ Hired Property Damage OR S500,000 ✓ Non-Owned Bodily Injury&Property Damage $500,000 Combined Single Limit EXCESS LIABILITY(Over and above automobile and general liability Umbrella Form Bodily Injury/Property Damage $1,000,000 $1,000,000 Combined OR ✓ Excess Liability Gap Layer $500,000 $500,000 ✓ WORKER'S COMPENSATION and Statutory ✓ EMPLOYER LIABILITY $1,000,000 OTHER Builder's All Risk Amount of Contract Price $ Errors&Omissions(Professional Liability) $500,000 Please indicate: Claims-Made Form: , Occurrence Form: Extending Reporting Provisions Avail. The Contractor's insurance company must provide a certificate of insurance on the Lewis County form showing the above required coverage and modified to conform to the following endorsement. The following endorsement must also be signed by the insurer. FORM LEWIS COUNTY WA THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY. 12.16.03Mir CERTIFICATE OF INSURANCE THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE CS-FACII. COVERAGE AFFORDED BY THE POLICIES BELOW. INSURED(Legal name and business address) CERTIFICATE HOLDER: CONTRACT NUMBER LEWIS COUNTY,WASHINGTON FACILITIES DEPT. • LEWIS COUNTY HISTORICAL COURTHOUSE DATE ISSUED: 351 N.W.NORTH STREET CHEHALIS,WASHINGTON 98532 PROJECT DESCRIPTION'LOCATIONS/VEHICLES 1 RESTRICTIONS I SPECIAL ITEMS: This is to certif•that •olicies of Insurance listed below have been issued to the Insured named above for the.olicv.eriod indicated. CO TYPE OF INSURANCE POLICY NUMBER Date Policy Date Policy ALL LIMITS IN THOUSANDS LTR Effective Expires (MMiDD/YY) (MM,DD/YY) GENERAL LIABILITY General Aggregate $ Commercial General Liability Products CompiOps Aggregate S IClaims Made El Occurrence Personal&Advertising Injury S Owner's&Contractors Protection Each Occurrence S Fire Damage(Any One Fire) $ Deductible $ Medical Expense(Any One Person) S AUTOMOBILE LIABILITY _ Any Auto CSL S All Owned Autos Bodily Injury _ Scheduled Autos (per person) S Hired Autos Bodily Injury _ Non-Owned Autos (per accident) S Garage Liability Property Deductible $ Damage $ EXCESS LIABILITY Each Occurrence Ageregate Other Than Umbrella Form $ S WORKERS STATUTORY COMPENSATION S (Each Accident) S (Disease Policy Limit) AND S (Disease-Each Employee) EMPLOYER'S LIABILITY OTHER ADDITIONAL PROVISIONS LEWIS COUNTY is included as additional insured as related to the above-mentioned project. Should any of the above described policies be cancelled before the expiration date thereof,the issuing Company must deliver or mail not less than 45 days written notice to the above Certificate Holder,per RCW 48.18.290 COMPANIES AFFORDING COVERAGE ISSUING COMPANY,AGENT OR REPRESENTATIVE NOTE: Attach a separate sheet to this certificate giving all the company names and their percentage of coverage,if NAME: clarification is needed, A ADDRESS: = B " Authorized S gnature C c co c. E 0 D U E BOCC AGENDA ITEM SUMMARY Resolution: BOCC Meeting Date: March 9, 2020 Suggested Wording for Agenda Item: Agenda Type: Deliberation Award contract to Olympic Roofing to remove and replace health building roof. Contact: Matt Patana Phone: 360 740-1459 Department: CS - Central Services (including SWWF and Facilities) Description: Award of Contract to replace roof on the Public Health and Services Building. Approvals: Publication Requirements: Publications: User Status PA's Office Pending Steve Walton Pending Steve Wohld Pending Additional Copies: Cover Letter To: